Transcript
Page 1: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Independent Examination of the Barnsley Local Plan Hearing Statement submitted by Hargreaves Services (UK) Ltd

Matter 14 : Development Management Policies

October 2017

Page 2: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Contents

1. Hearing Statement 1

Appendix 1: Copy of Previous Representations

Appendix 2: Review of Employment Policy Areas, June 2013

Lewis Evans

October 2017

Page 3: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

1

1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd

(HSUL) in respect of Stage 3 of the Barnsley Local Plan Examination. It follows earlier representations by The Monckton Coke and Chemical Company in respect of the Barnsley Local Plan (BLP) (included as Appendix 1). The Monckton Coke and Chemical Company became part of the Hargreaves group of companies in 2009.

1.2 Those representations focussed on the former Monckton Coke and Chemical Works at Royston. The site is located within the urban area of Barnsley, forming part of the settlement of Royston. The works closed in December 2014 due to structural changes in the coal market which rendered (and continue to render) the plant unviable.

1.3 The site has since been decommissioned and partially remediated to the condition it was in when an Environmental Permit was granted in 2002. The majority of above ground structures associated with the former use (comprising industrial buildings and structures) have now been removed. The surface is characterised by piles of demolition rubble and hardstanding. Several demountable buildings and minor structures (such as sub stations) remain. The remains of a biological effluent plan is located to the far southern end of the site. The northern part comprises a spoil heap and open coke / coal storage.

1.4 HSUL has been promoting a mixed use development of the site, involving completion of the remediation of the site and delivery of a mixed-use development delivering high quality residential and employment accommodation. The site is unallocated in the emerging BLP; and the Monckton Coke and Chemical Company’s previous representations supported this.

1.5 HSUL intends to submit an application for hybrid planning permission (full permission in respect of the remediation, and outline in respect of the residential and employment elements) shortly. It has been in discussions with Barnsley MBC planning officers regarding the proposed development.

1.6 Through these discussions, planning officers have suggested that the application would be treated as a former employment site and would therefore be subject to consideration against BLP policy E6.

1.7 It is in relation to that policy that HSUL therefore wishes to respond.

Main Matter 14 – Development Management Policies

Employment Policies

14.7 Is the approach to development on employment land (Policy E5) and protecting existing employment sites (Policy E6) justified, effective and consistent with national guidance?

1.8 The former Monckton Coke and Chemical works was a long-established use which pre-dated the planning system.

Page 4: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

2

1.9 The site is incapable of supporting employment uses (B1/B2/B8) in its current form, without further remediation (with the exception of that within a refurbished office building now used by Hargreaves which is outside the application site boundary and a very low number of residual jobs associated with the coal/coke stocking which will be lost when stocks are exhausted). Due to the scale and cost of the remediation works required, an element of residential development is required if the site is to be remediated and brought back into beneficial use. The limitations of the site for future employment use, which revolve around its location, and the need for a higher value use to facilitate any such development have been recognised by the Council in its evidence base1.

1.10 It assessed the application site, noting that it was still in use at that time and was therefore of value to the occupier for its bespoke use. However, it goes on to recognise that there are issues limiting its future potential, recognising the need for significant reclamation and contamination issues to be addressed. It goes on to state that:

‘the location is unestablished for employment space and therefore financial viability will mean higher value uses or public sector assistance would be required’ [emphasis added]

1.11 It achieved a ’Poor’ rating in relation to:

• market attractiveness for new build employment space; and

• potential viability of new build employment space.

It goes on to categorise the assessed sites, placing it within Tier 2, which comprises sites on which alternative uses “may be worth considering as better alternative employment locations exist in the borough’’.

1.12 The site is also identified as a developable site in the SHLAA.

1.13 Despite this, Council officers have asserted that an application for redevelopment of the site would be assessed against BLP Policy E6. Whilst HSUL believe that the development would be capable of complying with the exception criteria of the policy, they are faced with a practical example of issues arising from the wording of the policy.

1.14 It surely cannot be the intention of the policy to potentially constrain or hold back the beneficial development of sites which have absolutely no realistic prospect of being developed for employment purposes. The subject site has no prospect of being brought back into use as a chemical or coke works and, as the Council acknowledge themselves, would require an alternative use such as housing in order to deliver redevelopment.

1.15 It seems that the possibility of a beneficial development being frustrated, should officers not agree with HSUL’s justification against the exception criteria, can be easily avoided through the inclusion of a simple amendment to the policy (or the supporting text).

1.16 An amendment is suggested by HSUL below (shown as tracked changes):

1 Review of Employment Policy Areas, June 2013 – See Appendix 2

Page 5: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

3

Land or premises currently or last used for employment purposes will be retained in order to safeguard existing or potential jobs.

• Such sites may be developed if the land or premises has no realistic prospect of being brought back into use or being redeveloped for employment use as demonstrated by the applicant or through reference to the Council’s Review of Employment Policy Areas (or equivalent).

In all other circumstances, Tthe development of employment land and premises for non-employment uses will only take place if:

• development would not result in a significant loss of existing jobs or employment potential; and

• there will still be an adequate supply of employment land or premises in the locality; and

• the land or premises cannot satisfactorily support continued employment use.

If the above criteria can be satisfied then redevelopment will be allowed.

1.17 It is considered that the corresponding supporting text should be updated to reflect the amended policy. This would prevent the development of sites which are otherwise suitable for development from being delivered. In doing so it would accord with the National Planning Policy Framework which requires LPAs to avoid the long-term protection of employment sites where there is no reasonable prospect of a site being used for that purpose. Whilst that it is relation to allocated sites, it is considered that the same principles apply to sites where the LPA is seeking to protect sites currently or formerly used for employment.

Page 6: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Appendix 1: Copy of Previous Representations

Page 7: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

We would like you to use our online consultation portal at http://consult.barnsley.gov.uk/portal

If you are unable to do this then send us your completed comments form by e-mail to

[email protected] or by post to Planning Policy, Development, BMBC, PO Box 604, Barnsley, S70 9FE.

You can comment on the Consultation Draft Local Plan document, the associated Policies Map and

the Sustainability Appraisal in these ways.

IMPORTANT Please complete a separate comments form for each individual comment you are making and

keep the first sheet containing your personal details separate.

Please note that any comments you make will be made publically available and attributed to your name.

We must receive all responses by midnight on Sunday 21st December 2014 to enable us to give

them proper consideration.

For official use only: Personal Details* Agent’s Details (if applicable) *If an agent is appointed, please complete only the ID Number, Title and Name boxes below, but complete the full contact details of the agent in column 2. ID Number (if known)

Title Mr

First Name Matthew

Last Name Sheppard

Job Title Director

Organisation The Monckton Coke and Chemical Co.

Address Line 1 Lund Hill Lane

Line 2 Royston

Line 3

Line 4

Post Code

Telephone

E-mail Address Declaration: I understand that all comments submitted will be considered by the Authority in line with this consultation, and that my comments will be made publicly available and may be identifiable to my name/ organisation: Signature:

Date: 08-01-15

Barnsley Consultation Draft Local Plan Comments Form

Page 8: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Comments

Please indicate the relevant document, vision and objectives, policy, table, site reference, site policy (where relevant), figure or appendix to which your comments relate:

Document Policies Map Sustainability Appraisal

Vision and Objectives

Policy Site reference

Site policy (where relevant)

Table Figure

Appendix

On 12 December 2014, the parent company of Monckton Coke Works confirmed that, with no significant improvement in market conditions or customer demand, the site was to close, with coke production ceasing during that month. The plant is now being de-commissioned.

The mine which provided the basic feedstock or the coke making process has now closed due to safety concerns. The importation of equivalent feedstock has not proved to be viable given the additional transport and purchase costs. The economic fortunes of the site have also been affected by difficult trading conditions and an uncertain market. This site is a current employment allocation and we consider that it would be prudent to make allowance in the Local Plan for a redevelopment which is economically capable of restoring the site. We support the principle of a “white land” designation on this site as this offers flexibility for any alternative development proposals which may prove to be necessary within the plan period. However, we would welcome dialogue on how a more specific allocation could facilitate a more flexible future for the site, which may be needed in the foreseeable future. We consider that a mixed policy allocation could provide for a range of uses which could deliver a balance of employment generating uses, as well as uses which generate enough value to see the proper remediation of the site. Such an allocation would provide a more secure policy background for any future consideration of the sites redevelopment, and would allow flexibility to both ensure the appropriate restoration of the site, as well as looking to replace some of the jobs lost through the closure of the Coke Works. The site is within the defined urban area, is previously developed and has good accessibility to both Barnsley and Wakefield. We consider it to be an ideal redevelopment site, which could assist with meeting the wider targets for housing and employment land. It should now also become available within the plan period.

Page 9: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Appendix 2: Review of Employment Policy Areas, June 2013

Page 10: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Final Report June 2013

Barnsley MBC

Review of Employment Policy Areas Final Report

Page 11: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

27294

Benell Investments Ltd disclaims any responsibility to the Client and others in respect of any matters

outside the scope of this report. This report has been prepared with reasonable skill, care and

diligence within the terms of the Contract with the Client and generally in accordance with the

appropriate ACE Agreement and taking account of the manpower, resources, investigations and

testing devoted to it by agreement with the Client. This report is confidential to the Client and Benell

Investments Ltd accepts no responsibility of whatsoever nature to third parties to whom this report

or any part thereof is made known. Any such party relies upon the report at their own risk.

© Benell Investments Ltd 2013

Page 12: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

CONTENTS

1 INTRODUCTION ................................................................................................................. 1

2 METHODOLOGY & ASSUMPTIONS .................................................................................. 2

3 CURRENT USE OF SITES ................................................................................................. 5

4 MARKET ATTRACTIVENESS OF SITES .......................................................................... 18

5 SUMMARY OF FINDINGS ................................................................................................ 36

APPENDICES

Appendix A – Existing Use Status Schedule

Appendix B – Market Attractiveness & Viability Schedule

Appendix C – Separate Tier with Existing Use Status Schedule

Appendix D – Site Plans

Page 13: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of
Page 14: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 1

1 INTRODUCTION

1.1 Benell Investments were commissioned by Barnsley Metropolitan Borough Council (BMBC)

to provide a review of existing employment land in Employment Policy Areas.

1.2 Employment Policy Areas are set out in the Unitary Development Plans and form part of the

boroughs employment offer for land and premises. Many of the sites are situated within

built up areas and range in size from 1 to 50 hectares.

1.3 BMBC are proposing new employment sites within the new Local Development Framework

(LDF) and it is therefore important to review the existing employment sites within the

borough. This review will assess the current use of the sites as well as providing a view on

the attractiveness of the site to the general market. Our proposed methodology to this is set

out in Section 2.

1.4 The review and categorisation of sites has been undertaken within Section 3 of this report.

Section 4 provides an assessment of the market attractiveness of the site and its potential

suitability for continued employment use. Section 5 summarises the work undertaken and

draws conclusions where appropriate.

1.5 All appraisal and valuation work in this report has been undertaken by a suitably qualified

Chartered Surveyor (MRICS) and in accordance with Royal Institute of Chartered

Surveyors (RICS) guidelines.

Page 15: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 2

2 METHODOLOGY & ASSUMPTIONS

2.6 The Employment Policy Areas have been separated into Community Areas on the following

basis. The Unitary Development Plan (UDP) reference for the particular area is provided in

brackets.

Barnsley Urban (BA)

Darton (DT)

Dodworth (DO)

Royston (RO)

North East Towns (NE)

Dearne (DE)

Wombwell (WW)

Hoyland (HN)

Penistone (PE)

Western Rural (WR)

2.7 It was agreed with BMBC to assess the sites by way of looking at various factors.

2.8 Following a site visit to each site together with the plans of each site (Appendix D), we have

reviewed the current uses on site in order to categorise its status. This categorisation

provides a factual description of the type of activity that is currently being undertaken.

Section 3 sets out each individual site and gives some commentary of its current use. We

have then summarised each site into an individual category which has been set out in

Section 5.

2.9 The following provides the individual categories which each site falls into

Existing Trading Businesses

Existing Businesses in poor quality units

Derelict/Cleared Site

Empty Buildings

Redeveloped or with Planning Permission for Residential Use

Not in Use/Undevelopable

2.10 We would comment on each of the categories are follows

Existing Trading Businesses

2.11 Many of the sites and premises reviewed have existing businesses in occupation and

trading. To clarify the review, the quality of the business that is in occupation has not been

judged although a judgement on the quality of the premises has been undertaken.

Existing Businesses in poor quality units

2.12 Where there are sites and premises that have existing businesses that are trading in

accommodation that is suitable for their particular use but would be considered of poor

quality to the general market, this has been highlighted. This does have a material effect

when attempting to establish the market attractiveness to the general market.

Page 16: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 3

Derelict / Cleared Site

2.13 Where sites currently house no buildings or structures that would be suitable for

occupation, this has been highlighted. There may be reasons for the cleared or derelict

nature and where information is available, we have set these reasons out.

Empty Buildings

2.14 Where sites currently house buildings or structures which are currently not in use, this has

been highlighted. The buildings are not derelict or in need of major improvement work and

could be brought back into use subject to market demand for the type of building.

Redeveloped or with Planning Permission for Residential use

2.15 Upon review, certain sites have been found to be either already developed for residential

use or have secured planning permission for such use. Given the likely levels of financial

return, such uses will not revert back to employment even if desired.

Not in Use/ Undevelopable

2.16 A small number of sites have found to be not in use or unusable for development. This has

been highlighted in order to ensure that a complete picture of the boroughs employment

land is provided.

2.17 Following a review of the existing use of each site, we have then turned our attention to the

market attractiveness of the site and its potential for redevelopment. This has been set out

in Section 4.

2.18 The market attractiveness of any site is dictated by a number of factors. This would include

an assessment of the location, the general environment, the current surroundings, proximity

to the highway network as well as its neighbouring sites’ uses. However, what is crucial is

that it is established which “market” we are judging when assessing its attractiveness.

2.19 Many of the sites are currently in occupation by existing businesses. This report does not

try to judge whether a particular use of a site is good or bad use of the site. In order to do

this exercise, the criteria by which an occupier is judged would need to be established.

2.20 What we have tried to assess, is the market attractiveness of the sites and premises in its

current state and based upon its current values. For example, a site which provides cheap

accommodation and which is fully let, indicates that this accommodation is currently

fulfilling a demand within the borough. Without this type of premises, these occupiers would

need to be housed somewhere.

