Download - Lampiran 1 : Struktur Organisasi PT. X
36
Lampiran 1 : Struktur Organisasi PT. X
37
Lampiran 2 : Record data SMED 1 (spaghetti diagram)
38
Lampiran 3 : Identifikasi Elemen SMED 2
External /Hand tools
used
Inspection
gaugesProblems /
Start Stop Internaland
sequenceand sequence Improvements
1 lepas clamp mold 8.5 8.57 2 Internal
2 ambil majun, kuras hopper, sak 8.57 8.58 1 Internal
3kuras hopper, ambil compond , MRTU ambil
dari B108.58 9.06 8 Internal
4 loading mold to machine 9.06 9.08 2 Internal
5 check mechanisme open close mold 9.08 9.32 24 Internal
6 pasang nepel mold/cooling 9.32 9.35 3 Internal
7 cek stoper / safety mold 9.35 9.45 10 Internal
8 setting clamping 9.45 9.46 1 Internal
9 menggambil setting clamping 9.46 9.5 4 Internal
10 pasang cooling 9.5 9.54 4 Internal
11 membersihkan selang yang tidak dipakai 9.54 9.57 3 Internal
12 setting robot 9.57 10.05 8 Internal
13 setting proses parameter 10.05 10.16 11 Internal
14 cek produk ke QC 10.16 10.27 11 Internal
15
Date 92MC
ITEM OBSERVER TEKNISI ( )
Internal Time
External Time
Note :
Total
Time
SETUP REDUCTION OBSERVATION FORM
Steps DescriptionElapsed Time
Total time
39
External /Hand tools
used
Inspection
gaugesProblems /
Start Stop Internaland
sequenceand sequence Improvements
1 Menggambil cran 0 3.24 3.24 Internal
2 mengambil eye bolt 3.24 5.54 2.3 Internal
3 melepas mold lama 5.54 7.43 1.89 Internal
4 menggembalikam mold lama ke MTP 7.43 14.47 7.04 Internal
5 mengambil mold baru diMTP ke B14 14.47 21.29 6.82 Internal
6 memasang mold 21.29 23.59 2.3 Internal
7 setting clamp posisition 23.59 24.29 0.7 Internal
8 setting clamping 24.29 42.47 18.18 Internal
9 menggambil setting parameter 42.47 44.4 1.93 Internal
10 setting clamping 44.4 48.21 3.81 Internal
11 pasang cooling 48.21 65.5 17.29 Internal
12 membersihkan selang yang tidak terpakai 65.5 69.55 4.05 Internal
13 setting robot 69.55 79.56 10.01 Internal
14 setting product dan ambil comtre 79.56 90.2 10.64 Internal
15 pengajuan produksi 90.2 92.2 2
Date 92MC
ITEM OBSERVER TEKNISI ( )
Internal Time
External Time
Note :
Total
TimeSteps Description
Elapsed Time
Total time
40
Lampiran 4 : Aktivitas Internal ke Eksternal (Penyamaan aktivitas SMED 2
dengan aktivitas SMED 1)
Internal Eksternal
1 START 0.38 Internal
2 MELEPAS CLAIM / MOLD 1.89 Internal
3MENGGEMBALIKAN KE
MTP
4MENGGAMBIL MOLD
BARU DARI MTP
5MENGGEMBALIKAN
CRANE
6SET UP / PASANG
EJECTOR2.3 Internal
7 MEMASANG CLAMP MOLD 22.69 Internal
8 PASANG COOLING 17.29 Internal
9 TAP MATERIAL LAMA Internal
10 CLEANNING HOPPER Internal
11 CLEANNING BARREL Internal
12 MELEPAS ROBOT LAMA 0 Internal
13MENGGAMBIL PLATE
ROBOT BARU0 Internal
14 PASANG PLATE ROBOT 0 Internal
15 SETTING ROBOT 10.01 Internal
16 PENGAJUAN PRODUKSI 2 Internal
Total 84.96 28.4
No. Aktivitas
Waktu
