Transcript
Page 1: LIST INFRASTRUCTURE CONSTRUCTION PROJECTS

20 LOS ANGELES BUSINESS JOURNAL NOVEMBER 15, 2021

Rank Project• name

• location

ConstructionCost(millions)

Description Profile• start date

• estimated

completion date

Planners• owner

• architect

General Contractor• name

• phone

1LAX People MoverBetween LAX and new off-site parking, car rentaland transit facilitiesLos Angeles 90045

$2,300.0 2.25-mile elevated guide way with sixstations connecting the terminals to aMetro rail station and consolidated rentalcar facility

March 20192023

Los Angeles World AirportsHDR Inc.

LINXS JV (Balfour Beatty, Fluor, ACSInfrastructure Development,Bombardier Transportation, DragadosUSA, Flatiron and Hochtief PPPSolutions)(949) 420-5000

2LAX - Delta Sky Way Project1 World WayLos Angeles 90045

1,900.0 upgrade and connect Terminals 2, 3, andthe Tom Bradley International Terminal

Sept. 1, 2018Sept. 30, 2023

Delta Air Lines Inc.Gensler/Arup

Hensel Phelps Construction Co.(949) 852-0111

3LAX - American Airlines Remodeling Project1 World WayLos Angeles 90045

1,600.0 renovation of all of Terminal 4 and part ofTerminal 5

Oct. 1, 20182023

American Airlines Inc.Gensler/Pierce GoodwinAlexander & Linville Inc.

Hensel Phelps Construction Co.(949) 852-0111

4Purple Line Extension Section 15055 S. Wilshire Blvd., Suite 700Los Angeles 90036

1,582.0 3.9-mile subway extension to Beverly Hills,from three new stations at Wilshire/LaBrea, Wilshire/Fairfax and Wilshire/LaCienega

January 2015June 2023

Los Angeles County MetropolitanTransportation AuthorityParson Transportation Group Inc.

Skanska/Traylor/Shea JV(323) 852-4220

5Purple Line Extension Section 2Wilshire/Rodeo to Century City/ConstellationLos Angeles

1,390.0 2.6 miles of additional tracks to Metro’srail system and two new stations atWilshire/Rodeo and Century City/Constellation

April 2017August 2025

Los Angeles County MetropolitanTransportation AuthoritySTV Inc.

Tutor Perini Corp./O&G Industries Inc.JV(818) 362-8391/(860) 489-9261

6Purple Line Extension Section 3 - StationsWestwood/UCLA and Westwood VA HospitalLos Angeles

1,320.0 construction of two new subway stationsat Westwood/UCLA and Westwood/VeteranAdministration (VA) Hospital

July 2019December2026

Los Angeles County MetropolitanTransportation AuthoritySTV Inc.

Tutor Perini Corp./O&G Industries Inc.JV(818) 362-8391/(860) 489-9261

7Crenshaw/LAX Transit CorridorCrenshaw Boulevard, Aviation Boulevard, FlorenceAvenueLos Angeles and Inglewood 90045

1,282.8 8.5-mile light rail line extending to LAXGreen Line from Exposition Boulevard witheight stations

January 20142022

Los Angeles County MetropolitanTransportation AuthorityHNTB Corp.

Walsh/Shea Corridor Constructors JV(213) 922-4609

8Regional Connector444 S. Flower St.Los Angeles 90071

1,205.4 1.9-mile underground light-rail systemconnecting the Gold Line to the 7th Street/Metro Station

July 2014January 2022

Los Angeles County MetropolitanTransportation AuthorityHatch Mott MacDonald

Skanska/Traylor JV(951) 684-5360

9LAX - Consolidated Rent-A-Car Facility5440 W. 98th St.Los Angeles 90045

1,100.6 consolidate operations of more than adozen rental car companies

August 2019June 2023

Los Angeles World AirportsPGAL/AC Martin Partners Inc.

PCL Construction Services Inc.(818) 246-3481

10Airport Metro Connector96th Street and Aviation Boulevard connect theCrenshaw-LAX light rail line to LAX terminalsLos Angeles 90045

898.6 connect the Metro system to the LosAngeles International Airport

June 21, 20212024

Los Angeles County MetropolitanTransportation AuthorityNA

Tutor Perini Corp.(818) 362-8391

11Foothill Gold Line ExtensionGlendora to MontclairGlendora

805.61 12.3-mile extension to the Metro Gold Linesystem for new light rail stations inGlendora, San Dimas, La Verne, Pomona,Claremont and Montclair

December20172027

Los Angeles County MetropolitanTransportation AuthorityNA

Kiewit/Parsons JV(626) 513-5788

12Division 20 Portal Widening & Turnback FacilityProjectArts DistrictLos Angeles 90012

440.0 civil improvements, including demolitionand/or modification of the existing tunnelportal, installation of new trackwork, athird rail, traction power and train controlsystems

April 2020July 2024

Los Angeles CountyMetropolitanTransportationAuthorityNA

Tutor Perini Corp.(818) 362-8391

13Purple Line Extension Section 3 - TunnelsCentury City to VA Hospital in WestwoodLos Angeles

430.0 construction of twin bored tunnels forfuture Purple Line subway servicespanning approximately 2.6 miles betweenCentury City and the VA Hospital inWestwood

January 20192023

Los Angeles County MetropolitanTransportation AuthoritySTV Inc.

