Use of Incremental Launching

• Deck lengths of more than 200m

• 30-70m spans, typically regular 45m spans

• Constant depth at L/h~16

• Single-cell boxes best

• Steel moulds to cast ~25m per week

• Steel launching nose

• Pushed or pulled over low-friction surfaces

• Straight cables or RC for launching

• Profiled cables for continuity

• See CBDG Current Practice Sheet No. 13 for more details

Page 3: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Evolution - Incremental Launching

• Sungai Sitiawan Bridge

– 650m long bridge over Sungai Sitiawan

– classic 45m spans, internal prestress

• Broadmeadow Estuary Bridge

– 310m long bridge over estuary and bird sanctuary

– 69m spans, props, RC and external prestress

• Blackwater Viaduct

– 450m long bridge over River Blackwater

– 58m spans, props, RC and external prestress

• Kincardine Bridge

– 1,190m long bridge over Firth of Forth

– 45m spans, external prestress

Page 4: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Classic Launching - Sungai Sitiawan

• 45m spans

• Constant 2.9m depth

• No temporary props

• 30m long steel nose

• Straight, internal cables for launching

• Profiled, internal cables for continuity

• Fully prestressed and fully compressed

Page 5: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Sungai Sitiawan BridgeLaunching nose

Page 6: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Internal launching prestress

Page 7: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Sungai Tebok Raja

Samalon Bridge

Page 8: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

First Evolution of Launching - Broadmeadow

• 69m spans

• Constant 2.9m depth

• Temporary midspan props

• 25m long steel nose

• RC section only for launching - design to crack widths

• Profiled, external cables for continuity - 310m long

• Partially prestressed in service

Page 9: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Broadmeadow Estuary BridgeTemporary props and nose

Page 10: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

External continuity cables

and deviators

at third points

Page 11: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

External continuity cables

Page 12: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Broadmeadow Estuary Bridge

Page 13: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Broadmeadow Estuary Bridge

Page 14: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Second Evolution of Launching - Blackwater

• 58m spans

• Constant 2.9m depth

• Temporary midspan props

• 20m long steel nose

• RC section only for launching - design to crack widths

• Profiled, external cables for continuity

• 450m long, low-friction VBT cables

• Cables anchored only at the abutments

• Partially prestressed in service

Page 15: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Blackwater ViaductBlackwater ViaductTemporary props and nose

Page 16: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Temporary props and nose

Page 17: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

External continuitycables

and deviatorsat third points

Page 18: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

External continuitycables

Page 19: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Blackwater Viaduct

Page 20: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Third Evolution of Launching - Kincardine

• 45m spans typically

• Constant 2.8m depth over 1,190m

• No temporary props on marine 45m spans

• 35m long steel nose

• Straight, external cables for launching - 2 spans long

• Profiled, external cables for continuity - 3 spans long

• Partially prestressed and designed to 0.15-0.25mm crack widths

• Fully compressed under permanent loads

• Loads shared between prestress and rebar

Page 21: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Kincardine BridgeLaunching nose and single marine piers

Page 22: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Launching nose attachment

Page 23: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

125m long casting area

with two skidding beams

on vertical CFA piles

Page 24: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

1,200t pushing jacks

32,500t deck

Page 25: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Pier top and

soffit integration

to suit launching

Page 26: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

GRAVEL

L A U N C H I N G

PILE / PIER MOMENTS

LAUNCH

2520151050

1.2MN

MLWL

MHWL

SOFT CLAY

GLACIALGRAVELLY CLAY

SANDSTONE

MUDSTONE

SANDSTONE

Single 3m diameter

bored piles

in rock sockets

Page 27: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Permanent steel casings

1% rebar in pile cage

sized under

launching

Page 28: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

225mm slabs and 400mm webs

with Grade 60 concrete

Page 29: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

3.5m long diaphragm unit with launching and continuity cables

Page 30: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

C O N T I N U I T Y C A B L E

Continuity cables

and deviators

at third points

Page 31: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Kincardine Bridge

Page 32: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Fourth Evolution of Launching - Modular Bridges