Internal
(menit)
Category Waktu
Eksternal
(menit)
TIME SMED
ACTUAL (I)
TIME SMED
ACTUAL (I
I)
19.4
9
Eksternal
Eksternal
PRODUCT :
MACHINE : Number of NVA operations
1 3 lepas clamp mold bagian depan Internal
2 3 lepas clamp mold bagian belakang Internal
3 1 lepas cooling mold Eksternal
4 6 ambil troli alat set Eksternal
5 3 ambil lap majun Eksternal
6 30 ambil karung untuk cleanning hopper Eksternal
7 4 cleaning hopper Eksternal
8 3 turunkan material dr mesin Eksternal
9 10 ambil kantong plastik Eksternal
10 16 ambil material Eksternal
11 3 isi material untuk dioven Eksternal
12 3 setup/pasang clamp mold Internal
13 3 set clamp proses Internal
14 3 pasang clamp mold Internal
15 6 ambil kelengkapan baut untuk clamp Eksternal
16 6 ambil ganjel, baut untuk clamp Eksternal
17 6 ambil lap majun Eksternal
TOTAL METER 109
91
Activities
Internal/
Eksternal
TOTAL jarak eksternal
Number of V A operations
Spaghetti diagram
:
PANJUL
Distance travelled ( mm)
Changes of ownershipKEGIATAN
METER
41
PRODUCT :
MACHINE : Number of NVA operations
1 20 ambil eyes bolt ke MTP Ekternal
2 20 kembali ke B14, ambil crane Ekternal
3 20 ambil eyes bolt ke MTP lagi karena tidak sesuai ukuran Ekternal
4 20 kembaali ke B14 Internal
5 20 kembalikan mold lama ke MTP Ekternal
6 20 ambil moold baru Ekternal
7 1 pasang clamp mold Internal
8 1 ambil kunci L Ekternal
9 1 membantu rekan kerja memegang kunci Internal
10 1 kembali pasang clamp Internal
11 1 ambil kunci tool yang dibutuhkan Ekternal
12 1 kembali Internal
13 5 ambil parameter Ekternal
14 5 kembali pasang cooling Ekternal
15 1 setting robot Ekternal
16 10 ambil form pengajuan Internal
17 10 kembali ke B14 Internal
18 5 buat start produksi Internal
TOTAL METER 162
113
Activities
Internal/
Eksternal
TOTAL jarak eksternal
Number of V A operations
Spaghetti diagram
:
PANJUL
Distance travelled ( mm)
Changes of ownershipKEGIATAN
METER
Internal Eksternal
1 START 0.38 Internal
2 MELEPAS COOLING
3 MELEPAS CLAMP MOLD
4 MENCARI EJECTOR
5 PASANG CLAMP MOLD
6MEMASANG COOLING
MOLD7 Internal
7MENGGAMBIL SPEC DAN
DRAWING
8 MENSETTING PARAMETER
9MEMBERSIHKAN M/C +
ALAT KERJA3 Internal
10 MENGGAMBIL CONVEYOR 0 Internal
11 MENYIAPKAN SUBO Internal
12 MENPURGING MATERIAL Internal
13MENSETTING
MENJADIKAN PRODUKInternal
14 MENSETTING ROBOT 8 Internal
15 CEK PRODUK KE QC 11 Internal
Total 87.91 58.53
No. Aktivitas
Waktu
Internal
(menit)
Category Waktu
Eksternal
(menit)
TIME SMED
ACTUAL (I)
TIME SMED
ACTUAL (I
I)
2
41
4.53
11
Eksternal
Eksternal
Eksternal
Eksternal
42
Lampiran 5 : Real data Aktivitas SMED 2
External /Hand tools
used
Inspection
gaugesProblems /
Start Stop Internaland
sequenceand sequence Improvements
1 Menggambil cran 0 3.24 3.24 Eksternal
2 mengambil eye bolt 3.24 5.54 2.3 Eksternal
3 melepas mold lama 5.54 7.43 1.89 Internal
