Addition of CaO (Quicklime) into the soil
Used to improve the subgrade stiffness
Has been used since 1950s
Effective on clay soil
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
3/15
Quicklime will reacts with water (either fromthe clay water content of added separately) toform Ca(OH)2
The Ca(OH)2 will increase the PH, which willpromote the creation of calcium silicates andaluminates .
Ca(OH)2 will also reduce the water content ofthe soil through heat generation and chemicalreaction
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
4/15
CaO + H2O Ca(OH)2+ Heat
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
5/15
Ca(OH)2+ H4SiO4 CaH2SiO4 2 H2O
Hydrated Lime Calcium SillicateHydrate
Pozzolanic MaterialIn Soil
CaH2SiO4 2 H2O + Heat CaH2SiO4 + 2 H2O
Will react furtherwith CaO or evaporated
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
6/15
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
7/15
Aim: To determine the soil suitability with limestabilization, to determine the amount of limerequired and evaluating its capability for long-termweathering and loading.
4 Steps:
Soil Evaluation
Determine approximate lime demand
After treatment optimum water content and drydensity check
Do unconfined compression test.
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
8/15
Generally, soil with at least 25% passing a 75micron screen and having a PI of 10 or greaterare candidates for lime stabilization.
Soil with organics content above 1-2% byweight may not be compatible with thisstabilization method
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
9/15
Eades-Grim PH Test (ASTM D6276) is performed
Criteria: The lowest percentage of lime in soil that
produces a laboratory pH of 12.4 at section of thepH vs. lime percentage curve produced by thetest] is the minimum lime percentage forstabilizing the soil.
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
10/15
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
11/15
Make a mixture of soil, lime, and water at theminimum percentage of lime as determinedfrom Step 2 (Eades-Grim test), using a water
content of OMC + 2-3%. Determine the OMCand MDD of the mixture using ASTM D 698procedures
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
12/15
Prepare samples with water content 1% of theOMC.
Wrap the specimens in plastic wrap and seal in
an airtight, moisture proof bag. Cure the specimens for 7 days at 40C.
Subject the specimens to a 24 hour capillary
soak prior to testing. Do the UCT
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
13/15
Scarify Subgrade
Spread hydrated lime / lime slurry / quicklime
Add water (for Quicklime and hydrated lime)
Mix the soil and the lime to a specified depth
Compact!
Maintain (water addition & compaction)
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
14/15
-
8/11/2019 Lime for Subgrade Stabilization (Tugas TJR UI)
15/15
Soil Stabilization. (n.d.). Retrieved September27, 2014.
http://www.hiwaystabilizers.co.nz/divisions
/hiway-stabilizers/stabilised-subgrades(Retrieved September 27, 2014)
AUSTAB Technical Notes (May 2004)
"Mixture Design and Testing Procedures forLime Stabilized Soil." LIME Technical Brief 1(2006): LIME technical brief. Web. 27 Sept.2014.
http://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgradeshttp://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgradeshttp://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgradeshttp://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgradeshttp://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgradeshttp://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgradeshttp://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgradeshttp://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgradeshttp://www.hiwaystabilizers.co.nz/divisions/hiway-stabilizers/stabilised-subgrades