LATIHAN 1 PENENTUAN STUDY NODE
Ismets 1
![Page 2: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/2.jpg)
CASE STUDY NODE:
OIL AND GAS PROCESS
GAS TREATMENT & COMPRESSION
2
![Page 3: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/3.jpg)
TEMPLATE DISEDIAKAN UNTUK MEMBANTU PERENCANAAN
STUDY NODES:
Ismets
4
![Page 4: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/4.jpg)
ISMETS
Section Nomor Drawing No Node Uraian Node Hari ke
TABEL PERENCANAAN STUDY NODES:
![Page 5: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/5.jpg)
Ismets
LATIHAN HAZOPS PLANT MODIFICATION
13
![Page 6: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/6.jpg)
Ismets
Untuk suatu tujuan tertentu disampaikan usulan modifikasi berupa pemasangan
block valve di antara Cooler dengan LP separator.
Rancangan sebelumnya (Original Design) ditunjukkan pada gambar 7, dan usulan
Modifikasi (Modified Design) berupa pemasangan block valve ditunjukkan pada
gambar 8.
Kondisi operasi rangkaian Cold box tersebut adalah :
HP Separator beroperasi pada tekanan 500 psig.
LP Separator beroperasi pada tekanan <50 psig.
Design pressure Cooler Shell adalah 50 psig.
Fluida yang ditangani (Reaction product, berupa campuran cairan dan gas
hidrokarbon yang flammable).
Uraian Kegiatan Modifikasi.
14
![Page 7: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/7.jpg)
Ismets
Original Design
Gambar
15
Relief Valve
LCV
![Page 8: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/8.jpg)
Ismets
Modified Design
16
Relief Valve
LCV
![Page 9: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/9.jpg)
Ismets
Guide
Word Deviation Causes Consequences Safeguards
Risk Rank
L/M/H Recommendations
Action
by
HAZOPS WORKSHEET
Company : Facility : Session : Node : Parameter :
Drawing No. : Intention :
Untuk Identifikasi Bahaya
17
![Page 10: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/10.jpg)
ISMETS
HAZOPS INSTALASI PERTANKIAN BBM
26
![Page 11: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/11.jpg)
TUGAS GRUP
ISMETS
Tunjuk Ketua dan sekretaris
Buat pembagian Node dan isikan kedalam tabel Perencanaan Study Node.
Lakukan Study Hazops
Presentasikan
1. Mulai dengan perkenalan.
2. Minta Process Engineer
menyampaikan uraian proses.
3. Membagi P&ID menjadi seksi/Node
4. Menuangkan dalam formulir dan
perkiraan jumlah hari yang
dibutuhkan.
5. Memulai Hazops dengan Parameter
dan menggunakan formulir Hazops.
6. Hazops leader bertugas:
Memimpin dan mengendalikan
tim
Berkoordinasi dengan sekretaris
untuk pengisian form terkait hasil
diskusi setelah dapat
kesepakatan dari anggota tim
secara bertahap
Menjaga target waktu tercapai.
7. Meresume seluruh rekomendasi yang
dihasilkan dengan ranking bahaya.
8. Membuat Laporan Hazops 27
![Page 12: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/12.jpg)
28
INSTALASI TANKI BBM
![Page 13: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/13.jpg)
8” Line
2” Line 6” Line
6” Line Bottom
Loading
Arm
To Closed
drain
Meter
Prover
PD
Ismets
INSTALASI TANKI BBM ...2
![Page 14: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/14.jpg)
ISMETS
Section Nomor Drawing No Node Uraian Node Hari ke
TABEL PERENCANAAN STUDY NODES:
![Page 15: Kumpulan File Latihan Hazops-UMUM](https://reader037.vdocuments.site/reader037/viewer/2022103102/5695d1b81a28ab9b0297abae/html5/thumbnails/15.jpg)
Guide
Word
Deviation
Causes Consequences Safeguards S L R Recommendations
Action by
HAZOPS WORKSHEET
Company :
Facility :
Session :
Node :
Parameter : Drawing No. :
Intention :
S = Severity, L = Likelihood, R = Risk