2.21 However when assessing a site for new employment space, the current provision is of less

consequence and factors relevant to new build premises would have an effect on its

attractiveness. Using the same example above, a site that is full of occupiers based upon

low rentals does not necessarily mean that if redeveloped for new build, it would be

successful.

2.22 Although the factors that affect new build are a subjective judgement, we have attempted to

view the site from a future occupiers’ perspective in trying to establish an opinion. This

Page 17: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 4

approach was used on the recent study undertaken by Peter Brett Associates on behalf of

BMBC which provided a Market Assessment of the proposed LDF Employment Sites.

2.23 From our experience factors such as road network, neighbouring use, proximity to

residential, servicing requirements etc. all have an impact on the suitability of a site to a

potential occupier. Each of these issues has been taken into account on individual sites in

order to make an assessment of its suitability for new development.

2.24 In addition to the market attractiveness of new build, the financial viability of redevelopment

has been assessed. Although detailed financial appraisals have not been undertaken for

each site, a general assessment of viability has been undertaken for each site.

2.25 The assessment criteria used for the market attractiveness and viability is set out in the

matrix below.

Level

Criteria

Good Average Poor

Market Attractiveness for current employment space

Provides sites and

premises that

occupiers require and

is at high occupancy

levels.

Indicates sites with

some demand from

occupiers although

occupancy levels

aren’t high.

Little or no demand

based on use and

values. Poor use of

the site.

Market Attractiveness for new build employment space

The site would be well

received should

redevelopment occur.

Potential demand for

occupiers at this

location but not

considered prime.

Little demand for

redevelopment of

employment space.

Potential Viability of new build employment space

Financially would work

in the current market.

May need an uplift in

market or assistance

to be financially viable.

Significant uplift in the

market required to be

viable.

2.26 Based upon this assessment criteria for both current use and new build space, all sites can

then be reviewed in the context of either scenario.

Page 18: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 5

3 CURRENT USE OF EXISTING SITES

Based on the methodology set out in Section 2, we have undertaken a review of all employment

sites within the Employment Policy Areas. This data has been summarised in Section 5 with a full

schedule of sites included in Appendix A.

Barnsley Urban UDP Community Area

UDP Ref Site Name Hectarage

BA5/1 R.J. MASTERS, METRO TRADING ESTATE 3.8

The area identified is situated just off Barugh Green Road and provides reasonable quality units which have been subdivided within a former industrial facility. In general the units are occupied with various businesses trading including window companies, mechanics, furniture providers etc.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA5/2 BARUGH GREEN ROAD 3.0

The area identified on the plan is a site fronting Barugh Green Road on the roundabout with Claycliffe Road. To the west of the site, a good quality large engineering facility is situated with external storage areas. This building is in occupation with a trading company. The central part of the site is a cleared vacant site ready for development although no marketing boards are erected. The eastern area of the site now houses a pub with associated car parking. CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES / CLEARED VACANT SITE

UDP Ref Site Name Hectarage

BA5/3 CLAYCLIFFE INDUSTRIAL ESTATE 33.1

Claycliffe Industrial Estate is a long standing well established area of the borough which continues to provide land and premises for occupiers. The vast majority of the area is developed and occupied although given current market condition, there are some vacancies which would be expected.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 19: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 6

UDP Ref Site Name Hectarage

BA5/5 CRS DISTRIBUTION DEPOT, BROADWAY 3.9

The site identified provides an existing distribution which is fully occupied. There is a modern quality building with good site coverage.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA5/8 WEST STREET, WORSBROUGH 2.7

The area lies to the south of West Street and provides a number of industrial buildings providing a range of sizes and quality. To the west of the site, there are a number of poor quality buildings which are being utilised for storage and other low value uses. In the centre of the site, a good quality industrial building which was previously occupied is now vacant. On the western tip of the site, some older buildings provide a tyre centre and martial arts facility.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES / POOR QUALITY UNITS

UDP Ref Site Name Hectarage

BA5/9 PONTEFRACT ROAD, HOYLE MILL 2.7

This area is located next to the Oakwell Brewery site (BA5/19) and is located either side of Pontefract Road. The southern area houses numerous businesses including a lighting firm, furniture and builders merchant. Part of the southern site is cleared and has previously been consented for residential (Planning Ref: B/04/2023/BA). This consent has lapsed and an application for an extension of time was refused in March 2012 (Planning Ref: 2011/1485). This is therefore currently a cleared site. The northern areas of the site is a multi-occupied area with a council workshop scheme (Beevor Industrial Estate), type centre as well as numerous other industrial and office units.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES / CLEARED SITE

UDP Ref Site Name Hectarage

BA5/10 BARNSLEY MAIN TRANSPORT DEPOT, OAKS LANE 3.9

The site set out on the plan provided is an existing business which is involved in the manufacture of wet cast reconstituted stone and architectural precast products. Access was not possible to the rear of the site but aerial shots indicate a large yard area with various buildings within.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 20: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 7

UDP Ref Site Name Hectarage

BA5/11 OAKS LANE / GRANGE LANE 14.1

The site is situated between Oaks Lane and Grange Lane and is a mix of various uses. To the west of the area, there is a cleared site which was the Beatson Clark Glass Foundry which has now been demolished and cleared. We understand that applications for residential consent have been submitted in the past but been refused. The eastern part of the site is accessed off Grange Lane and provides good quality units of which the majority are occupied.

CURRENT USE SUMMARY – CLEARED SITE / EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA5/12 BLEACHCROFT WAY INDUSTRIAL ESTATE 5.1

The area identified on the plan indicates two separate buildings. To the west, the large building houses a B & Q retail building while the other building has been subdivided and provides a carpet retailer and wholesaler trader. To the south of the site there is a modern office building with a single occupier.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA5/14 LAITHES LANE / CARLTON ROAD 6.6

This area is primarily situated on Carlton Road, opposite the main Carlton Industrial Estate. The western area of the site houses a glass recycling company which includes significant open storage. There are numerous other buildings with the area identified including a recently refurbished building which has been converted into a multi let industrial scheme. There are other buildings on site, all of which were occupied.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA5/15 CARLTON INDUSTRIAL ESTATE 55.4

Carlton Industrial Estate is a long standing well established area of the borough which continues to provide land and premises for occupiers. The vast majority of the area is developed and occupied although given current market condition, there are some vacancies which would be expected.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 21: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 8

UDP Ref Site Name Hectarage

BA5/16 LYONS BAKERY 22.8

The area of land identified provides a substantial existing building off Fish Dam Lane together with a large area of land to the rear of the building. This land would be difficult to develop independently although provides the company in occupation (Premier Foods), potentially significant expansion land.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA5/17 WEST ROAD / STOCKS LANE 2.7

The site identified on the plan is situated on West Road, just off Pogmoor Road. It currently provides a range of buildings although the vast majority are of low quality. There is a significant area of land that is cleared and at the time of inspection, some earthwork moving was taking place. The majority of the buildings are vacant although there are some low value businesses in occupation.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES IN POOR QUALITY BUILDINGS/EMPTY BUILDINGS/CLEARED SITE

UDP Ref Site Name Hectarage

BA5/18 TWIBELL STREET 2.9

The site lies on the outskirts of the town centre and comprises of two separate areas. The larger of the two sites lies at the end of Twibell Street majority of this site houses the Bookers Cash & Carry Wholesalers. This area is in operational use. The remainder of the larger site is a small cleared area although no marketing is taking place. The smaller site lies midway up Twibell Street and currently houses a fencing company on site.

BA5/18 - CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA5/19 WAKEFIELD ROAD / PEEL PLACE 2.3

This site is situated on the outskirts of the town centre just off Old Mill Lane. It is a linear shaped area upon which various buildings are housed of differing quality. The southern part of the site houses a newly developed retail warehousing units, followed by various units occupied by varying forms of uses including car sales, mechanics and contractors. The standard of the units vary with some parts of the site being temporary or old poor quality units and others being newly constructed. However, given its gateway location the site is in general fully occupied.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 22: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 9

UDP Ref Site Name Hectarage

BA5/20 I.S. MAINTENANCE, WAKEFIELD ROAD 1.1

The site is situated to the rear of New Lodge Working Mens Club on Wakefield Road. The buildings on site are reasonable quality and are all fully occupied by an existing engineering business. There are significant external storage areas.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA39/3/1 HARBOROUGH HILL ROAD/ DRYDEN ROAD 0.9

This site is situated on the outskirts of the town centre and forms a split level area with different occupiers. The southern area forms the Harborough Hills Business Park and is a multi let workshop scheme which is fully occupied. In addition, the frontage area is occupied by a car rental firm. Part of the site is occupied by a contractor.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

BA39/3/2 OAKWELL BREWERY 4.3

This site is situated just off Pontefract Road close to Oakwell football ground. There are various buildings on site although some of the buildings indicated on the plan provided have been demolished and they now form cleared sites. Parts of the site are occupied with various uses in occupation. Some buildings lie vacant and are not suitable for occupation. We understand that the owners of the site have recently served notices to vacate on existing occupiers on site. This would indicate that the owners are preparing for the clearance and redevelopment of the site. We have therefore classified this site and part cleared site and part empty buildings.

CURRENT USE SUMMARY – DERELICT SITE / EMPTY BUILDINGS

UDP Ref Site Name Hectarage

BA40/3/1 P.L.M. REDFEARNS MONK BRETTON GLASSWORKS 31.1

This significant site is currently operational and provides a major glasswork facility in the borough. Various buildings are located on site on varying quality and design.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 23: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 10

UDP Ref Site Name Hectarage

BA40/3/3 SOUTH OF BURTON ROAD, MONK BRETTON 2.0

The area of land identified provides open land and temporary or poor quality buildings just off Burton Road. The area is fully occupied with existing businesses such as mechanics, building material company, hard landscaping providers. CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES IN POOR QUALITY UNITS

Darton UDP Community Area

UDP Ref Site Name Hectarage

DT/4/1 SHAW CARPETS, BARNSLEY ROAD 7.1

This substantial site lies just off Barnsley Road in Darton and provides large good quality buildings which have been subdivided to offer a multi let estate. There are numerous occupiers on site although given current market conditions, there are some vacancies.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

DT/4/2 MAPPLEWELL BUSINESS PARK 1.1

The area identified provides a multi occupied site with reasonable quality buildings. The levels of occupation seemed to be very good with occupiers including mechanics and car recovery business. There are significant elements of open storage although this is well screened from the adjacent residential.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

DT/4/3 WILLIAM FREEMANS, WAKEFIELD ROAD, STAINCROSS 3

This area is situated on the main Wakefield Road close to the junction with Bar Lane. The former Freemans buildings have now been demolished to leave a level cleared site. There are other uses on the area identified including a newly constructed restaurant together with poorer quality buildings with open storage uses. The Freemans site was examined as part of the recent Peter Brett Associates study of proposed LDF employment sites.

CURRENT USE SUMMARY – CLEARED SITE / EXISTING TRADING BUSINESS/ES

Page 24: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 11

UDP Ref Site Name Hectarage

DT/4/4 BP CHEMICALS, HUDDERSFIELD ROAD, KEXBOROUGH 6.6

This area is situated off Huddersfield Road and provides a range of buildings including industrial and office use. The site has been sub divided and is currently a multi let facility called Junction 38 Business Park. There are a number of vacancies given current market conditions however this is expected at the current time.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES Dodworth UDP Community Area

UDP Ref Site Name Hectarage

DO4/1 FALL BANK INDUSTRIAL ESTATE 13.2

The area identified forms the long established Fall Bank Industrial Estate which houses numerous industrial buildings of differing quality. There has been some small scale new build units developed in recent years although there are some lower quality buildings also. There are some vacancies although the vast majority are occupied.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

DO4/2 DODWORTH BUSINESS PARK 8.5

The plan identifies part of the Dodworth Business Park which houses a multi occupied estate together with a large single facility which is currently occupied by Koyo Bearings. The multi let buildings were originally developed by a government agency in the 1990’s and still provide good quality units, all of which are occupied,

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES Royston UDP Community Area

UDP Ref Site Name Hectarage

RO4/1 HIGH STREET 1.0

The site is a rectangular shaped site located on the main High Street in Royston. The site has been cleared with no buildings on site. There is a significant levels difference on site which would need to be reflected in the design of any new buildings.

CURRENT USE SUMMARY – CLEARED SITE

Page 25: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 12

UDP Ref Site Name Hectarage

RO4/2 MONCKTON COKE AND CHEMICAL WORKS 17.9

This major facility is still in use and is fully occupied. There are varying forms of building on site and vast open areas.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

RO4/3 BURNS CONSTRUCTION, MIDLAND ROAD 0.5

This area is situated to the rear of residential dwellings on Midland Road in Royston. The eastern edge of the site is bounded by the former Barnsley Canal and access is only gained by a narrow alley to the rear of the dwellings. It appears from aerial shots, that any former buildings here have been demolished and given its access constraints, is undevelopable.

