Kodiak Deepwater Project

Challenges and Solutions

Deep Gulf Energy II, LLC

Marine Technology Society

September 24, 2015

Page 2: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

DGE Strategy Highlights

Overview of Deep Gulf Energy Companies

• Exploration and Production Company focused

solely in the DW GOM

• Private company backed by the First Reserve

Corporation

• Proven Management Team

• Over 20 years of experience executing

projects in the DW GOM

• Founders of Mariner Energy (1996)

• Three ventures with First Reserve

(2005-present)

• Excellent safety record since inception

• Based in Houston, Texas

• Employees and consultants: 84

• Have invested over $1.5 billion in the DW

GOM since inception of Deep Gulf

Deep Gulf Energy Background

• Specialize in subsea developments tied back to

existing host platforms

• Develop projects that are not material to or are out of

the focus area of the major oil companies

• Focus on exploitation and low risk exploration

prospects

• Concentrate in oil prone areas of the DW GOM near

existing Infrastructure

• Operate to control quality and timing

• Low cost operator

• Get projects on stream quickly (less than 2 years

from discovery to first production)

• Invest in a portfolio of opportunities

• Partner to diversify risk

2

Page 3: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

9/24/2015 3

DGE Companies Experience

3

Page 4: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

• Leading private equity firm specializing in the energy

sector globally

• Formed in 1983 / 30 years of experience

• Offices in Houston, London and Greenwich

• Have invested over $20 billion in equity transactions

since inception

• Funded Equity to DGE Companies of $646MM

First Reserve Corporation

4

Page 5: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Current Developments

Overview of Deep Gulf Energy Companies

• Bought 2 fields and have had 5 exploration discoveries

since 2012

• Net Production

• Current: 6,000 BOEPD

• 2018 Prod: 19,842 BOEPD

• 3-4 exploration prospects over the next 12 months

Recent Activity

• Big Bend: 10% WI • Marmalard: 12 % WI • SOB II: 12% WI • Odd Job: 59% WI • South Santa Cruz: 40% WI • Barataria: 23% WI • Kodiak: 29% WI

5

Page 6: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Kodiak Development

O Discovery by BP Americas 2008

‐ Mississippi Canyon 771/727

‐ Well water depth 4,833-ft

O Acquired by Deep Gulf Energy II in 2012

Page 7: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Devils Tower Spar

MC 773

5,610 fsw

Tapered Stress Joint Hang-

off, SCR with Strakes

35,500’ x 5.00” ID 625 CRA Insulated

Flowline

Elect/Hyd MUX

Control Umbilical

MC 771 #2

UTA

MC 727 #3

FLET

Elect/Optical & Hyd Flying

Leads

MC 727, 4,833 fsw

Insulated Flowline

Jumpers

SITP >14,000 psi

Temperature >275°F

1% CO2

Asphaltene potential

Wax deposition potential

Page 8: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Major Challenges

O Drilling and completion of a HPHT 30,000’ well

O Installed 9 X 200 kip buoyancy cans to increase

variable deck load for topsides and riser/umbilical

O Installed 3 pull tubes in the hard tank slot through

the soft tank to accommodate riser and umbilicals

O First use of reeled CRA lined riser/flowline in

GOM

O Subsea controls, chemical injection, and

processing equipment module installation

Page 9: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Additional Buoyancy

O Tieback adds additional payload to

topsides and riser/umbilical loads on hull

O Addition of 9 buoys to mooring lines at mid

water link plate

O Platform motions recomputed

Page 10: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Additional Buoyancy

Page 11: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Mooring System with Buoys

Page 13: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

13

Riser and Umbilical Pull Tubes

Page 14: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015
Page 15: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Riser and Flowline

Page 16: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Corrosion/Erosion Assessment

O HPHT and CO2

O Erosion rates high for single flowline tieback

O Corrosion Resistant Alloy UNS00625 material

selected as best option

- Selection based on mechanical properties at pressure

and temperature, fabrication processes, weldability and

installation track record

O Flowline system from the tree to production

separator is CRA clad

Page 17: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Design Considerations

O Design concerns are thermal cycling and potential

lateral buckling

O Fatigue sensitive region at interface of liner and

overlay

O Use of sleepers to increase pipeline compliance

O Wet insulation on Steel Catenary Riser helps with

top tensions compared to Pipe in Pipe

Page 18: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Clad Pipe

Page 19: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Mechanically Lined Clad Pipe

O X65 base pipe lined with CRA (Alloy 625)

‐ Mechanically lined pipe for flowline with overlay in ends

‐ MLP and overlay for riser and FLET piping

Page 20: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Expansion Process

Page 21: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Flowline Fabrication - CRA Welding

O CRA consumable consistent with alloy 625 liner

(e.g. grade 625/686 material)

O Need to overmatch pipe properties for

installation (reeling) and operation (high

temperature)

O Control of carbon steel yield strength at mill

(65.3-ksi min to 79.8-ksi max)

Page 22: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Flowline Fabrication - CRA Welding

O Automatic welding for consistency and process

control

O Pipe geometry challenges welding

‐ Relatively small diameter of pipe (5-in ID)

‐ Wall thickness range 1.0-in to 1.25-in

Page 23: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015
Page 24: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

CRA Pipe Installation

O CRA clad pipe has history of use in subsea

systems world wide

‐ Overlay of pipe

‐ Clad and longitudinally seam welded

‐ Mechanically lined

O Main installation methods have been J-Lay and

S-Lay

Page 25: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Reeling of CRA Clad Lined Pipe

O Reel lay most cost effective

O Installation contractors have developed reeling

processes for mechanically lined pipe through

JIP’s and use of DNV RP-A203 qualification

process

O Installation contractor’s first project for reeled CRA

pipe (mechanically lined) was completed in Brazil

(2013)

Page 26: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Spooling

Page 27: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Technip Deep Blue

Page 28: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Devils Tower Module

Installation

Page 29: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Olympus Loop Currents

29

Page 30: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Topsides Module Installation Devils’ Tower

Clearing/Break

Page 31: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015
Page 32: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015
Page 33: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Status September 2015

O Well was successfully drilled and completed

O Flowline and riser pipe are at Technip spool

base welding stalks

O Umbilical loaded on Deep Blue ready for

installation

O Production and MCC modules installed and

construction ongoing

O First oil Q4 2015

Page 34: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Questions

Page 35: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Acknowledgements

Page 36: Kodiak Deepwater Project Challenges and Solutions · Kodiak Deepwater Project Challenges and Solutions Deep Gulf Energy II, LLC Marine Technology Society September 24, 2015

Contact Information

Danny Hough

Vice President of Developments

Deep Gulf Energy