Frontier-Kemper ConstructorsInc./Tutor Perini JV(818) 362-2062/(818) 362-8391

14Sixth Street Viaduct ReplacementDowntownLos Angeles 90013

360.0 replace existing viaduct between MateoStreet and SR-101

August 2013August 2022

City of Los AngelesHNTB/Michael MaltzanArchitecture

Skanska/Stacy and Witbeck Inc. JV(213) 485-5085/(510) 748-1870

15I-5 High Occupancy Vehicle LaneMagnolia Boulevard to Buena Vista St.Burbank

355.0 construction of high occupancy vehiclelane in each direction

August 2014Late 2021

California Department ofTransportationNA

Security Paving Co. Inc.(818) 362-9200

16LAX - Terminal Connections to People MoverBetween LAX and new off site parking, car rentaland transit facilitiesLos Angeles

337.0 expanding the facades of three terminalsand building new adjacent structures toease access of People Mover project

Early 20192021

Los Angeles World AirportsNA

Austin Commercial(310) 421-0269

1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners and generalcontractors. Projects must be under construction as of September 2021. To the best of our knowledge, this informationis accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions

and typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025. ©2021 LosAngeles Business Journal. This list may not be reprinted in whole or in part without prior written permission from theeditor. Reprints are available from Wright’s Media (877) 652-5295.

Researched by Joshua Niv

Ranked by construction cost

INFRASTRUCTURE CONSTRUCTION PROJECTS NEXT WEEKNonprofit Organizations, Talent Agencies, Motion Picture Distribution Companies

THE LIST

020-21_INFRA List.indd 20020-21_INFRA List.indd 20 11/11/21 2:21 PM11/11/21 2:21 PM

Page 2: LIST INFRASTRUCTURE CONSTRUCTION PROJECTS

NOVEMBER 15, 2021 LOS ANGELES BUSINESS JOURNAL 21

INFRASTRUCTURE CONSTRUCTION PROJECTS

Is your business internet slow?Is your business internet constantly down?

Is your business growing?

YOUR BUSINESS WILL GAIN FLEXIBILITY AND SCALABILITY WITH FIBER-OPTIC CONNECTIVITY

[email protected] 800 634 7999edisoncarriersolutions.com

WE HAVE THE RIGHT SOLUTIONFOR YOUR BUSINESS

Rank Project• name

• location

ConstructionCost(millions)

Description Profile• start date

• estimated

completion date

Planners• owner

• architect

General Contractor• name

• phone

17Los Angeles World Airports Roadway, Utilities &EnablingLos AngelesLos Angeles 90045

$334.9 restoring and constructing roadways andutilities infrastructure that will enableongoing and future work within LAWA’sLandside Access Modernization Program;LAWA’s LAMP is focusing on high-priorityprojects necessary to support theAutomated People Mover, ConsolidatedRent-A-Car facility and IntermodalTransportation Facility-West

December2020December2025

City of LA, Los Angeles WorldAirportsNA

Skanska(951) 684-5360

18Headworks WestI-5 to Griffith ParkBurbank

230.0 110-million gallon reservoir March 20162021

LADWPLADWP

NA

19Foothill Trunk LineFoothill BoulevardSunland/Tujunga

142.0 3-mile steel pipe sewer replacement alongFoothill Boulevard from Hubbard Street toTerra Bella Street

January 20162023

LADWPLADWP

NA

20Route 210 from Interstate 5 to Wheatland On-RampSylmarSylmar 91352

135.5 concrete pavement replacement, bridgebarrier and approach slab replacement,and various drainage system upgrades

July 2020July 2023

CaltransCaltrans

Flatiron(303) 485-4050

21River Supply Conduit Improvement Upper Reach– Unit 7 ProjectNANorth Hollywood 91505

130.0 replacing nearly 2.5 miles of welded steelpipe needed to supply drinking water toLos Angeles Department of Water andPower's service areas

October 20182022

City of Los Angeles / LADWPNA

Frontier-Kemper Constructors Inc.(818) 362-2062

22Silver Lake Phase 36001 Forest Lawn DriveLos Angeles 90068

75.0 Phase III will provide water delivery to L.A.via reservoirs that were constructed inPhase I & Phase II; Phase III's regulatingstation will control the water via a flowcontrol station and associated valve andmetering vaults

July 1, 2021Oct. 31, 2023

Los Angeles Department of Waterand PowerLos Angeles Department of Waterand Power

Webcor, Obayashi, WM Lyles a JointVentureNA

NA - Not Available JV - Joint VentureNote: Information provided by representatives of the owners and general contractors. Projects must be underconstruction as of September 2021.To the best of our knowledge, this information is accurate as of press time. While every effort is made to ensure the

accuracy and thoroughness of the list, omissions and typographical errors sometimes occur. Please send corrections oradditions on company letterhead to the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd.,Suite 350, Los Angeles 90025. ©2021 Los Angeles Business Journal. This list may not be reprinted in whole or in partwithout prior written permission from the editor. Reprints are available from Wright’s Media (877) 652-5295.

Researched by Joshua Niv

020-21_INFRA List.indd 21020-21_INFRA List.indd 21 11/11/21 2:21 PM11/11/21 2:21 PM


Top Related