CURRENT USE SUMMARY – UNDEVELOPABLE LAND North East Towns UDP Community Area

UDP Ref Site Name Hectarage

NE4/2 SHAFTON WORKSHOPS 5.6

The area identified provides an existing industrial and external storage area for an existing steel fabrication company. All areas are in use and are fully occupied

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

NE4/3 SHAFTON BUS GARAGE 0.8

This former bus garage is currently occupied by a scaffold company and is in use. The buildings are not of a particularly high standard but do provide low value coverage accommodation. The surrounding area is primarily residential in nature.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 26: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 13

UDP Ref Site Name Hectarage

NE4/4 SANDYBRIDGE LANE INDUSTRIAL UNITS 1.3

This area is situated on the edge of Shafton just off Sandybridge Lane. It provides good quality industrial space in a multi let estate. There are some vacancies that can be observed although there are significant number of businesses in occupation.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

NE4/5 ENGINE LANE / HIGH STREET, GRIMETHORPE 0.8

This area provides the council developed Acorn Business Centre on the edge of Grimethorpe. The buildings on site are well constructed and provide suitable accommodation for businesses in the area. Vacancy levels are variable with this type of development but in general, demand should exist at this location.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

NE4/6 CARLTON MAIN BRICKWORKS & PULVERITE 3.8

The area identified provides good quality units which are currently occupied together with the main facility for Carlton Brickworks. All areas are fully occupied. The plan that has been provided needs to be amended to reflect actual development on site.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES Dearne UDP Community Area

UDP Ref Site Name Hectarage

DE4/1 LIDGET LANE INDUSTRIAL ESTATE, THURNSCOE 7.1

The area identified indicates the long established Lidget Land Industrial Estate in Thurnscoe. It currently houses a number of industrial buildings including small workshops and larger occupied buildings. There are also plots of land available for development. Given current market conditions, there are a number of vacancies in the area.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES / CLEARED LAND

Page 27: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 14

UDP Ref Site Name Hectarage

DE4/2 THURNSCOE WORKSHOPS, LIDGET LANE, THURNSCOE 1.1

This area lies around the former colliery area of Thurnscoe and houses the Thurnscoe Business Centre on part of the site with open storage area on the remainder. The Business Centre is situated on the eastern part of the site and is in operation. Occupancy levels are variable but there are a number of occupiers within the facility. The western area of the site is difficult to inspect however it appears to be very poor quality temporary structures and open storage. CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES /IN POOR QUALITY UNITS

UDP Ref Site Name Hectarage

DE4/3 GOLDTHORPE INDUSTRIAL ESTATE 16

The plan identifies the majority of Goldthorpe Industrial Estate which is a long standing well established area of the borough which continues to provide land and premises for occupiers. The entire area is developed and occupied although given current market condition, there are some vacancies which would be expected.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

DE4/4 LAND SOUTH OF BEEVER STREET, GOLDTHORPE 1.6

This area of land is situated to the south of a housing estate in Goldthorpe. It currently houses 3 buildings: one is a BT facility, the other providing workshop facilities and the remaining unit a derelict structure of a former dairy. The south of the site is a former railway line and to the east of the site, land has been granted planning permission for residential development. The BT facility is a modern building however the other buildings are low quality workshop units with only 1 occupied. CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES /IN POOR QUALITY UNITS

Wombwell UDP Community Area

UDP Ref Site Name Hectarage

WW5/2 ALDHAM INDUSTRIAL ESTATE, WOMBWELL 6.1

The area is situated on the main Barnsley Road in Wombwell and provided multi occupied estate. To the South East of the site, a structural steelwork contractor occupies nearly 50% of the overall area with the remainder housing a good quality multi let industrial estate.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 28: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 15

UDP Ref Site Name Hectarage

WW5/3 STATION ROAD INDUSTRIAL ESTATE, WOMBWELL 14.9

This site lies off Station Road and houses various industrial buildings of varying quality. In general the buildings seem well occupied although there are vacancies. To the North East of the area, the land is derelict and cleared. A planning application for residential was submitted in 2010 and has yet to be determined. In addition, a further application for housing was submitted for the frontage site to the South East in 2012 although this was withdrawn with no decision made.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES/ DERELICT SITE

UDP Ref Site Name Hectarage

WW5/6 INGS ROAD DEPOT, LOW VALLEY 1.7

The site is a former council depot situated on Ings Road in Wombwell. Currently, the buildings are vacant and site is derelict. The site is next to a water treatment facility and opposite a new housing estate. A planning application for the redevelopment of the site into a scheme of 48 industrial units was passed in May 2012 although we understand that the developer has now gone into liquidation.

CURRENT USE SUMMARY – CLEARED/DERELICT SITE Hoyland UDP Community Area

UDP Ref Site Name Hectarage

HN4/1 WENTWORTH INDUSTRIAL PARK, TANKERSLEY 49.7

Situated on the west side of Junction 36 of the M1, Wentworth Industrial Park at Tankersley is a long established estate providing a number of quality buildings including both offices and industrial uses. Part of the plan provided indicates some residential development has taken place in Tankersley.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES / RESIDENTIAL DEVELOPED

UDP Ref Site Name Hectarage

HN4/2 PLATTS COMMON INDUSTRIAL ESTATE, HOYLAND 14.6

Situated on the east side of Junction 36 of the M1, Platts Common Industrial Estate at Hoyland is a long established estate providing a number of industrial buildings ranging in quality. At the time of inspection, there were a number of vacancies which would be expected given current market conditions.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 29: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 16

UDP Ref Site Name Hectarage

HN4/3 ROCKINGHAM ROW, BIRDWELL 4.3

Situated on the east side of Junction 36 of the M1, the plan identifies the multi occupied Rockingham Business Park as well as some older buildings opposite to the west of Sheffield Road. Rockingham Business Park is a long established estate providing a number of industrial buildings ranging in quality. At the time of inspection, there were a number of vacancies which would be expected given current market conditions.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

HN4/4 TINKER ROAD 1.83

The site is situated to the east of Junction 36 of the M1 and is .located on the western boundary of Hoyland. Currently separated into two areas, the western area of the site is accessed via Cross Key Lane and is currently fully occupied by a grit blasting company. This occupier also retains a large open area of land towards the centre of the site. To the east, is land and premises which are also fully occupied. This area is accessed via Tinker Road which is primarily a residential street and is particularly narrow for commercial vehicles.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES Penistone UDP Community Area

UDP Ref Site Name Hectarage

PE4/1 DAVID BROWNS ENGINEERING, SPRINGVALE WORKS COMPLEX

10.4

The plans identify a substantial area off Green Road in Penistone which was, we understand a substantial engineering complex. Parts of the site have now been consented residential use and this has been implemented. There remains a linear site in between two housing areas which still retains the existing occupier and who is still in occupation

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES / RESIDENTIAL SITE

UDP Ref Site Name Hectarage

PE4/2 LAND AND PREMISES NORTH OF SHEFFIELD ROAD, SPRINGVALE

4.8

The area identified provides a variety of buildings just off Sheffield Road. The majority of the site is taken up by a complex of older industrial buildings most of which are still occupied. Part of the site is a sport pitch which is utilised by the adjacent school.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 30: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 17

UDP Ref Site Name Hectarage

PE4/3 LAND AND PREMISES SOUTH OF SHEFFIELD ROAD, SPRINGVALE

3.2

The area provides a variety of buildings to the east of Penistone. The central and eastern areas of the site have a variety of buildings including a filling station which fronts Sheffield Road with poorer quality buildings to the rear of the site. To the west of the site, a residential apartment scheme has been developed and we understand that part of the site has previously been granted outline consent for housing.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES / RESIDENTIAL DEVELOPED

UDP Ref Site Name Hectarage

PE4/4 DURRAN’S WORKS, THURLSTONE 3.3

The site lies off the A628 Manchester Road in Thurlstone and houses a long established company Durrans. A major extension is currently underway by the current occupiers

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

UDP Ref Site Name Hectarage

PE4/6 PENISTONE RAILWAY STATION 4.3

The area identified in the plan is separated into two distinct areas which are bisected by the railway line. To the west of the railway, part of the site houses an existing building which is fully occupied. The remainder of the easterly site forms the Penistone Railway Station facility which is in full use. To the east of the railway, the western area has been developed for new build residential dwellings while the remainder is currently fully utilised for the BMBC Springvale highway depot.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES/RESIDENTIAL DEVELOPED Western Rural UDP Community Area

UDP Ref Site Name Hectarage

WR9/1 THORPE’S HAULAGE PREMISES, HALIFAX ROAD, THURGOLAND

1.4

The plan identifies a small number of buildings of varying quality together with a small retail outlet and large open storage area. Currently used by a haulage operator, the site is fully occupied.

CURRENT USE SUMMARY – EXISTING TRADING BUSINESS/ES

Page 31: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 18

4 MARKET ATTRACTIVENESS & VIABILITY As set out in Section 2, we have attempted to assess the attractiveness of the site on the basis of its existing use as well as assessing its attractiveness for new build employment space. A full schedule of sites indicating their grading has been included in Appendix B. In judging the existing use, the quality of the occupier has not been judged but the quality of the accommodation together with the general site characteristics.

Barnsley Urban UDP Community Area

UDP Ref Site Name Hectarage

BA5/1 R.J. MASTERS, METRO TRADING ESTATE 3.7

The site is situated in the Barugh Green area of the borough and is an established employment location. The current multi occupied nature of the building is suitable as there would be restricted demand for a single occupier in the current market. Vacancy levels seem reasonable for the current stock. Should redevelopment take place, we would expect new build employment space to be well received which would be reflected in the financial viability of such a scheme. Although in the current market some element of growth in values would be required. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA5/2 BARUGH GREEN ROAD 1.2

The majority of the site currently identified provides a good quality building that is in fully occupation. Barugh Green is a good location and therefore we would expect this unit to be well received by the market if it became available. The cleared site is not being marketed properly and may be being held in order to secure higher value uses. We would recommend the pub buildings be excluded from the employment policy area designation. Our scores have assumed that the pub is not being assessed. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

Page 32: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 19

UDP Ref Site Name Hectarage

BA5/3 CLAYCLIFFE INDUSTRIAL ESTATE 34.3

The main Claycliffe estate is an established location and continues to provide buildings that are attractive to the general market. We see no reason why this success would not continue. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA5/5 CRS DISTRIBUTION DEPOT, BROADWAY 3.5

The location of the building is not an established employment area but does benefit from good links to the motorway network and the overall borough. The current occupier has been in occupation for many years and therefore one can reasonably assume that the building satisfies their requirement. Should the building become vacant, we would not expect wholesale redevelopment as the building is a good quality building. However some subdivision may occur given its size. Given its proximity to housing and the school opposite, the location of the site for employment use is not ideal and depending on the prevailing market conditions at the time, redevelopment for other uses may be worth considering. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA5/8 WEST STREET, WORSBROUGH 2.8

In general the site does have existing low value businesses within the buildings however, the estate is far from fully occupied. The quality of some of the buildings is low and the better quality buildings being hidden from the main road and therefore seems rather isolated. There are no real alternatives in Worsbrough for employment use however the area lies to the south of borough and the potential new sites at Junction 36 would provide significant employment space which would be better located. We would not envisage significant market demand for new build accommodation at this location given the alternative sites at Junction 36. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space AVERAGE

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

Page 33: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 20

UDP Ref Site Name Hectarage

BA5/9 PONTEFRACT ROAD, HOYLE MILL 4.7

This area provides significant floorspace at a location that is reasonably accessible from the centre and a number of communities close by. The buildings currently on site are generally well occupied and business continues to find the location attractive. During the higher property value years some new development has taken place which would indicate that at certain periods of time, demand remains healthy. Some of the schemes developed have been either public sector or with funding assistance so financial viability would need to be examined in greater detail. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA5/10 BARNSLEY MAIN TRANSPORT DEPOT, OAKS LANE 3.6

The site lies to the rear of an existing industrial estate and it appears that the sites characteristics satisfies the business that is in occupation. Should redevelopment take place, we would expect general market demand to be reasonable at this location. Given current values in the area, it may be that assistance or some uplift would be required Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA5/11 OAKS LANE / GRANGE LANE 13.9

The site provides premises that are in an established location for employment space. There are some vacancies given current market demand, however in general the units provide good quality space in a prominent and accessible location. The cleared site is not being properly marketed and may requires some initial infrastructure and servicing in order to make it more attractive to the market. In general, we feel that the current employment space is satisfying a sector of the current market and should new build accommodation take place, this would also experience some demand. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

Page 34: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 21

UDP Ref Site Name Hectarage

BA5/12 BLEACHCROFT WAY INDUSTRIAL ESTATE 5.1

The area has been developed out for retail uses and we would envisage this use continuing given its location the surrounding uses. We would not expect employment space to be developed at this location. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA5/14 LAITHES LANE / CARLTON ROAD 2.9

This location forms part of the long established Carlton Road Industrial Estate and houses existing businesses within bespoke facilities and also multi occupied buildings. The recent refurbishment of premises at this location confirms that demand for employment space at this location is still being experienced. Should the glass recycling premises become vacant then we would envisage some sort of redevelopment on a similar basis to the adjacent site. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA5/15 CARLTON INDUSTRIAL ESTATE 53.7

The main Carlton Road Industrial Estate is a long established employment area of the borough and continues to provide buildings which are generally suitable for the market. Inevitable vacancies occur given the size of the estate and the current market. Redevelopment of buildings has taken place which demonstrates that the market continues to see this area as an attractive location.

Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

Page 35: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 22

UDP Ref Site Name Hectarage

BA5/16 LYONS BAKERY 23

Current occupation of the building by a food manufacturer implies that the facility satisfies their current demand. The site is slightly detached from the main Carlton Industrial Estate and the building would be a large dated unit if it were to become vacant. We would expect some significant refurbishment or subdivision would be required if it were to be attractive to the market. For new build accommodation, we expect some demand although alternative uses may be worth considering given its detachment from the main estate. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

BA5/17 WEST ROAD / STOCKS LANE 3.3

The site sits on the outskirts of the town and is primarily surrounded by residential development. Redevelopment has taken place on Stocks Lane to provide multi occupied units which has proved successful although we are aware that significant public sector assistance was required to bridge the viability gap. The existing buildings on site are generally of poor quality and there only a small number of occupiers on site. The type of building that these occupiers would require, would be available at other locations in the borough. We would not expect new build employment space to be successful at this location given its characteristics and would recommend alternative uses are considered. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space POOR

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

BA5/18 TWIBELL STREET 3.2

The sites within this area are developed for differing uses although both are fully occupied. We would envisage the wholesale facility to the rear of the site would prove attractive to the market given its design and open storage elements. The smaller site sits within a residential environment and new build accommodation would not be envisaged at this location. Alternative uses for this smaller area may be worth considering. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

Page 36: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 23

UDP Ref Site Name Hectarage

BA5/19 WAKEFIELD ROAD / PEEL PLACE 2.3

This site lies in a good gateway location to the centre which has retail uses developed on adjacent sites. The buildings on site are extremely varied with low quality buildings through to brand new build accommodation. Aesthetically, the area does not provide the most attractive gateway to the centre although in general, all the buildings are well occupied. Some new build trade counter/retail has taken place on the site and if the site was to come up for redevelopment, we would expect this area to be popular. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA5/20 I.S. MAINTENANCE, WAKEFIELD ROAD 1.2

The site lies on the main Wakefield Road and is on the edge of Athersley to the south. Although not an established location, the site would provide accommodation to a local market should it become vacant. We would expect the external storage element to prove attractive to the market and its current occupation indicates that the facility meets the requirements of the current occupier. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA39/3/1 HARBOROUGH HILL ROAD/ DRYDEN ROAD 1.29

The site provides differing areas all of which are generally well occupied. The business park that has been developed on site is of good quality and the frontage unit is of reasonable quality. Should redevelopment take place, we would expect there will be continuing demand for some manner of employment space at this location given its accessibility and location. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

Page 37: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 24

UDP Ref Site Name Hectarage

BA39/3/2 OAKWELL BREWERY 5.3

The Oakwell Brewery site is situated in a location which has significant employment space and has traditionally seen good occupancy levels. The current state of the buildings on site means that occupancy is low although we would expect demand from occupiers if the buildings were in a better state of repair. The recent notice to vacate served by the owners would suggest that redevelopment will be taking place in due course. If employment space was to be provided, we would envisage some demand although this would be slightly depleted given current market conditions. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space POOR

