Los Angeles CountyMetropolitan Transportation Authority
Crenshaw/LAX Transit Corridor
Open House
July 19, 2011
Open House, Presentation on Screen 6:00 – 6:45 PM
Narration with Presentation on Screen 6:45 – 7:00 PMOpen House, Presentation on Screen 7:00 – 8:00 PM
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 2/23
Environmental Process
2
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 3/23
Project Milestones
Release Final EIS/EIR August 2011
Board Adopts Project and Certifies EIR September 22nd
File Notice of Determination End of September 2011
FTA Record of Decision &
Begin Project Implementation End of October 2011
Prepare for Design/
Build Procurements Now through mid 2012
3
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 4/23
Alternatives Screening Process
4
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 5/23
Base Project Definition
• Adopted Locally PreferredAlternative (LPA) – 8.5 mile Light Rail Transit Exposition
Blvd. to Metro Green Line
– 6 Stations:› Exposition/Crenshaw› Crenshaw/Martin Luther King Jr.› Crenshaw/Slauson› Florence/West
› Florence/La Brea› Aviation/Century
• Recommended Changes to
LPA: – La Brea Avenue Grade Separation – Exposition Blvd. to 39th St. (below-
grade) – Partially Covered LAX Trench
– Maintenance Facility near LAX
*
* Maintenance Facilit5
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 6/23
Exposition Connection
• At-grade connection to Exposition – challenging – Right-of-way (ROW) conflict with District
Square Development
– Significant at-grade ROW impacts – Unmitigable Traffic Impacts – Difficult Safety Issues
Below-grade configuration withBelow-grade Crenshaw/ExpositionStation is being examined in the Final
EIS/EIR and Preliminary Engineering• Cost remains an issue
6
DistrictSquare
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 7/23
Florence/La Brea Station
• Earthquake Fault in the vicinity of station zone precludes: – Stations immediately west or east of La Brea
– Aerial Stations
Station is recommended just east of Market Street alongFlorence Avenue
7
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 8/23
Partially Covered LAX Trench
8
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 9/23
Options
• Environmentally cleared,
NOT part of base projectdefinition
–Crenshaw/Vernon station* –Centinela Grade Separation
–Aviation/Manchester station
* To be included in construction biddocument as an option to be exercised if
base project and option can beconstructed within $1.715 billion
* Maintenance Facilit
*
9
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 10/23
Operating Plan
10
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 11/23
Vertical Profile of the Project Alignment
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 12/23
STATIONS
12
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 13/23
Crenshaw/Exposition Station
13
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 14/23
Crenshaw/King Station
14
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 15/23
Crenshaw/Slauson Station
15
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 16/23
Florence/West Station
16
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 17/23
Florence/La Brea Station
17
A i i /C S i
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 18/23
Aviation/Century Station
18
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 19/23
OPTIONAL STATIONS
19
C h /V O ti l St ti
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 20/23
Crenshaw/Vernon Optional Station
20
A i ti /M h t O ti l St ti
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 21/23
Aviation/Manchester Optional Station
21
Maintenance Facility: Arbor Vitae/Bellanca
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 22/23
Maintenance Facility: Arbor Vitae/Bellanca(City of Los Angeles)
22
Next Steps
8/6/2019 LAX Transit Project Update Open House - July 19, 2011
http://slidepdf.com/reader/full/lax-transit-project-update-open-house-july-19-2011 23/23
Next Steps
• Complete Final Environmental Impact Statement/ FinalEnvironmental Impact Report
• Board consideration – September 2011• Continue Preliminary Engineering/value engineering
• Board consideration Life-of-Project budget - Fall 2011
• Start Construction - 2012
23