Download - ION CHAMBER INTRODUCTION TRANSITION - HANDOFF FROM EESIC SESSION 1 21 SLIDES TOTAL OCT 12 2010 1
Transcript
- Slide 1
- ION CHAMBER INTRODUCTION TRANSITION - HANDOFF FROM EESIC SESSION 1 21 SLIDES TOTAL OCT 12 2010 1
- Slide 2
- WHAT IS IT? A MEANS OF PROTECTING VACUUM BEAMLINE HARDWARE IN THE EVENT OF UNINTENDED BEAM / HARDWARE INTERACTION. 2
- Slide 3
- HOW DOES IT PROTECT? TRIGGERS THE FSD SYSTEM WHEN THE ION CHAMBERS OUTPUT EXCEED THE ADJUSTABLE (REMOTELY) TRIP LEVEL 3
- Slide 4
- WHERE IS THS SYSTEM INSTALLED? HALL A AND HALL C ELECTRONICS CABINETS 1/HALL IS THE PRIMARY CENTRAL COMPONENT. LOCATED IN THE LABYRYNTH ( WITHIN THE HALL BUT OUTSIDE RADIATION ZONE) 4
- Slide 5
- TYPICAL CHAMBER INSTALLATION SW CORNER OF HALL C PIVOT PLATFORM 5
- Slide 6
- SCATTERING CHAMBER LOCATION 6
- Slide 7
- WHAT IS IN THE CABINET? PLC CONTROLLER, ASSOCIATED I/O MODULES, UPS, 5VPS, 24VPS GRAPHICAL TOUCH SCREEN ON DOOR INTERFACE BOARDS. 1/ION CHAMBER SPARE COMPONENTS 7
- Slide 8
- INSIDE VIEW OF CABINET HALLS A AND C ARE SIMILAR NOTE 8 CHANNELS MAXIMUM 8
- Slide 9
- CABINET EXTERIOR GRAPHICAL TOUCH SCREEN CABLES TO BLACK BOXES NETWORK/ COMMUNICATIONS 9
- Slide 10
- LOCAL CONTROL / TESTING 10
- Slide 11
- PLC RAIL 11
- Slide 12
- POWER SUPPLIES 12
- Slide 13
- PURPOSE OF THE BLACK BOX TRANSITION BETWEEN THE ELECTRONICS CABINET INTERFACE CABLES (1/CHAMBER) AND THE ION CHAMBERS SHV AND BNC CONNECTORS TO/FROM CHAMBERS TRIM TRIO FOR 3PR CABLE PCB HAS CONVERTOR. 5v IN => 500V OUT 13
- Slide 14
- BLACK BOX 14
- Slide 15
- 15
- Slide 16
- INTERFACE BOARD TEST CMD INPUT RANGE SELECT, OUTPUTS SIGNAL FROM CHAMBER. NOTE SERIES RESISTOR LOW VOLTAGE INPUT 16
- Slide 17
- 17
- Slide 18
- MCC SCREENS ACCESS FROM EDM RADCON => HALL C ION CHAMBERS 18
- Slide 19
- 1 ST SCREEN 19
- Slide 20
- EXPERT SCREEN 20
- Slide 21
- AUTO SCREEN ALL CHAMBER TRIP LEVELS CAN BE PRESET FOR VARIOUS TARGETS AND BEAM PARAMETERS 21
- Slide 22
- FSD SCREEN 22
- Slide 23
- FAULT SCREEN 23