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

BA40/3/1 P.L.M. REDFEARNS MONK BRETTON GLASSWORKS 30.4

The existing facility is fully utilised and given its bespoke nature, proves attractive to the current occupier. Should the facility become vacant, given the size and nature of the current site we would expect significant reclamation and contamination issues would need addressing. In general, the location is an established secondary area for employment space and therefore financial viability will mean higher value uses or public sector assistance would be required. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

BA40/3/3 SOUTH OF BURTON ROAD, MONK BRETTON 1.1

The area sits in an established secondary location and is currently fully occupied. The quality and type of buildings on site are generally poor and this is reflected in the occupiers on site. However, the area will continue to satisfy a sector which would rely on lower values in secondary locations. Some new build development has taken place although we are aware that significant levels of public sector assistance was provided which would not be available again. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

Page 38: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 25

Darton UDP Community Area

UDP Ref Site Name Hectarage

DT/4/1 SHAW CARPETS, BARNSLEY ROAD 11.7

Given the location and orientation of the building, we would envisage that the market will find the facility attractive. Although not a primary employment location, it benefits from good links to Junction 38 of the M1 and we would expect demand to continue. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

DT/4/2 MAPPLEWELL BUSINESS PARK 1.1

The units provide good quality buildings in a secondary location which currently satisfies local demand. The site is surrounded by commercial uses and we would expect to see continuing demand for the buildings. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

DT/4/3 WILLIAM FREEMANS, WAKEFIELD ROAD, STAINCROSS 2

The site lies in an unestablished location and is occupied by a small number of occupiers as well as a restaurant building. The surrounding environment is primarily residential and we would not expect there to be demand for new build space at this location. Given the proximity to the main Carlton Industrial Estate, we would recommend alternative uses be considered at this location. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space POOR

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

Page 39: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 26

UDP Ref Site Name Hectarage

DT/4/4 BP CHEMICALS, HUDDERSFIELD ROAD, KEXBOROUGH 7.5

The refurbishment and subdivision of the buildings to provide Junction 38 business park has proved that in general the market envisages demand at this location. Occupancy levels are reasonable given current market conditions. Should redevelopment take place, we see no reason why demand for employment space would not continue. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

Dodworth UDP Community Area

UDP Ref Site Name Hectarage

DO4/1 FALL BANK INDUSTRIAL ESTATE 13.3

This established location continues to provide an attractive proposition for occupiers and developers with continuing market demand and new build development taking place in recent years. Current market factors may indicate that financial viability is currently difficult, however we would not expect a major shift in values is needed to encourage new development. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

DO4/2 DODWORTH BUSINESS PARK 8.5

Lying in the proximity of the Fall Bank estate, the same principle applies for this site in that both existing and new build units would prove attractive in the current market. Again, Current market factors may indicate that financial viability is currently difficult, however we would not expect a major shift in values is needed to encourage new development. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

Page 40: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 27

Royston UDP Community Area

UDP Ref Site Name Hectarage

RO4/1 HIGH STREET 1.1

The site lies in an unestablished employment location and is surrounded primarily by residential uses. Although there is no marketing taking place, given the levels difference on site we would not expect the site to be attractive in its current state. New build accommodation at this location would be difficult to develop given its unproven nature and we would recommend alternative uses are considered. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space POOR

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

RO4/2 MONCKTON COKE AND CHEMICAL WORKS 18.4

The existing facility is fully utilised and given its bespoke nature, proves attractive to the current occupier. Should the facility become vacant, given the size and nature of the current site we would expect significant reclamation and contamination issues would need addressing. In general, the location is unestablished for employment space and therefore financial viability will mean higher value uses or public sector assistance would be required. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

RO4/3 BURNS CONSTRUCTION, MIDLAND ROAD 0.5

Given the sites access constraints and its location, we do not envisage any development taking place at this location. We would recommend alternative uses or reverting to open space be considered. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space POOR

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

Page 41: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 28

North East Towns UDP Community Area

UDP Ref Site Name Hectarage

NE4/2 SHAFTON WORKSHOPS 5.6

The current occupation illustrates that demand exists for the facility. Should redevelopment take place, we would not expect particularly strong demand as it sits in a secondary location. Should new sites be brought forward under the new LDF at Grimethorpe, then this would curtail further the likely demand from potential occupiers. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

NE4/3 SHAFTON BUS GARAGE 0.8

The buildings are currently occupied and therefore demand existing for the space. The general location is not one that would be attractive for new build employment space and given the primary neighbouring use is residential, we would recommend alternative uses are considered. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

NE4/4 SANDYBRIDGE LANE INDUSTRIAL UNITS 1.4

The site provides good quality units to the north of Shafton and vacancy rates are reasonable given current market conditions. The units provide a good secondary offer for businesses and should satisfy local demand. Should redevelopment take place, financial viability would be difficult given it characteristics. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

Page 42: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 29

UDP Ref Site Name Hectarage

NE4/5 ENGINE LANE / HIGH STREET, GRIMETHORPE 0.7

The site provides good quality accommodation in an established secondary location. Occupancy is reasonable and there is no reason to suggest that this should not continue. New build space at this location will continue to prove difficult given market values and if new dedicated land is allocated at this location, we would not envisage this site proving popular for new build employment space. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space AVERAGE

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

NE4/6 CARLTON MAIN BRICKWORKS & PULVERITE 3.7

The existing facility is fully utilised and given its bespoke nature, proves attractive to the current occupier. Should the facility become vacant, given the size and nature of the current site we would expect significant reclamation and contamination issues would need addressing. Given the area provides a gateway to the Park Springs employment area, we would envisage some demand and would therefore expect the market to see to site a potential opportunity. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

Dearne UDP Community Area

UDP Ref Site Name Hectarage

DE4/1 LIDGET LANE INDUSTRIAL ESTATE, THURNSCOE 7.4

The established employment area provides sites and premises for local occupiers and based on current occupancy levels, continues to satisfy a demand in the market. Given its secondary location and multi occupation arrangement, we would not expect significant development as well as a poor financial viability for any new build. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

Page 43: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 30

UDP Ref Site Name Hectarage

DE4/2 THURNSCOE WORKSHOPS, LIDGET LANE, THURNSCOE 1.7

The site is made up of Business Centre and also some open storage land to the west. We are aware that demand has not been particularly strong at this location. We would suggest that given the existing floorspace in and around the surrounding area, that there is sufficient supply for the demand at this location. The sites would not be particularly attractive to new build market and would therefore recommend alternative uses should redevelopment take place. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space POOR

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

DE4/3 GOLDTHORPE INDUSTRIAL ESTATE 16.8

The main Goldthorpe Industrial Estate is a long established employment area of the borough and continues to provide buildings which are generally suitable for the market. Inevitable vacancies occur given the size of the estate and the current market. Redevelopment of buildings has taken place which demonstrates that the market continues to see this area as an attractive location. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

UDP Ref Site Name Hectarage

DE4/4 LAND SOUTH OF BEEVER STREET, GOLDTHORPE 1.7

The difficultly of accessing this site together with its general location limits its potential. Aside from the BT building, the other buildings are of poor quality and low occupancy levels. We would recommend alternative uses should redevelopment occur and we would not envisage any new build employment space been undertaken at this location. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space POOR

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

Page 44: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 31

Wombwell UDP Community Area

UDP Ref Site Name Hectarage

WW5/2 ALDHAM INDUSTRIAL ESTATE, WOMBWELL 6.5

The site provides a good variety of buildings in an established secondary location. Current occupancy levels indicate that demand exists for the existing provision and should re development take place, we see no reason why this demand would not continue. Given current values in the area financial viability may be difficult. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

WW5/3 STATION ROAD INDUSTRIAL ESTATE, WOMBWELL 15.5

Aside from the eastern area of the site upon which residential is currently being considered the sites have reasonable occupancy levels and satisfy local demand for employment space. New build development would prove more difficult given values in the area and other better locations. However the current floorspace satisfies a demand in the current market. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

WW5/6 INGS ROAD DEPOT, LOW VALLEY 2.1

The site lies vacant with no marketing activity on site. Although a planning application was approved for industrial development, given the site developers are in liquidation we would not expect to see development activity in the short term. The site lies in an unestablished location and we do not envisage significant demand for new build floorspace at this location. We would recommend alternative uses are considered for this site. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space POOR

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

Page 45: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 32

Hoyland UDP Community Area

UDP Ref Site Name Hectarage

HN4/1 WENTWORTH INDUSTRIAL PARK, TANKERSLEY 53.3

Lying 1 mile to the West from Junction 36 of the M1 Wentworth Industrial Estate is one of the boroughs primary employment locations. It is long established employment area of the borough and continues to provide buildings which are generally suitable for the market. Inevitable vacancies occur given the size of the estate and the current market. Redevelopment of buildings has taken place which demonstrates that the market continues to see this area as an attractive location. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space GOOD

UDP Ref Site Name Hectarage

HN4/2 PLATTS COMMON INDUSTRIAL ESTATE, HOYLAND N/A

Platts Common Industrial Estate provides buildings which are generally suitable for the current market. Some of the buildings have become a little dated although the location has been enhanced by recent developments adjacent and around the area. Inevitable vacancies occur given the size of the estate and the current market. Redevelopment of buildings has taken place on adjacent sites which demonstrates that the market continues to see this area as an attractive location. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space GOOD

UDP Ref Site Name Hectarage

HN4/3 ROCKINGHAM ROW, BIRDWELL 4.7

The sites form a good secondary location not far from Junction 36 in an established area for employment space. Current space is well occupied which indicates attractiveness in the current market. Any new build space may have to compete with other better locations with the Hoyland area and although difficult in the current market, this may occur with some growth Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space AVERAGE

Page 46: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 33

UDP Ref Site Name Hectarage

HN4/4 TINKER LANE 1.83

This site is well located just off Junction 36 of the M1 at the entrance to Hoyland. Access to the site is from two separate points (Cross Keys Lane & Tinker Lane), both of which are narrow and suitable for modern commercial buildings. The western area lies adjacent to allocated employment land which is currently in the ownership of the Home & Communities Agency (HCA). If the HCA were to develop out their site, then this area could be accessed more suitably. However, without this new access the amount of road upgrading required may render the scheme unviable for employment use. Therefore, subject to accessing the site from the new development on the adjacent lane, we would consider this a good location for new build space, Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space GOOD

Potential Viability of new build employment space AVERAGE

Penistone UDP Community Area

UDP Ref Site Name Hectarage

PE4/1 DAVID BROWNS ENGINEERING, SPRINGVALE WORKS COMPLEX

15

The rationalisation of the site has seen a substantial reduction of the previous engineering works and residential development taking place on the vast majority of the site. The remaining complex is occupied and is attractive for their needs. However, should re development take place we would not envisage the site being attractive for new build given the proximity of residential. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

PE4/2 LAND AND PREMISES NORTH OF SHEFFIELD ROAD, SPRINGVALE

4.8

The land to the north of Sheffield Road provides a significant area of land within Springvale and is one of few sites to the west of the M1. Occupying various separate facilities, much of the current space is occupied although a few vacancies were noted. Most of the buildings on site were older facilities and their flexibility for modern operations may render them unsuitable in years to come. However, at the current time they provide suitable floorspace for this area. New build accommodation would be difficult to develop given the amount and nature of building current on site together with current market values in the area. We would therefore suggest that

Page 47: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 34

redevelopment for new build employment space would be a remote possibility and only possible with some form of public assistance or cross subsidy. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

PE4/3 LAND AND PREMISES SOUTH OF SHEFFIELD ROAD, SPRINGVALE

2.6

The current area is well occupied and satisfies demand for a sector of the market at this location. Values in the area reflect the secondary nature of the location for employment space and although there is a lack of provision in the west of the borough, demand is not strong. Should re development take place, new build would not be particular attractive to the market and financial viability would reflect this. Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

PE4/4 DURRAN’S WORKS, THURLSTONE 3.56

The recent new development by the existing occupier at this location illustrates that the facility

satisfies their requirement. However, the business has been in occupation for a substantial period

of time and we would not expect this facility to be attractive to the market should it become

available to the market. In this scenario, we would suggest alternative uses are considered.

Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

UDP Ref Site Name Hectarage

PE4/6 PENISTONE RAILWAY 4.3

This split site currently has various types of buildings with the western area primarily housing the Railway Station and part of the eastern site already developed for housing. The existing business which is situated next to the railway station houses a successful training company and should this ever become vacant, we would expect there may be some demand for such a building with its

Page 48: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 35

obvious beneficial transport links. Part of the eastern area of the site has been developed for residential while the existing highway depot appears to be fully utilised. Demand for new build employment space in Penistone is not currently strong and it has not been considered a primary location. Some small scale demand exists given the affluent residential areas however the existing transport network means that this demand will remain small scale. There is a new proposed employment allocation in the area and there are other existing allocations opposite this site. We would expect these sites would be enough to satisfy demand for employment space during this plan period Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space GOOD

Market Attractiveness for new build employment space AVERAGE

Potential Viability of new build employment space POOR

Western Rural UDP Community Area

UDP Ref Site Name Hectarage

WR9/1 THORPE’S HAULAGE PREMISES, HALIFAX ROAD, THURGOLAND

1.4

The site is fully occupied although not substantially utilised. The area is not an established

employment location but does provide one of the only locations for space in the area. New build

attractiveness would be limited although given the scarcity of available sites in this location, it may

be developed by an occupier who wishes to locate to this area. In general however, this demand is

scarce.

Split score –

CRITERIA LEVEL

Market Attractiveness for current employment space AVERAGE

Market Attractiveness for new build employment space POOR

Potential Viability of new build employment space POOR

Page 49: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of
Page 50: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 37

5 SUMMARY OF FINDINGS

EXISTING USE

5.1 In order to review the Employment Policy Areas of the borough, the audit and

categorisation of the sites existing use was essential. A full breakdown of the sites and their

category is included in Appendix A.

5.2 Of the 51 sites which totalled 422 ha, the vast majority (92%/386Ha) were identified as

being occupied by one or more existing trading business. The remaining 8%/36Ha of area

was made of sites with varying characteristics. The breakdown of data is set out below.

