Page 1: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan

Kickapoo Creek Corridor Restoration Project

“One Project…. …many goals (and how 319 helped fund it)”

Kaskaskia Engineering Group

Mary Lou GoodpasterBryan Cross

Page 2: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan

Rule #1All large and complex 319 grants that are successful can only be successful because of the project TEAM.

Rule #1.5Writing the grant is the easy part, implementing the grant is the hard part.

Page 3: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan

What’s the Plan?

Turn 2 miles of agricultural

drainage and the surrounding fields

into…

…2 miles of high quality stream with 80 acres of prairie buffer tucked within a residential and community development which will serve as the starting point of a future growth cell on the east side of Bloomington.

Page 4: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan

How does this fit in with a 319 grant?

Create a keystone development to support future growth on the east side of Bloomington,

Convert an agricultural drainageway to a high quality stream,

Establish large-scale temporary detention of stormwater,

Create an 80 acre community park that provides high quality grassland habitat and contains several miles of bike paths with sitting areas,

Integrate urban development with naturally functioning ecosystems and use it to provide educational opportunities,

Improve the water quality of Kickapoo Creek.

We have lots of objectives:

Page 5: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan

How does this fit in with a 319 grant?

We have lots of objectives:

Remember your ta

rget

audience!!

Page 6: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan

Back to RULE #1

It takes a team effort

Before you prepare an application:

Preliminary design completed,

All required permits issued or at least in the pipeline,

Coordinate with IEPA before you prepare the application.

Page 7: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan

Jump to RULE #1.5

Once you have the grant and you start the project you get to the real work, and chances are you are going to get in it deep!

The work after the grant always far exceeds the work beforehand

Page 8: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan

Biologists, Engineers, and Contractors DO NOT always understand each other!!!!

Implementation

It is extremely important that there is representation

before, during, and after construction.

Page 9: Kickapoo Creek Corridor Restoration Project “One Project…. …many goals (and how 319 helped fund it)” Kaskaskia Engineering Group Mary Lou Goodpaster Bryan