4 menggembalikam mold lama ke MTP 7.43 14.47 7.04 Eksternal
5 mengambil mold baru diMTP ke B14 14.47 21.29 6.82 Eksternal
6 memasang mold 21.29 23.59 2.3 Internal
7 setting clamp posisition 23.59 24.29 0.7 Eksternal
8 setting clamping 24.29 42.47 18.18 Eksternal
9 menggambil setting parameter 42.47 44.4 1.93 Internal
10 setting clamping 44.4 48.21 3.81 Internal
11 pasang cooling 48.21 65.5 17.29 Internal
12 membersihkan selang yang tidak terpakai 65.5 69.55 4.05 Internal
13 setting robot 69.55 79.56 10.01 Internal
14 setting product dan ambil comtre 79.56 90.2 10.64 Internal
15 pengajuan produksi 90.2 92.2 2
Date 92MC 51.92
ITEM 38.28 OBSERVER TEKNISI ( )
Total timeNote :
Internal Time
External Time
SETUP REDUCTION OBSERVATION FORM
Steps Description
Elapsed TimeTotal
Time
External /Hand tools
used
Inspection
gaugesProblems /
Start Stop Internaland
sequenceand sequence Improvements
1 lepas clamp mold 8.5 8.57 2 Internal
2 ambil majun, kuras hopper, sak 8.57 8.58 1 Eksternal
3kuras hopper, ambil compond , MRTU ambil
dari B108.58 9.06 8 Eksternal
4 loading mold to machine 9.06 9.08 2 Internal
5 check mechanisme open close mold 9.08 9.32 24 Internal
6 pasang nepel mold/cooling 9.32 9.35 3 Internal
7 cek stoper / safety mold 9.35 9.45 10 Internal
8 setting clamping 9.45 9.46 1 Internal
9 menggambil setting clamping 9.46 9.5 4 Internal
10 pasang cooling 9.5 9.54 4 Internal
11 membersihkan selang yang tidak dipakai 9.54 9.57 3 Internal
12 setting robot 9.57 10.05 8 Internal
13 setting proses parameter 10.05 10.16 11 Internal
14 cek produk ke QC 10.16 10.27 11 Internal
Date 92 9MC 83
ITEM 9 OBSERVER TEKNISI ( )
Total timeNote :
Internal Time
External Time
SETUP REDUCTION OBSERVATION FORM
Steps Description
Elapsed TimeTotal
Time
43
Lampiran 6 : 5s Tooling
44
Lampiran 7 : SGA
45
Lampiran 8 : Flowchart Perawatan dan Perbaikan Mould dan tooling
STANDARD OPERATION PROCEDURE
PROCESS : TITLE : Doc. No. : RI-SOP-S.4.4-2008
S.4 S.4.4 Issued Date: 1-Apr-2010
PENDUKUNG PERAWATAN DAN PERBAIKAN Rev. No. : 07
TEKNIS MOULD & TOOLING Page : 3/7
Tanggung Jawab
& Wewenang
1. Teknisi MTP, Teknisi 1.
2.
2. Teknisi MTP
2.1 Teknisi MTP
3. Teknisi MTP, Foreman
Mould Shop SH
4. Assembler/Foreman
Mould Shop SH
4.1 Mould Shop SH
5. Teknisi MTP
6. Mould Shop SH
7. Teknisi Mould Shop
8. Foreman, Mould Shop SH
8.1 Foreman, Mould Shop SH
PT. REXAM PACKAGING INDONESIA
FLOW CHART
Menerima Mould & Tooling
Menganalisa / menentukan langkah - langkah perbaikan
Melakukan Perbaikan
Melakukan Inspeksi Perbaikan
C.3.2 Pelaksanaan Produksi
Laporan Mould & Tooling Produksi
S.2.1
Memeriksa Mould & Tooling
2.1
Tidak
Ya3
4.16
7
8
8.1
Tidak
Menyerahkan Mould & Tooling ke Mould Shop
4
A
Apakah perbaikan sudah Ok ?
Apakah perbaikan bisa dikerjakan Intern
?
Apakah perlu perbaikan ?