Existing Trading Business

Poor quality units in use

Derelict Site

Empty Buildings

Redeveloped or PP for Resi

Not in use/undevelopable

381.1ha 6.9ha 15.1ha 2.3ha 9.9ha 0.5ha

5.3 An assessment of the businesses in occupation has not been carried out as the criteria by

which an occupier is being assessed would need to be established. For example,

comparing a business with a high job count but poor environmental characteristics against

a “cleaner” but lower job count business could prove onerous for a local authority to

undertake and is beyond the scope of this commission.

5.4 A distinction in the quality of the premises has been made which allows an assessment to

be undertaken of the sites suitability for redevelopment for new build employment space.

This is because sites where poor quality accommodation is housed would have a low

existing value for the building and redevelopment may become a realistic option. Buildings

which are of better quality will have an inherent value which may make redevelopment an

unviable alternative.

Existing Trading Business

92%

Poor quality units in use2%

Derelict Site4%

Empty Buildings0%

Redeveloped or PP for Resi2%

Not in use/undevelopable

0%

Page 51: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 38

5.5 The assessment and categorisation of the current use of all the sites provides an essential

audit of the employment policy areas for the borough and feeds into the attractive and

viability aspect of the report.

MARKET ATTRACTIVENESS & VIABLITY

5.6 A sites attractiveness has been assessed on a site by site basis looking at its market

attractiveness in its current state and then an assessment of its potential for new build

employment space.

5.7 By assessing the sites on alternative criteria it is possible to identify a sites potential

assuming it retains its current status and then on the assumption that the current use

terminates and new employment space is created.

5.8 In addition, as requested within the brief, we have assessed the financial viability of a site

assuming new build employment space occurs. This financial viability has been based

upon rental values within the locality and also assumes that no abnormal costs are on each

site. This high level broad brush approach will assist in identifying areas where

redevelopment may be preferred but viability will be an issue to delivery.

5.9 A full schedule is provided with Appendix B. This sets out within each community area, the

grading of each criteria with the GOOD/AVERAGE/POOR rating. The definition of these

ratings has been set out in Section 2.

5.10 Following this full site analysis, we have broken down the sites into three tiers.

TIER 1 - GOOD CURRENT USE & ATTRACTIVE FOR ONGOING EMPLOYMENT USE

TIER 2 - GOOD CURRENT USE. NOT ATTRACTIVE FOR NEW BUILD

TIER 3 - POOR CURRENT USE AND NOT ATTRACTIVE FOR NEW BUILD PREMISES

5.11 Tier 1 sites provide sites and premises which are proving to be attractive in their current

use and have been graded GOOD within this category. In addition to its status, we have

assessed their market attractiveness for new build to be either GOOD or AVERAGE.

Therefore these sites and premises indicate that they are currently well used and should

redevelopment ever take place, we would recommend that they remain in employment use

and they would be attractive to the general market.

5.12 Tier 2 sites provide sites and premises which are proving to be attractive in their current

use and have been graded GOOD within this category. However, when assessing these

sites for their market attractiveness for new build premises, we have graded them as

POOR. A number of sites are currently being used well and provide crucial activities for the

area. However, the occupier may be there for historic reasons and should the site become

available, the general market would not see these sites as employment locations. We

would therefore recommend that if these sites became available, alternative uses may be

worth considering as better alternative employment locations exist in the borough.

5.13 Tier 3 sites have been identified as those which are currently not well utilised and have

therefore been given an AVERAGE/POOR rating. In addition to its current poor use, we

have assessed these sites for market attractiveness for new build premises as being

AVERAGE/POOR. We would therefore suggest that these sites are not providing

significant benefit to the borough and new build potential is very low.

Page 52: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 39

5.14 The tables below set out the separate tiers with a total land area for each. Appendix C

provides a full schedule of sites on each tier together with their current use status.

TIER 1 - GOOD CURRENT USE & ATTRACTIVE FOR ONGOING EMPLOYMENT USE

TIER 2 - GOOD CURRENT USE. NOT ATTRACTIVE FOR NEW BUILD

TIER 3 - POOR CURRENT USE AND NOT ATTRACTIVE FOR NEW BUILD PREMISES

UDP Ref

Site Name Hectarage MARKET

ATTRACTIVENESS

OF CURRENT USE

MARKET

ATTRACTIVENESS OF

NEW BUILD

VIABILITY OF NEW

BUILD

HN4/1 WENTWORTH INDUSTRIAL PARK, TANKERSLEY 49.70 GOOD GOOD GOOD

HN4/2 PLATTS COMMON INDUSTRIAL ESTATE, HOYLAND 14.60 GOOD GOOD GOOD

HN4/4 TINKER LANE 1.83 GOOD GOOD AVERAGE

BA5/1 R.J. MASTERS, METRO TRADING ESTATE 3.80 GOOD GOOD AVERAGE

BA5/2 BARUGH GREEN ROAD 3.00 GOOD GOOD AVERAGE

BA5/3 CLAYCLIFFE INDUSTRIAL ESTATE 33.10 GOOD GOOD AVERAGE

BA5/14 LAITHES LANE / CARLTON ROAD 6.60 GOOD GOOD AVERAGE

BA5/15 CARLTON INDUSTRIAL ESTATE 55.40 GOOD GOOD AVERAGE

BA5/19 WAKEFIELD ROAD / PEEL PLACE 2.30 GOOD GOOD AVERAGE

DT/4/4 BP CHEMICALS, HUDDERSFIELD ROAD, KEXBOROUGH 6.60 GOOD GOOD AVERAGE

DO4/1 FALL BANK INDUSTRIAL ESTATE 13.20 GOOD GOOD AVERAGE

DO4/2 DODWORTH BUSINESS PARK 8.50 GOOD GOOD AVERAGE

DE4/3 GOLDTHORPE INDUSTRIAL ESTATE 16.00 GOOD GOOD AVERAGE

BA5/18 TWIBELL STREET 2.90 GOOD AVERAGE AVERAGE

BA5/20 I.S. MAINTENANCE, WAKEFIELD ROAD 1.10 GOOD AVERAGE AVERAGE

BA39/3/1 HARBOROUGH HILL ROAD/ DRYDEN ROAD 0.90 GOOD AVERAGE AVERAGE

BA5/9 PONTEFRACT ROAD, HOYLE MILL 2.70 GOOD AVERAGE AVERAGE

BA5/10 BARNSLEY MAIN TRANSPORT DEPOT, OAKS LANE 3.90 GOOD AVERAGE AVERAGE

BA5/11 OAKS LANE / GRANGE LANE 14.10 GOOD AVERAGE AVERAGE

BA5/5 CRS DISTRIBUTION DEPOT, BROADWAY 3.90 GOOD AVERAGE AVERAGE

DT/4/1 SHAW CARPETS, BARNSLEY ROAD 7.10 GOOD AVERAGE AVERAGE

DT/4/2 MAPPLEWELL BUSINESS PARK 1.10 GOOD AVERAGE AVERAGE

HN4/3 ROCKINGHAM ROW, BIRDWELL 4.30 GOOD AVERAGE AVERAGE

BA5/12 BLEACHCROFT WAY INDUSTRIAL ESTATE 5.10 GOOD AVERAGE AVERAGE

BA5/16 LYONS BAKERY 22.80 GOOD AVERAGE POOR

BA40/3/1 P.L.M. REDFEARNS MONK BRETTON GLASSWORKS 31.10 GOOD AVERAGE POOR

NE4/2 SHAFTON WORKSHOPS 5.60 GOOD AVERAGE POOR

NE4/4 SANDYBRIDGE LANE INDUSTRIAL UNITS 1.30 GOOD AVERAGE POOR

NE4/6 CARLTON MAIN BRICKWORKS & PULVERITE 3.80 GOOD AVERAGE POOR

DE4/1 LIDGET LANE INDUSTRIAL ESTATE, THURNSCOE 7.10 GOOD AVERAGE POOR

WW5/2 ALDHAM INDUSTRIAL ESTATE, WOMBWELL 6.10 GOOD AVERAGE POOR

WW5/3 STATION ROAD INDUSTRIAL ESTATE, WOMBWELL 14.90 GOOD AVERAGE POOR

PE4/2 LAND AND PREMISES NORTH OF SHEFFIELD ROAD, SPRINGVALE 4.80 GOOD AVERAGE POOR

PE4/6 PENISTONE RAILWAY 4.30 GOOD AVERAGE POOR

SUBTOTAL 363.53

UDP Ref

Site Name Hectarage MARKET

ATTRACTIVENESS

OF CURRENT USE

MARKET

ATTRACTIVENESS OF

NEW BUILD

VIABILITY OF NEW

BUILD

BA40/3/3 SOUTH OF BURTON ROAD, MONK BRETTON 2.00 GOOD POOR POOR

RO4/2 MONCKTON COKE AND CHEMICAL WORKS 17.90 GOOD POOR POOR

NE4/3 SHAFTON BUS GARAGE 0.80 GOOD POOR POOR

PE4/1 DAVID BROWNS ENGINEERING, SPRINGVALE WORKS COMPLEX 10.40 GOOD POOR POOR

PE4/3 LAND AND PREMISES SOUTH OF SHEFFIELD ROAD, SPRINGVALE 3.20 GOOD POOR POOR

PE4/4 DURRAN’S WORKS, THURLSTONE 3.30 GOOD POOR POOR

SUBTOTAL 37.6

UDP Ref

Site Name Hectarage MARKET

ATTRACTIVENESS

OF CURRENT USE

MARKET

ATTRACTIVENESS OF

NEW BUILD

VIABILITY OF NEW

BUILD

BA5/8 WEST STREET, WORSBROUGH 2.70 AVERAGE POOR POOR

NE4/5 ENGINE LANE / HIGH STREET, GRIMETHORPE 0.80 AVERAGE AVERAGE POOR

WR9/1 THORPE’S HAULAGE PREMISES, HALIFAX ROAD, THURGOLAND 1.40 AVERAGE POOR POOR

BA5/17 WEST ROAD / STOCKS LANE 2.70 POOR POOR POOR

BA39/3/2 OAKWELL BREWERY 4.30 POOR AVERAGE AVERAGE

DT/4/3 WILLIAM FREEMANS, WAKEFIELD ROAD, STAINCROSS 3.00 POOR POOR POOR

RO4/1 HIGH STREET 1.00 POOR POOR POOR

RO4/3 BURNS CONSTRUCTION, MIDLAND ROAD 0.50 POOR POOR POOR

DE4/2 THURNSCOE WORKSHOPS, LIDGET LANE, THURNSCOE 1.10 POOR POOR POOR

DE4/4 LAND SOUTH OF BEEVER STREET, GOLDTHORPE 1.60 POOR POOR POOR

WW5/6 INGS ROAD DEPOT, LOW VALLEY 1.70 POOR POOR POOR

SUBTOTAL 20.80

Page 53: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Final Report | June 2013 40

5.15 We would therefore recommend that sites within Tier 3 are examined in greater detail in

order to establish what further steps could be undertaken in order to bring them to

beneficial use for the borough.

5.16 During the assessment, we have also identified a number of sites where the maps

indicating the currently employment use are inaccurate. This has been as a result of further

employment space being developed or alternative uses being developed on part of the

areas. We would therefore recommend that employment space maps are redrawn to

incorporate the actual employment area in order to provide the correct area of land within

the borough.

Page 54: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

APPENDIX A

Existing Use Status Schedule

Page 55: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Appendix A - Existing Use Status Schedule

