Download - Luke Boissevain Current Resume
Luke Boissevain
Mobile: 0405 118 131
E-Mail: [email protected]
Address: 2 Macalister place,Smithfield, Cairns4879
Joining Time: Immediately Available
CAREER OBJECTIVE
To further my knowledge and experience in leading hand to supervisor roles.
CERTIFICATES
Cert II Small Motors -Tafe Cert II Workplace Welding -Tafe Year 12
LICENCES/TICKETS
High Risk Work Card Number : 0003017593 03 Blue Card Number : 0675536
C1 ( crane up to 100 ton) Advanced Riggers Scaffold basic Forklift EWP Blue Card MSIC Card
“C” Driving Licence HR Learners
SSI dive masters Coxswains Marine Radio ticket
S11 Generic coal Induction
Luke Boissevain 0405118131 [email protected] Page 1
SKILLS
Leading hand up to 60 personal Allocations of cranes and crew Job planning Heavy Lift Crew Steel Erection Mechanical Rigging Installation of pipe work Assembled cranes up to 600 ton Erection and dismantle of pin jib cranes Hydraulic cranes up to 300 ton Pre cast panels Pre cast bridge beams Pre cast pit ,culverts ,manhole’s Plant commissioning Plan Reading Scaffolding Post-Tension Stressing Pre-Tension Stressing Concreting Painting General labouring Trade Assistant
• Fitters • Boiler Makers • Pipe fitters/layers
Luke Boissevain [email protected] Page 2
EMPLOYMENT HISTORY
Employer: Leighton Contractors Ichthys Project Inducted and voc’d
Period of Employment: 7 months Position: Leading hand Industry: Oil and gas ConstructionDuties:
Allocation of cranes and crew (up to 40 personnel) over multiple work fronts
Job planning - suiting correct size crane for location and work scope Transfers of precast units from laydown to work front On site consultation to personal Hazard identification Incident reporting procedures Organisation of tracking movements in coordination with traffic control
Employer: WALZ ConstructionPeriod of Employment: 5 years Position: Leading hand Industry: Mining / Oil and Gas ConstructionDuties:
Coal mining construction Iron ore mining construction Allocation of cranes and crew (up to 60 personnel) over multiple work
fronts Job planning - suiting correct size crane for location and work scope Transfers of precast units from laydown to work front On site consultation to personal Hazard identification Incident reporting procedures Hydraulic and pin jib work Pin jib erection and dismantle Duel Crane lifts up to 110 tonne Deconstruction of mine/Wash plant Erection and dismantle of skyline rails and ship load outs Construction of scaffold in yard, transported and rigged into position Erection of scaffold for shut down maintenance
Luke Boissevain [email protected] Page 3
Employer: Kimberley Industries PTY LTDPeriod of Employment: 2011 - 2012Position: RiggingIndustry: Mining / ConstructionDuties:
Rio Tinto Alcan Gove (place of work) Maintenance Rigging Liebherr cranes: 250t, 160t, 90t, 60t, 30t Franna: 25t, 18t
Employer: Site force AustraliaPeriod of Employment: 2009 - 2011Position: RiggingIndustry: Mining ConstructionDuties:
Mine construction and shutdown Underground Construction of crusher and overhead conveyer Pin jib erection and dismantle Duel Crane lifts Erection of steel
Employer: AlbemPeriod of Employment: 2008-2009Position: Rigging Industry: Civil Construction/bridge erection Duties:
General lifts. Equalized lifting of oversized prefabbed steel work Installing of bridge head stocks Installation of bridge beams. Duel lift for concrete pilling’s into pile driver Installation of concrete culverts and tilt panels.
Luke Boissevain [email protected] Page 4
Employer: Ausclad Group of Companies LimitedPeriod of Employment: 2006 - 2007Position: rigging, ScaffoldingIndustry: Mining (WA)Duties:
Shut down maintenance Hydraulic and pin jib work Pin jib erection and dismantle Duel Crane lifts up to 110 tonne Deconstruction of mine plant Erection and dismantle of steel Construction of scaffold in yard, transported and rigged into position Erection of scaffold for shut down maintenance
Employer: Site Force AustraliaPeriod of Employment: 2003 - 2005Position: Steel erection, riggingIndustry: MiningDuties:
Hydraulic and pin jib work Pin jib erection and dismantle Duel Crane lifts up to 110 tonne Deconstruction of mine plant Erection and dismantle of steel Installation of underground conveyer system Construction of scaffold in yard, transported and rigged into position Erection of scaffold for shut down maintenance
Employer: Century CranesPeriod of Employment: 2002Position: RiggingIndustry: General HireDuties:
Duties involving maintenance of cranes in workshop General lifts : roof trusses , rio , block pallets, cement kibbles Road works, electrical spools, barge container’s Dock works, recoveries (train bins , roll overs) Liebherr cranes: 250t, 160t,140t,100t, 90t, 60t, 30t Franna: 25t, 18t
Luke Boissevain [email protected] Page 5
REFEREES
Mo Brown 0429 427 144SupervisorLeighton Constructions
William Craig 0429 907 007Leading handLeighton Constructions
Agron Maxhuni 0400 826 454Crane SupervisorRio Tinto
Peter music 0498 734 927Rigging Supervisor,Walz Construction
Wilf Mason 0409 203 119Rigging SupervisorRio Tinto Alcan
Wayne Hardie 0449 720 845Crane Operator
Luke Boissevain [email protected] Page 6