• 15-50m spans

• Constant depths of 1-3m

• 2.5m long precast shells match-cast off site

• Assembled and infilled with concrete on site

• Straight, internal cables for launching

• Temporary props possible

• Steel nose

• Profiled, internal cables for continuity

• Fully prestressed

Page 33: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Objectives

• Serious competitor to steel-composite and precast beam schemes

• More elegant and efficient than steel-composite or precast beams

• Covers all standard highway locations

• Covers variable depths, spans and widths

• Launching technology to avoid working at height over the road

Page 34: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Evolution - Precast Shells

• Taney Road Bridge

– 110m main span cable-stayed bridge

– Alternative precast shell solution

– Quicker erection over road junction

– Easier stressing operations

• River Shannon Bridge

– 150m long 5-span bridge

– Alternative precast shell solution

– Quicker and easier construction

Page 35: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Taney Road BridgePrecast shells

Page 36: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Taney Road Bridge

Page 37: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

River Shannon BridgePrecast shells

Page 38: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

River Shannon Bridge

Page 39: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Key Features

• Speed of construction is the key to value

• Match-cast off site for safety, quality and speed

• Elimination of box forms – easier moulds

• Shell structure to provide the soffit form

• Internal prestressing in infill with continuous ducts to TR47

• Pre-assembly behind abutment for safety and quality

• Launched in to place for safety, ease and less traffic disruption

• Props may be used to reduce prestress

• Robust, simple, clean lines for low maintenance

Page 40: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

CL

PRECAST EDGE UNIT

BARS - 2No 32 DIA.

TEMPORARYPRESTRESSING

PRECAST CONCRETE SHELL

INSITU INFILL CONCRETE

2 No 19/15mmLAUNCH CABLES

6 No 19/15mmPROFILE CABLES

Typical Midspan Section

Page 41: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Typical Construction Sequence

TEMPORARY STRESSFORM JOINTSPACK UNITS AND ALIGNLAUNCH OVER PROPS

ATTACH NOSESTRESS LAUNCH CABLESPOUR INFILL CONCRETE

TEMPORARY STRESSFORM JOINTSPACK UNITS AND ALIGN

3

2

1

TEMPORARY PIERS& FOUNDATIONS & FOUNDATIONS

TEMPORARY PIERS

Page 42: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Typical Construction Sequence

REMOVE PROPSSTRESS PROFILED CABLESCAST MONOLITHIC PIER TOPSREMOVE NOSE

COMPLETE LAUNCH

STRESS LAUNCH CABLESCOUPLE LAUNCH CABLESPOUR INFILL CONCRETE

6

5

4& FOUNDATIONSTEMPORARY PIERS TEMPORARY PIERS

& FOUNDATIONS

& FOUNDATIONSTEMPORARY PIERSTEMPORARY PIERS

& FOUNDATIONS

Page 43: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Typical Three-Span Bridge

Page 44: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Options for Varying Spans

-150

015

00 -

2000

INFILLIN-SITU

UNITSPRECAST

LC

MAXIMUM SECTION: SPANS 35-50m

MINIMUM SECTION: SPANS 15-25m

TYPICAL SECTION: SPANS 25-35m

LC

IN-SITUSTITCH

SPAN CABLESPROFILED

PIER CABLESPROFILED

CABLESLAUNCH

2000

- 27

5010

00

Page 45: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Options for Varying Widths

600020006000

400010004000

500015005000

TYPICAL DECK WIDTH: 11.5m

NARROW DECK: 9m

WIDE DECK: 14m

CL

LC

LC

NO

. OF

BE

AM

S

OVERALL DECK WIDTH (m)

3824

19 30

2214

9 14

64

40302010

5

4

3

2

1

Page 46: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Typical precast shell unit

Page 47: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Typical three-span bridge

Page 48: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Typical soffit

appearance

Page 49: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Typical soffit

appearance

Page 50: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,
Page 51: Launching Bridges in to the Future CBDG Annual · PDF fileEvolution - Incremental Launching • Sungai Sitiawan Bridge – 650m long bridge over Sungai Sitiawan – classic 45m spans,

Launching Bridges in to the Future

• High-quality concrete

• Factory-controlled conditions

• Safer and faster construction

• Minimises traffic disruption

• Integration of design and construction is key

• Low maintenance structures

• New innovations always developing

• See CBDG Current Practice Sheet 13 for more details

• See CBDG Technical Guide 12, “Guide to Modular Bridge Construction” - due out soon