UDP Employment Policy Areas

Barnsley Urban UDP Community Area

UDP Ref

Site Name Hectarage Existing Trading

Business

Poor quality

units in use Derelict Site Empty Buildings

Redeveloped or

PP for Resi

Not in

use/undevelopable TOTAL

BA5/1 R.J. MASTERS, METRO TRADING ESTATE 3.8 3.80 3.8

BA5/2 BARUGH GREEN ROAD 3 2.00 1.0 3

BA5/3 CLAYCLIFFE INDUSTRIAL ESTATE 33.1 33.10 33.1

BA5/5 CRS DISTRIBUTION DEPOT, BROADWAY 3.9 3.90 3.9

BA5/8 WEST STREET, WORSBROUGH 2.7 1.00 1.7 2.7

BA5/9 PONTEFRACT ROAD, HOYLE MILL 2.7 2.00 0.7 2.7

BA5/10 BARNSLEY MAIN TRANSPORT DEPOT, OAKS LANE 3.9 3.90 3.9

BA5/11 OAKS LANE / GRANGE LANE 14.1 10.90 3.2 14.1

BA5/12 BLEACHCROFT WAY INDUSTRIAL ESTATE 5.1 5.10 5.1

BA5/14 LAITHES LANE / CARLTON ROAD 6.6 6.60 6.6

BA5/15 CARLTON INDUSTRIAL ESTATE 55.4 55.40 55.4

BA5/16 LYONS BAKERY 22.8 22.80 22.8

BA5/17 WEST ROAD / STOCKS LANE 2.7 0.30 1.2 1.2 2.7

BA5/18 TWIBELL STREET 2.9 2.90 2.9

BA5/19 WAKEFIELD ROAD / PEEL PLACE 2.3 2.30 2.3

BA5/20 I.S. MAINTENANCE, WAKEFIELD ROAD 1.1 1.10 1.1

BA39/3/1 HARBOROUGH HILL ROAD/ DRYDEN ROAD 0.9 0.60 0.3 0.9

BA39/3/2 OAKWELL BREWERY 4.3 2.0 2.3 4.3

BA40/3/1 P.L.M. REDFEARNS MONK BRETTON GLASSWORKS 31.1 31.10 31.1

BA40/3/3 SOUTH OF BURTON ROAD, MONK BRETTON 2 2 2

Darton UDP Community Area

UDP Ref Site Name Hectarage

DT/4/1 SHAW CARPETS, BARNSLEY ROAD 7.1 7.1 7.1

DT/4/2 MAPPLEWELL BUSINESS PARK 1.1 1.1 1.1

DT/4/3 WILLIAM FREEMANS, WAKEFIELD ROAD, STAINCROSS 3 1.5 1.5 3

DT/4/4 BP CHEMICALS, HUDDERSFIELD ROAD, KEXBOROUGH 6.6 6.6 6.6

Dodworth UDP Community Area

UDP Ref Site Name Hectarage

DO4/1 FALL BANK INDUSTRIAL ESTATE 13.2 13.2 13.2

DO4/2 DODWORTH BUSINESS PARK 8.5 8.5 8.5

Royston UDP Community Area

UDP Ref Site Name Hectarage

RO4/1 HIGH STREET 1 1 1

RO4/2 MONCKTON COKE AND CHEMICAL WORKS 17.9 17.9 17.9

RO4/3 BURNS CONSTRUCTION, MIDLAND ROAD 0.5 0.5 0.5

North East Towns UDP Community Area

UDP Ref Site Name Hectarage

NE4/2 SHAFTON WORKSHOPS 5.6 5.6 5.6

NE4/3 SHAFTON BUS GARAGE 0.8 0.8 0.8

NE4/4 SANDYBRIDGE LANE INDUSTRIAL UNITS 1.3 1.3 1.3

NE4/5 ENGINE LANE / HIGH STREET, GRIMETHORPE 0.8 0.8 0.8

NE4/6 CARLTON MAIN BRICKWORKS & PULVERITE 3.8 3.8 3.8

Page 56: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

Appendix A - Existing Use Status Schedule

UDP Ref

Site Name Hectarage Existing Trading

Business

Poor quality

units in use Derelict Site Empty Buildings

Redeveloped or

PP for Resi

Not in

use/undevelopable TOTAL

Dearne UDP Community Area

UDP Ref Site Name Hectarage

DE4/1 LIDGET LANE INDUSTRIAL ESTATE, THURNSCOE 7.1 7.1 7.1

DE4/2 THURNSCOE WORKSHOPS, LIDGET LANE, THURNSCOE 1.1 0.7 0.4 1.1

DE4/3 GOLDTHORPE INDUSTRIAL ESTATE 16 16 16

DE4/4 LAND SOUTH OF BEEVER STREET, GOLDTHORPE 1.6 1.6 1.6

Wombwell UDP Community Area

UDP Ref Site Name Hectarage

WW5/2 ALDHAM INDUSTRIAL ESTATE, WOMBWELL 6.1 6.1 6.1

WW5/3 STATION ROAD INDUSTRIAL ESTATE, WOMBWELL 14.9 12.4 2.5 14.9

WW5/6 INGS ROAD DEPOT, LOW VALLEY 1.7 1.7 1.7

Hoyland UDP Community Area

UDP Ref Site Name Hectarage

HN4/1 WENTWORTH INDUSTRIAL PARK, TANKERSLEY 49.7 48 1.7 49.7

HN4/2 PLATTS COMMON INDUSTRIAL ESTATE, HOYLAND 14.6 14.6 14.6

HN4/3 ROCKINGHAM ROW, BIRDWELL 4.3 4.3 4.3

HN4/4 TINKER LANE 1.83 1.83 1.83

Penistone UDP Community Area

UDP Ref Site Name Hectarage

PE4/1 DAVID BROWNS ENGINEERING, SPRINGVALE WORKS COMPLEX 10.4 3 7.4 10.4

PE4/2 LAND AND PREMISES NORTH OF SHEFFIELD ROAD, SPRINGVALE 4.8 4 0.8 4.8

PE4/3 LAND AND PREMISES SOUTH OF SHEFFIELD ROAD, SPRINGVALE 3.2 3.2 3.2

PE4/4 DURRAN’S WORKS, THURLSTONE 3.3 3.3 3.3

PE4/6 PENISTONE RAILWAY 4.3 3.3 1 4.3

Western Rural UDP Community Area

UDP Ref Site Name Hectarage

WR9/1 THORPE’S HAULAGE PREMISES, HALIFAX ROAD, THURGOLAND 1.4 1.4 1.4

Total 421.93 386.23 6.9 15.1 2.3 10.9 0.5 421.93

91.5% 1.6% 3.6% 0.5% 2.6% 0.1% 100%

Page 57: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of
Page 58: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

APPENDIX B

Market Attractiveness & Viability Schedule

Page 59: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of
Page 60: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