Melakukan Cleaning Mould & Tooling
5
B
C.2.1Perencanaan dan Pengendalian Produksi
Weekly Mould Shop Schedule
PPBJ, Barang, Surat Jalan
Pengadaan Barang dan Jasa
Membuat PPBJTidak
Ya
Ya
46
STANDARD OPERATION PROCEDURE
PROCESS : TITLE : Doc. No. : RI-SOP-S.4.4-2008
S.4 S.4.4 Issued Date: 1-Apr-2010
PENDUKUNG PERAWATAN DAN PERBAIKAN Rev. No. : 07
TEKNIS MOULD & TOOLING Page : 4/7
Tanggung Jawab
& Wewenang
9. Foreman/ Assembler 9
Teknisi MTP
9.1 Teknisi MTP 9.1 10
10. Teknisi MTP, Teknisi
11. Teknisi MTP 11
12. Administrasi MTP 12
BM dan IM Section Head
PT. REXAM PACKAGING INDONESIA
FLOW CHART
Menyerahkan Mould & Tooling ke Teknisi MTP
Menyerahkan Mould & Tooling
Menyimpan Mould & Tooling dan membuat Status Mould
Menginformasikan Life shot Mould & Tooling
Apakah masih kondisi produksi ?
B A
Pelaksanaan Produksi
Barang (Mould & Tooling)
C.3.2
Ya
Tidak
47
Lampiran 9: Hasil Training guna meningkatkan Performa Setup
No NOMOR NIK NAMA PRE TESTPOST TEST (I)
( OCT'16)
POST TEST ( II)
( NOV'16)
IND
ICA
TO
R
STATUS LEVEL KETERANGAN DEVELOPMENT
PLANNING DUE DATE
1 11.11.0029 Ristiaji 610 780 850 INTERMEDIATE Passed Intermediate , Penguatan aktivitas Improvement
2 11.11.0029 Adhi 580 800 833 INTERMEDIATE Passed Intermediate , Penguatan aktivitas Improvement
3 11.11.0029 Budiono 490 725 813 INTERMEDIATE Passed Intermediate , Penguatan aktivitas Improvement
4 11.11.0029 Andre 490 680 773 INTERMEDIATE Passed Intermediate , Penguatan aktivitas Improvement
5 11.11.0029 SuJarwo 380 780 850 INTERMEDIATE Passed Intermediate , Penguatan aktivitas Improvement
6 11.11.0029 Yudi Broto 475 655 838 INTERMEDIATE Passed Intermediate , Penguatan aktivitas Improvement
7 11.11. Farid Hakim 550 750MUTASI BARU
NPD to IMM Passed Intermediate , Penguatan aktivitas Improvement
8 11.12.2031 Pandi 120 630 950 BASIC IMM Passed Basic level , Penguatan pada Praktek Lapangan
9 11.12.0321 Zainul Fawahid 270 800 1000 BASIC IMM Passed Basic level , Penguatan pada Praktek Lapangan
10 11.12.0319 Ageng Aldi 250 750 886 BASIC IMM Passed Basic level , Penguatan pada Praktek Lapangan
11 11.11.00 Irwan 450 700 705 BASIC MTP - IMM Passed Basic level , Penguatan pada Praktek Lapangan
12 11.11.00 Yosafat 650 800 909 BASIC MTP - IMM Passed Basic level , Penguatan pada Praktek Lapangan
13 11.12.0033 Sarjono 140 410 636 INTERMEDIATE Progress develop Lambat (POINT < 700 )
14 11.12.0045 Samsul 50 150 682 INTERMEDIATE Progress develop Lambat (POINT < 700 )
15 11.12.0099 Darsono 360 580 886 INTERMEDIATE Passed Intermediate , Penguatan pada Praktek Lapangan
16 11.12.0100 Suhirman 100 320 705 INTERMEDIATE Passed Intermediate , Penguatan pada Praktek Lapangan
17 11.12.0110 M. Nurwahid 230 600 909 INTERMEDIATE Passed Intermediate , Penguatan pada Praktek Lapangan
18 11.12. Purnomo 300 450 636 INTERMEDIATE Progress develop Lambat (POINT < 700 )
19 11.12.0122 Sufyan Mustofa 375 460 864 INTERMEDIATE Passed Intermediate , Penguatan pada Praktek Lapangan
20 11.12 Rubianto 480 580 841MUTASI BARU
MTN to MTP - IMM Passed Intermediate , Penguatan pada Praktek Lapangan
21 11.11.00 Chandra 380 550 682 BASIC MTP - IMM Progress develop Lambat (POINT < 700 ) MUTASI DEC'2016
Develop to
Expert Level
APLIKASI SMED
2017
2017
APLIKASI SMED 2017
Internal
development 2016 -2017