APPENDIX B Market Attractiveness & Viability Schedule

Barnsley Urban UDP Community Area

UDP Ref

Site Name Hectarage MARKET

ATTRACTIVENESS

OF CURRENT USE

MARKET

ATTRACTIVENESS

OF NEW BUILD

VIABILITY OF

NEW BUILD

BA5/1 R.J. MASTERS, METRO TRADING ESTATE 3.8 GOOD GOOD GOOD

BA5/2 BARUGH GREEN ROAD 3 GOOD GOOD GOOD

BA5/3 CLAYCLIFFE INDUSTRIAL ESTATE 33.1 GOOD GOOD GOOD

BA5/5 CRS DISTRIBUTION DEPOT, BROADWAY 3.9 GOOD AVERAGE AVERAGE

BA5/8 WEST STREET, WORSBROUGH 2.7 AVERAGE POOR POOR

BA5/9 PONTEFRACT ROAD, HOYLE MILL 2.7 GOOD AVERAGE AVERAGE

BA5/10 BARNSLEY MAIN TRANSPORT DEPOT, OAKS LANE 3.9 GOOD AVERAGE AVERAGE

BA5/11 OAKS LANE / GRANGE LANE 14.1 GOOD AVERAGE AVERAGE

BA5/12 BLEACHCROFT WAY INDUSTRIAL ESTATE 5.1 GOOD AVERAGE AVERAGE

BA5/14 LAITHES LANE / CARLTON ROAD 6.6 GOOD GOOD AVERAGE

BA5/15 CARLTON INDUSTRIAL ESTATE 55.4 GOOD GOOD AVERAGE

BA5/16 LYONS BAKERY 22.8 GOOD AVERAGE POOR

BA5/17 WEST ROAD / STOCKS LANE 2.7 POOR POOR POOR

BA5/18 TWIBELL STREET 2.9 GOOD AVERAGE AVERAGE

BA5/19 WAKEFIELD ROAD / PEEL PLACE 2.3 GOOD GOOD AVERAGE

BA5/20 I.S. MAINTENANCE, WAKEFIELD ROAD 1.1 GOOD AVERAGE AVERAGE

BA39/3/1 HARBOROUGH HILL ROAD/ DRYDEN ROAD 0.9 GOOD AVERAGE AVERAGE

BA39/3/2 OAKWELL BREWERY 4.3 POOR AVERAGE AVERAGE

BA40/3/1 P.L.M. REDFEARNS MONK BRETTON GLASSWORKS 31.1 GOOD AVERAGE POOR

BA40/3/3 SOUTH OF BURTON ROAD, MONK BRETTON 2 GOOD POOR POOR

Darton UDP Community Area

UDP Ref Site Name Hectarage

DT/4/1 SHAW CARPETS, BARNSLEY ROAD 7.1 GOOD AVERAGE AVERAGE

DT/4/2 MAPPLEWELL BUSINESS PARK 1.1 GOOD AVERAGE AVERAGE

DT/4/3 WILLIAM FREEMANS, WAKEFIELD ROAD, STAINCROSS 3 POOR POOR POOR

DT/4/4 BP CHEMICALS, HUDDERSFIELD ROAD, KEXBOROUGH 6.6 GOOD GOOD AVERAGE

Dodworth UDP Community Area

UDP Ref Site Name Hectarage

DO4/1 FALL BANK INDUSTRIAL ESTATE 13.2 GOOD GOOD AVERAGE

DO4/2 DODWORTH BUSINESS PARK 8.5 GOOD GOOD AVERAGE

Royston UDP Community Area

UDP Ref Site Name Hectarage

RO4/1 HIGH STREET 1 POOR POOR POOR

RO4/2 MONCKTON COKE AND CHEMICAL WORKS 17.9 GOOD POOR POOR

RO4/3 BURNS CONSTRUCTION, MIDLAND ROAD 0.5 POOR POOR POOR

Page 61: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

APPENDIX B Market Attractiveness & Viability Schedule

UDP Ref

Site Name Hectarage MARKET

ATTRACTIVENESS

OF CURRENT USE

MARKET

ATTRACTIVENESS

OF NEW BUILD

VIABILITY OF

NEW BUILDNorth East Towns UDP Community Area

UDP Ref Site Name Hectarage

NE4/2 SHAFTON WORKSHOPS 5.6 GOOD AVERAGE POOR

NE4/3 SHAFTON BUS GARAGE 0.8 GOOD POOR POOR

NE4/4 SANDYBRIDGE LANE INDUSTRIAL UNITS 1.3 GOOD AVERAGE POOR

NE4/5 ENGINE LANE / HIGH STREET, GRIMETHORPE 0.8 AVERAGE AVERAGE POOR

NE4/6 CARLTON MAIN BRICKWORKS & PULVERITE 3.8 GOOD AVERAGE POOR

Dearne UDP Community Area

UDP Ref Site Name Hectarage

DE4/1 LIDGET LANE INDUSTRIAL ESTATE, THURNSCOE 7.1 GOOD AVERAGE POOR

DE4/2 THURNSCOE WORKSHOPS, LIDGET LANE, THURNSCOE 1.1 POOR POOR POOR

DE4/3 GOLDTHORPE INDUSTRIAL ESTATE 16 GOOD GOOD AVERAGE

DE4/4 LAND SOUTH OF BEEVER STREET, GOLDTHORPE 1.6 POOR POOR POOR

Wombwell UDP Community Area

UDP Ref Site Name Hectarage

WW5/2 ALDHAM INDUSTRIAL ESTATE, WOMBWELL 6.1 GOOD AVERAGE POOR

WW5/3 STATION ROAD INDUSTRIAL ESTATE, WOMBWELL 14.9 GOOD AVERAGE POOR

WW5/6 INGS ROAD DEPOT, LOW VALLEY 1.7 POOR POOR POOR

Hoyland UDP Community Area

UDP Ref Site Name Hectarage

HN4/1 WENTWORTH INDUSTRIAL PARK, TANKERSLEY 49.7 GOOD GOOD GOOD

HN4/2 PLATTS COMMON INDUSTRIAL ESTATE, HOYLAND 14.6 GOOD GOOD GOOD

HN4/3 ROCKINGHAM ROW, BIRDWELL 4.3 GOOD AVERAGE AVERAGE

HN4/4 TINKER LANE 1.83 GOOD AVERAGE AVERAGE

Penistone UDP Community Area

UDP Ref Site Name Hectarage

PE4/1 DAVID BROWNS ENGINEERING, SPRINGVALE WORKS COMPLEX 10.4 GOOD POOR POOR

PE4/2 LAND AND PREMISES NORTH OF SHEFFIELD ROAD, SPRINGVALE 4.8 GOOD AVERAGE POOR

PE4/3 LAND AND PREMISES SOUTH OF SHEFFIELD ROAD, SPRINGVALE 3.2 GOOD POOR POOR

PE4/4 DURRAN’S WORKS, THURLSTONE 3.3 GOOD POOR POOR

PE4/6 PENISTONE RAILWAY 4.3 GOOD AVERAGE POOR

Western Rural UDP Community Area

UDP Ref Site Name Hectarage

WR9/1 THORPE’S HAULAGE PREMISES, HALIFAX ROAD, THURGOLAND 1.4 AVERAGE POOR POOR

Page 62: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

APPENDIX C

Separate Tier with Existing Use Status Schedule

Page 63: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

APPENDIX C Separate Tier with Existing Use Status Schedule

UDP Ref

Site Name Hectarage MARKET

ATTRACTIVENESS

OF CURRENT USE

MARKET

ATTRACTIVENESS OF

NEW BUILD

VIABILITY OF NEW

BUILD CURRENT USE

HN4/1 WENTWORTH INDUSTRIAL PARK, TANKERSLEY 49.70 GOOD GOOD GOOD EXISTING BUSINESS/PART RESI LAND

HN4/2 PLATTS COMMON INDUSTRIAL ESTATE, HOYLAND 14.60 GOOD GOOD GOOD EXISTING BUSINESS

HN4/4 TINKER LANE 1.83 GOOD GOOD AVERAGE EXISTING BUSINESS

BA5/1 R.J. MASTERS, METRO TRADING ESTATE 3.80 GOOD GOOD AVERAGE EXISTING BUSINESS

BA5/2 BARUGH GREEN ROAD 3.00 GOOD GOOD AVERAGE EXISTING BUSINESS/DERELICT LAND

BA5/3 CLAYCLIFFE INDUSTRIAL ESTATE 33.10 GOOD GOOD AVERAGE EXISTING BUSINESS

BA5/14 LAITHES LANE / CARLTON ROAD 6.60 GOOD GOOD AVERAGE EXISTING BUSINESS

BA5/15 CARLTON INDUSTRIAL ESTATE 55.40 GOOD GOOD AVERAGE EXISTING BUSINESS

BA5/19 WAKEFIELD ROAD / PEEL PLACE 2.30 GOOD GOOD AVERAGE EXISTING BUSINESS

DT/4/4 BP CHEMICALS, HUDDERSFIELD ROAD, KEXBOROUGH 6.60 GOOD GOOD AVERAGE EXISTING BUSINESS

DO4/1 FALL BANK INDUSTRIAL ESTATE 13.20 GOOD GOOD AVERAGE EXISTING BUSINESS

DO4/2 DODWORTH BUSINESS PARK 8.50 GOOD GOOD AVERAGE EXISTING BUSINESS

DE4/3 GOLDTHORPE INDUSTRIAL ESTATE 16.00 GOOD GOOD AVERAGE EXISTING BUSINESS

BA5/18 TWIBELL STREET 2.90 GOOD AVERAGE AVERAGE EXISTING BUSINESS

BA5/20 I.S. MAINTENANCE, WAKEFIELD ROAD 1.10 GOOD AVERAGE AVERAGE EXISTING BUSINESS

BA39/3/1 HARBOROUGH HILL ROAD/ DRYDEN ROAD 0.90 GOOD AVERAGE AVERAGE EXISTING BUSINESS/DERELICT LAND

BA5/9 PONTEFRACT ROAD, HOYLE MILL 2.70 GOOD AVERAGE AVERAGE EXISTING BUSINESS/DERELICT LAND

BA5/10 BARNSLEY MAIN TRANSPORT DEPOT, OAKS LANE 3.90 GOOD AVERAGE AVERAGE EXISTING BUSINESS

BA5/11 OAKS LANE / GRANGE LANE 14.10 GOOD AVERAGE AVERAGE EXISTING BUSINESS/DERELICT LAND

BA5/5 CRS DISTRIBUTION DEPOT, BROADWAY 3.90 GOOD AVERAGE AVERAGE EXISTING BUSINESS

DT/4/1 SHAW CARPETS, BARNSLEY ROAD 7.10 GOOD AVERAGE AVERAGE EXISTING BUSINESS

DT/4/2 MAPPLEWELL BUSINESS PARK 1.10 GOOD AVERAGE AVERAGE EXISTING BUSINESS

HN4/3 ROCKINGHAM ROW, BIRDWELL 4.30 GOOD AVERAGE AVERAGE EXISTING BUSINESS

BA5/12 BLEACHCROFT WAY INDUSTRIAL ESTATE 5.10 GOOD AVERAGE AVERAGE EXISTING BUSINESS

BA5/16 LYONS BAKERY 22.80 GOOD AVERAGE POOR EXISTING BUSINESS

BA40/3/1 P.L.M. REDFEARNS MONK BRETTON GLASSWORKS 31.10 GOOD AVERAGE POOR EXISTING BUSINESS

NE4/2 SHAFTON WORKSHOPS 5.60 GOOD AVERAGE POOR EXISTING BUSINESS

NE4/4 SANDYBRIDGE LANE INDUSTRIAL UNITS 1.30 GOOD AVERAGE POOR EXISTING BUSINESS

NE4/6 CARLTON MAIN BRICKWORKS & PULVERITE 3.80 GOOD AVERAGE POOR EXISTING BUSINESS

DE4/1 LIDGET LANE INDUSTRIAL ESTATE, THURNSCOE 7.10 GOOD AVERAGE POOR EXISTING BUSINESS

WW5/2 ALDHAM INDUSTRIAL ESTATE, WOMBWELL 6.10 GOOD AVERAGE POOR EXISTING BUSINESS

WW5/3 STATION ROAD INDUSTRIAL ESTATE, WOMBWELL 14.90 GOOD AVERAGE POOR EXISTING BUSINESS

PE4/2 LAND AND PREMISES NORTH OF SHEFFIELD ROAD, SPRINGVALE 4.80 GOOD AVERAGE POOR EXISTING BUSINESS/PART RESI LAND

PE4/6 PENISTONE RAILWAY 4.30 GOOD AVERAGE POOR EXISTING BUSINESS/PART RESI LAND

SUBTOTAL 363.53

TIER 1 - GOOD CURRENT USE AND ATTRACTIVE FOR ONGOING EMPLOYMENT USE

Page 64: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

APPENDIX C Separate Tier with Existing Use Status Schedule

UDP Ref

Site Name Hectarage MARKET

ATTRACTIVENESS

OF CURRENT USE

MARKET

ATTRACTIVENESS OF

NEW BUILD

VIABILITY OF NEW

BUILD CURRENT USE

BA40/3/3 SOUTH OF BURTON ROAD, MONK BRETTON 2.00 GOOD POOR POOR POOR QUALITY BUILDINGS

RO4/2 MONCKTON COKE AND CHEMICAL WORKS 17.90 GOOD POOR POOR EXISTING BUSINESS

NE4/3 SHAFTON BUS GARAGE 0.80 GOOD POOR POOR EXISTING BUSINESS

PE4/1 DAVID BROWNS ENGINEERING, SPRINGVALE WORKS COMPLEX 10.40 GOOD POOR POOR EXISTING BUSINESS/PART RESI LAND

PE4/3 LAND AND PREMISES SOUTH OF SHEFFIELD ROAD, SPRINGVALE 3.20 GOOD POOR POOR EXISTING BUSINESS

PE4/4 DURRAN’S WORKS, THURLSTONE 3.30 GOOD POOR POOR EXISTING BUSINESS

SUBTOTAL 37.6

TIER 2 - GOOD CURRENT USE. NOT ATTRACTIVE FOR NEW BUILD

UDP Ref

Site Name Hectarage MARKET

ATTRACTIVENESS

OF CURRENT USE

MARKET

ATTRACTIVENESS OF

NEW BUILD

VIABILITY OF NEW

BUILD CURRENT USE

BA5/8 WEST STREET, WORSBROUGH 2.70 AVERAGE POOR POOR EXISTING BUSINESS/POOR QUALITY UNITS

NE4/5 ENGINE LANE / HIGH STREET, GRIMETHORPE 0.80 AVERAGE AVERAGE POOR EXISTING BUSINESS

WR9/1 THORPE’S HAULAGE PREMISES, HALIFAX ROAD, THURGOLAND 1.40 AVERAGE POOR POOR EXISTING BUSINESS

BA5/17 WEST ROAD / STOCKS LANE 2.70 POOR POOR POOR EXISTING BUSINESS/POOR QUALITY UNITS/DERELICT LAND

BA39/3/2 OAKWELL BREWERY 4.30 POOR AVERAGE AVERAGE DERELICT SITE/EMPTY BUILDINGS

DT/4/3 WILLIAM FREEMANS, WAKEFIELD ROAD, STAINCROSS 3.00 POOR POOR POOR EXISTING BUSINESS/DERELICT LAND

RO4/1 HIGH STREET 1.00 POOR POOR POOR DERELICT SITE

RO4/3 BURNS CONSTRUCTION, MIDLAND ROAD 0.50 POOR POOR POOR UNDEVELOPABLE LAND

DE4/2 THURNSCOE WORKSHOPS, LIDGET LANE, THURNSCOE 1.10 POOR POOR POOR EXISTING BUSINESS/POOR QUALITY UNITS

DE4/4 LAND SOUTH OF BEEVER STREET, GOLDTHORPE 1.60 POOR POOR POOR POOR QUALITY UNITS

WW5/6 INGS ROAD DEPOT, LOW VALLEY 1.70 POOR POOR POOR EMPTY BUILDINGS

SUBTOTAL 20.80

TIER 3 - POOR CURRENT USE AND NOT ATTRACTIVE FOR NEW BUILD PREMISES

Page 65: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Barnsley Metropolitan Borough Council Review of Employment Policy Areas

APPENDIX D

Site Plans

Page 66: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

DRYDEN ROADMEADOW STREET

Firth

Stre

et

HAR

BOR

OU

GH

HIL

L R

OAD

2

9

1

El Sub Sta

8

9

5

Garage

58

54 to

The Old Bakery

1 to 4

109c107

52

9

109

1

109a

29

109b

24

12

6

12

2

17

10

22

1

15

95

105

83

51

4

El

Harborough Hill

AllotmentGardens

Track

Sub Sta

Depot

Red

fear

n St

reet

BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1BA5/39/3/1

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 67: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

ROAD

PONTEFRACT

OAKWELL VIEW

TrackBEEV

OR

COUR

T

Riding School

El Sub Sta

El Sub Sta

Warehouse

81

79

Works

FB

Brewery

Business Centre

1 to 29

1 to 3

8

& Youth Enterprise

Centre

El Sub Sta

Oakwell House

Council Office

McGuiness Works

El Sub Sta

Mount Osborne Industrial Park

Oakwell Business

Mount Osborne

Beevor Bridge

Industrial Estate

Track

L Twr

Tank

WB

Chy

El Sub Sta

El Sub Sta

Path

Path (um)Pa

th (u

m)

Path

nd

60.7m

58.7m

63.6m

55.6m

65.2m

69.3m

BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2BA5/39/3/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 68: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

PAR

KLAN

D VI

EW

WEST GREEN AVENUE

KINGWOOD CLOSE

ESHLANDS B

HO

PE S TR

EE

T

CH

ARI TY

STR

EET

NETTLE

CR

OFT

FAIT

H S

TRE

ET

MO

NK TERRACE

BRO

MCL

IFFE

PAR

K

BURTON ROAD

DAYCROFT

LOW

FOLD

S

LANE

FIELDFAR

CLOSE

FISH

DA

M L

AN

E

CARR STREET

KING EDWARD STREET

BURTON CRESCENT

BENTLEY

PINEHALL DRIVE

HEYSH

AMGR

EE N

HEYSHAM GREEN

HEYSHAM GREEN

FISH

DA

M LA

NE

FORMBY COURTFISH DAM

LANE

M LANE

WEST GREEN WAY

FAR

FIEL

D LA

NE

WEST GREEN WAY

16

74

62

Works

8

10

11 1

25

1

1

2

23

19

2

14

25

15

11

19

20

1

17

7

Unit E

80

PH

321b

307

43

El Sub Sta

48

56

22

74

66

80

88

522

512

35

2

38 to

60

1 to 25

1

25 29

1115

504

502

12

480

7

2

490

20

17

28

14

20

1115

36

112

25

16

1

10

15

18

121

4

6

2

33

37

337

Works

Works

470

3

8

Sub Sta

El

13

Sub Sta

48

444

El

446

448

458

5

19

432

327

442

13

335

323

Unit F

321a

78

96

47

9

10

36

8

1

51

26

2

317

418

14

426

321

309

70

58

49

61

74

76

El

132

116

Tank

150

114

108

104

390

412

406

1

404

45

2

283

33

295

279

Shelter

14

19

4

13

29

3

90

34

26

1

14

16

60

68

4

58

2

37

11

Westwood

27

15

48

2

35

78

88

25

68

48

59

7

71

73

8

1

2

52

70

43

58

46

33

71

82

55

69

158

170

92

1

11

Drain

Issues

Issues

Allotment Gardens

Path (um)

Sinks

Sinks

Water

Trac

k

Dra

in

LB

WB

Drain

Pipe Line

Dr ain

MP 176

Dra

in

FB

FB

Conv

eyor

Hopper

Water

Mine

ral R

ailwa

y

Water

Hopper

WB

Drain

Path

Path

Tanks

Min

eral

Rai

lway

Conv

eyor

Chy

Conveyor

El Sub Sta

Hopper

Chy

Tank

Conveyor

Conveyor

Chy

ConveyorEl Sub Sta

Chy

Conveyor

Hoppers

Tanks

Conveyors

El S

ub S

t as

Hopper

Gas Governor

TCB

Conveyors

Path

Chy

Chy

Sub Sta

Chy

Chy

Tanks

Sinks

El Sub Sta

Mast

Burton Road Business Park

Conv

eyor

Path

Conv

eyor

LB

45.6m

47.7m

49.2m

55.3m

64.5m

72.5m

69.2m

67.4m

64.6m

62.2m

60.4m

58.2m

69.5m

64.7m

68.0m

71.6m

70.7m

70.1m

68.0m

64.7m

BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1BA5/40/3/1

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 69: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

MO

NK TERRACE

BROM

CLIF

FE P

ARK

BURTON ROAD

PH

254

6

2

33

37

337

Works

Works

470

3

8

Sub Sta

El

13

448

458

Drain

Drain

Conv

eyor

Hopper

ter

Hopper

WB

Drain

Path

Tanks

Min

eral

Rai

lway

Con

veyo

r

Chy

Conveyor

Hopper

Chy

Conveyor

yorEl Sub Sta

Conveyor

Conv

eyor

Path

Con

veyo

r

49.2m

55.3m

62.2m

60.4m

58.2m

BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3BA5/40/3/3

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 70: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

FOUR LANDS CLO

SE

MEDINA WAY

ANNAN CLOSE

DEEPDALE CROFT

BARUGH LANE

EDEN CLOSE

THE CROFT

LANGDALE ROAD

TAV

Y

NETHERCROFT

NORW

OO

D DR

IVE

CLO

SE

ELS

TEA

D

NETHERCROFT

MIDHURST

CLO

SE

CLOSE

GROVE

Nookings

Farm

35 to

38

Claycliffe Business Park

43 to

50

39 to 42a

9

22

37

43

12

7

15

21

26

11

28

49

10

1

26

62

3

16

13

17

15

6

25

21

38

34

28

8

14

59

63

21

40

42

22

6

9

7

50

16

2

11

22

52

7

l5Oa 154

154a

Metro Trading Centre

33

15

48

21

50

58

11

37

43

73

35

46

1

146144

524

152

l48a

179

150148

185 187

87

14

272

4

62

29

7

30

9

28

17

15

35

20

11

32

1

5

29

3

15

136134

11

177B

177

36

177a

167

25

26

15

36

22

1

10

1

1

2

26

20

12

18

8

157

Playground

ETL

Recreation Ground

Barugh Green

85.4m

80.0m

BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1BA5/1

Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

WAY

CANNON

ANNAN CLOSE

DEEPDALE CROFT

DOVEBUSH WAY

Claycliffe Business Park

51 to

53

43 to

50

29 to

31

4

2

9

7

6

7a

14

1

14

27

2

6

1

1511

6

A 635

MILN

E STREET

CLOSELONGLEY

THE

MEA

DO

WS

BARUGH GREEN ROAD

166

122

148

154

156

116

211

0

11

84

3840

2

11

19

32

1

1

1

12

22

6

2

3

155

11a11

37

4252

80

17

41

32 to

34

62 102

9058

PO

42

101

107

PH

MSDrain

Barugh Green

Playground

GdnsAllot

El Sub Sta

TCB

91.2m

95.2m

97.1m

BARNSLEY MBC - Strategy Growth & RegenerationScale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

Assistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

CANNON

220

21 to 25

Scale 1: _ _ _ _ _ _ _ _ _$

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Page 71: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

CLAYC

LIFFE AVENU

E

A 637

A 635

A 637

BARUGH GREEN ROAD

342

240

Shelter

246

El Sub Sta

348

330

Chestnut Tree (PH)

ESS

Garage

to

18 to 20

15 to 17

26

28

8

Works

Industrial Estate

1

(Redbrook)2

15 11

3

4

Drain

Drain

80.6m

79.9m

80.7m

79.8m

74.2m

BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2BA5/2

BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

WHALEY ROAD

356

Garage

LB

BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3

CLAYC

LIFFE AVENU

E

MAWFIELD ROAD

71

2024

24

1016

20

31

35

25

14

31

16

1719

9

The Bungalow

10

BARNSLEY MBC - Strategy Growth & RegenerationScale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

Assistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

ST THOMAS'S ROAD

MAWFIELD ROAD

CLAYCLIFFE AVENUE

25

21

6

2628

15

823

Scale 1: _ _ _ _ _ _ _ _ _$

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Page 72: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

SWALLOW HILL ROAD

WHALEY ROAD

CLAYC

LIFFE AVENU

E

A 637

A 635

A 637

WHALEY ROAD

ROYAL

WAY

CANNON

BARN

SLEY RO

AD

COURT

BARNSLEY ROAD

FOUR LANDS CLO

SE

A 635

A 637

REDHILL COURT

ROOKDALE CLOSE

WE

STB

UR

Y C

LOS

E

WILTHORPE ROAD

MAWFIELD ROAD

BARUGH GREEN ROAD

CLAYCLIFFE AVENUE

LEYLAND WALK

WIL

THO

RPE

LAN

E

ALFORD CLOSE

WILTHORPE ROAD

GR

EAT BRO

AD IN

G

DAYHOUSE COURT

CHALBURY CLOSE

DAYH

OU

SE LANE

(Track)

DAYH

OUS

E W

AY

DEARNE HALL ROAD

B 6428

DEARNE HALL ROAD

SPARK LANE

BARUGH GREEN ROAD

WHALEY ROAD

CLAYCLIFFE

ROAD

MEDINA WAY

CLOSE

KELBY CROFT

ANNAN CLOSE

DEEPDALE CROFT

DOVEBU

SH W

AY

MEDWAY

B 6428

HALLROAD

HALL

DEAR

NE

DEARNE

FOLD

EDEN CLOSE

THE CROFT

LANGDALE ROAD

TAV

Y

NORW

OO

D DR

IVE

B 64

28

CLO

SE

MILN

E STREET

CLOSELONGLEY

THE

MEA

DO

WS

NETHERCROFT

GROVE

AVEN

UE

LON

GLEY STR

EET

JOH

N'S

ST

Network Centre

N

M

L

El Sub Sta

Zenith Park

Shelter

El Sub Sta

Nookings

Farm

El Sub Sta

Chestnut Tree (PH)

ESS

The Bungalow

WorksESS

Garage

(PH)Millers Inn

Claycliffe Business Park

Royal Hotel

Works

South Yorkshire

Industrial Estate

(Redbrook)

Barugh House Farm

Garage

(PH)

Shelter

Church

(PH)

Crown and

Anchor

Metro Trading Centre

Sluice

Pond

Drain

Business Park

Redbrook

Redbrook

Trac

k

ETL

MP 51

MP 51

Slurry Ponds

River Dearne

Foot Bridge

Sewage Works

Foot Bridge

ETL

ETL

Pond

Tanks

Track

MP.75

Hopper

ETL

MP.75

Redbrook

Wood

Day House

ETL

ETL

Drain

Canal

Drain

(disused)

El Sub Sta

El Sub Sta

Stone

Drain

MP.5

MP.5

ETL

Low Barugh

Tk

Tanks

MS

Drain

Drain

Drain

Travelling Crane

WB

Playground

Stone Stone

ETL

ETL

LB

TCB

Sub StaEl

ETL

Barugh

WeirETL

ETL

Pond

Barugh Green

El Sub Sta

TCB

Track

Cawthorne

Dike

51.5m

51.8m

80.6m

79.9m

80.7m

63.3m

55.3m

71.8m

55.9m

70.3m

96.8m

60.1m

79.8m

91.2m

74.2m

95.2m

74.1m

68.5m

85.4m

72.7m

80.0m

75.0m

BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3BA5/3

Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

ROOKDALE CLOSE

El

Sub Sta

El Ps

(disused)

Track

Path (um)

Canal

HERMIT LANE

ST THOMAS'S ROAD

HERMITLANE

REDBROOK

WILSD

EN G

RO

VE

LANE(T

rack

)

ROW

AN DRIVE

WILTHORPE

LANE

INTA

KE

REDBROOK ROAD

HIGHAM COURT

GRAMPIAN CLOSE

COTSWOLD CLOSE

WAY

HAMBLETO

N

CLOSE

MENDIP CLOSE

PENNINE

DOWNES CRESCENT

RIPLEY G

RO

VE

CLO

SE

STANBU

RY C

LOSE

STAI

NLE

Y

SAM

UEL

SQ

UAR

E

CHURCH STREET

HILL TO

P LANE

LIMESAVEN

UE

TRE

ELAN

DS

ROAD

LITTLE

NEW C

LOSE

BAR

DEN

DR

IVE

OAKWORTH CLOSE

RAVENSHAWCLOSE

INTAKE

DOWNES CRESCENT

WH

ARFE

DAL

E

LANE

RO

AD

COLSTER CLOSE

RAINTON

WE

STB

UR

Y C

LOS

E

CLOSE

GROVE

REDCLIFFE

REDTHORPE CREST

RISE

WILBRO

OK

BEEV

ER L

ANE

WO

OD

VIE

W LA

NE

REDBROOKROAD

BEEVER CLOSE

WOOD CLOSE

RO

AD

CHURCH STREET

WH

ARFED

ALE

VELVETWO

OD

CLO

SE

CRAVEN

COMM

ON ROAD

HIGHAM

WEL

LAN

DC

OU

RT

TAMAR CLOSE

WEAVER CLOSE

WAV

ENEY

DR

IVE

AVON CLO

SE

Hermit Inn

(PH)

Shelter

Hermit House

FarmHigham Methodist

Church

Redbrook

Gawber

Gawber

Craven

Woo

d

(um)

Pond

Path

Drain

Path (um)

Path (um)

Playing Field

LB

Higham

El Sub Sta

113.5m

132.9m

143.0m

105.9m

145.1m

143.7m

143.6m

BARNSLEY MBC - Strategy Growth & RegenerationScale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

Assistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

VERNON

LIMESW

AY

LIMESW

AY

SAMUEL ROAD

VAUGHAN ROAD

NORTH PLACE

HA

RR

Y R

OA

D

VERN

ON

WAY

SOUTH PLACE

GRAMPIAN CLOSE

WADDINGTON ROAD

WARNER RO

AD

WAR

NER

COTSWOLD CLOSE

AVENUE

STANBU

RY C

LOSE

SAM

UEL

SQ

UAR

E

Scale 1: _ _ _ _ _ _ _ _ _$

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Page 73: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

BRANKSOMEAVENUE

ME

WS

RTH

KERESFORTH CLOSE

BROADWAY

BROADWAY

BROADWAY

KERESFORTH COURT

CLOSE

LINTON C

LOSE

BROOMFIELD

CLOSE

HORSEWOOD

ENUE

ARNCLIFFE DRIVE

14

112

102

52

44

30

27

29

32

34

44

46

42

17

13

15

El

21

16

11

15

7

19 to

28

13 to

18

6

1 to 1

2

1

12

Sub Sta

El

Fire Headquarters

Club

Sub Sta

20

30

186b

27

Gas Gov

Sub Sta

47

38

48

25

26

37

186c

24

El

1

14

2

2

48

1

50

81

11

74

61

1

56

72

42

70

Dunthwaite

Wheatside

13

69

24

40

36

27

1

24

66

22

474345

Hill Top

26

36

51

33

41

44

Pavilion

El Sub Sta

The Kingstone School

33

9

11a

11

Warehouse

2

Keresforth Lodge

68

51

66

66a

20

74

18

39

56

31

46

13

29

34

21

22

1 9a

Sports Ground

Playing Fields

Track

Track

Track

Allotment Gardens

Radio Pylon

Track

Shelter

Path (um)

Playing FieldTennis Courts

Playing Field

Chy

Track

El

Sub Sta

LB

Path (u

m)

Path (um)

Path (um)

Pond

Path

Path

148.8m

145.0m

145.7m

BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5BA5/5

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 74: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

THE LO

WER

LIMES

PANTRY WELL

KINGS CROFT

MO

UN

T PLEA

SANT

DARLEY YARD

LABURNAM

GROVE

WEST STREET

PAN

TRY

WE

LL

ASHWOOD

CLO

SE

OAKDALE

WALBROOK

DOVEDALE

POW

ELL STREET

UNDERHILL

ELMSDALE

BAD

EN S

TRE

ET

WEST STREET

RA

VE

NS

CO

UR

T

EENSWAY

CARRWOOD CLOSE

CLA

RKS

ON

STR

EET

JAMES STREET

OAKLEA

OAKWOOD

EDM

UN

DS

RO

AD

CLOSE

NEW STREET

POW

DER M

GREEN STREET

PANTRY HILL

GEORG

E ST

REET

HIGH STREET

OAKDALE

PANTRY GREEN

DARK LANE

POW

DE

R M

ILL

LAN

E

13

13

12

17

1

10

11

7a

2

11a

7

192

123

53

14

2

188

10

12

5

11

99

111

3

1

Factory

Factory

Works

4

2

57

1

Community

14b14c

14a

2

162

160

Church

144

162325

8

14

Club

Dove Cottage

645 7

8

87

90a

92

90

11

20

1

2

7

Worsbrough Centre

1

80c

80

80a

9

12

63

75

24

14

2

11a

Hazel

50

31

15

Head

7

29

2

68

6

26

15

64

62

8

31

7

47

Close

1

2

23

49

1

Oakdale

27

1

29

12

3121

20

7

9

28

15

12

25

24

23

1

16

14

1415

m Court

11

10

13

27

2

22

7

25

13

20

18

El

16

14

20 13

19

14

brary

9

33

Granvill

e House

56

25

45

31

38

24

9

36

28

44

18

1

29

13

2

13

1

12

5

18

43

16

1

49

2

112

126

2

35

(PH)

29

The Darley

41

5

3

37

152

136

1

128

3

Wind

yrid

ge

4

2

6

1a

112

3b3a

28a

23

1

2

12

15

1

Warehouse

6b

6a

5

8

12

14

12

2

21

23

20

5a

9a

2

1

6

8

18

28

23

30

(PH)

2

36

Boatmans Rest

13

3

PH

204

Stonedale

79

1

110

1

186

51

172

63

127

168

12

71

7

12

20

PH

198

10

8

166

8

2

164

164a

102

106

24

108

Terrace

1

2

10

5

32

West View

Factory

Garage

41

1

24

42

14

36

208

60

Sub Sta

11

36

36

13

23

52

Gov

Pipeline

Path

El Sub Sta

Mast (Telecommunication)

Path

Mast (Telecommunication)

Country Park

Worsbrough

River Dove

Path

TCB

Worsbrough Dale Park

Bowling Green

Sub Sta

Gas

Track

Track

WORSBROUGH DALE

Sub Sta

El

Pond

Track

Post

Playing Fields

LBD

W

Allotment Gardens

Posts

Shelter

Pond

Track

Rai

lway

FB

Post

LB

64.6m

68.0m

66.1m

7

69.8m

76.3m

81.1m

61.0m

62.4m

56.3m

59.1m

56.6m

56.8m

BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8BA5/8

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 75: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

BEEVOR STREET

LORD STREET

PONTEFRACT ROAD

ELM R

OW

151

111

123

135

101

2

6

132

142

Community

Works

24

126

CentreTransport

1

Club

El Sub Sta

93

Reform Church

Depot

1

6

95

Hoyle MillWesleyan

12

Warehouse

17

81

Works

Brewery

LB

Beevor Bridge

Industrial Estate

Tank

TCB

Dra

in

Tank

Outflow

Outflow

Path

Path

Path Path

Allotment Gardens

Path

49.0m

55.6m

47.7m

47.7mBA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9BA5/9

Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

150

146

PH

169

155

Path

HOYLE MILL

Path

50.3m

47.1m

ROAD

PONTEFRACT

Riding School

Works

79

Drain

Track

60.7m

58.7m

BARNSLEY MBC - Strategy Growth & RegenerationScale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

Assistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

Scale 1: _ _ _ _ _ _ _ _ _$

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Page 76: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

ASHLEIGH VALE

PONTEFRACT ROAD

ROAD

ROAD

CHERRYS

PONTEFRACT

LANE

TANK ROW

OAKS

ASHLEIGH VALE ROSED

SHE

OAKS LANE

CONWAY STREET

HO

YLE M

ILL RO

AD

HOPEWELL STREET

VICTORIA STREET

FOSTER STREET

CRESCENTOAKS

PONTEFRACT ROAD

OAKS LANE

DONCASTER ROAD

OLD

OA

KS

VI E

W

Barnsley Main Colliery

(Disused)

11

38

15

46

Oaks Business Park

1

Depot

El Sub Sta

7

2

16

1

8

2

1

2

ESS

1

21

High Gate Court

5

Garage

9

1517

21

58

53

12

49

2

1

14

20

35 25

16

27

34

14

29

4

2

30

45

404

21

402

El Sub Sta

11

7

15

27

22

Holme Suite

15

Sub El Sub Sta

Sta

El

14

55

40

6146

30

38

33

13 1

27

2

2931

1

113

2

41

10 35

51

50

434

26

21

38

1329

19 9

552

24

416

392382

428Surgery

380370

374

25

45

37

12

10

13

34

23

24

36

354368

69

42

34

24

342

1

65

63

14

16

12

45 to

61

G

330

21

43

376372

44

El Sub Sta

15

14

2

338 340

5

23 35

6

332

46

36

45

48

Cherry Trees

(Nursing Home)

174

203

ESS

Path (um)

Path

(um)

Path

River Dearne

Path

Track

ETL

El Sub Sta

Path

WB

ETL

Post Dismantled Railway

Cliffe Wood

Path

Path

Spring

Dismantled Railway

Path

Communications Mast

DW

Allotment Gardens

LB

MP 173.25

Path

River Dearne

Path

Pond

Drai

n

Shaft (dis)

Tanks

Path

Oaks Business Park

Path (um)

TCB

ETL

ETL

ETL

Dearne Valley Park

Path

Drain

Tank

s

Path

(um

)

ETL

Trac

k

Shaft (dis)

Path

Path

Dismantled Railway

SL

Drain

Drain

Path (um)

Path (u

m)

(Disused)

Post

Drain

Posts

Track

Mineral Railway

Drain

Path

(um

)

ETL

Path

(um

)

Path (um)

Drain

ETL

Dearne Valley Park

Path (um)

Drain

Path

Car Park

Issues

Playground

River

Foot Bridge

Car Park

Path

62.5m

40.0m

63.4m

85.0m

78.6m

82.6m

90.5m

86.3m

39.4m

44.8m

42.0m

72.6m

65.5m

42.4m

65.2m

67.6m

44.1m

65.6m

5.8m

45.1m

44.7m

57.1m

62.8m

68.3m

64.3m

BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10BA5/10

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 77: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

GR

AN

GE

CARRWOOD ROAD

LAN

E

GR

ANG

E LAN

E

PLACE

DONCASTER ROAD

ROAD

BANK STREET

WATERFIELD

DONCASTER

CARRWOOD ROAD

GO

RD

ON

STR

EE

T

SH

AFTES

BU

RY

STR

EE

T

STREET

SC

HO

OL

SCHOOL STREET

ROSEBERY STREET

LANE

TANK ROW

OAKS

ROSEDENE CLO

SE

SHEEPCOTE WALK

OAKS LANE

CONWAY STREET

HO

YLE M

ILL RO

AD

HOPEWELL STREET

VICTORIA STREET

FOSTER STREET

YMO

ND

KENW

OO

DCLO

SE

DONCASTER ROAD

RO

AD

4

Ppg Sta

El Sub Sta

12

17

19

27

33

1115

39

2

83

33

35

6

20

15

31

1

El Sub Sta

29

1

10

2

11

10

38

16

15

46

Surgery

313

56

13

18

El Sub Sta

35

32

36

516

514 518

1

Motel

5

10

1410

9

1

7

2624

2322

29

2728

25

31

Ardsley

504 508510

Club

Working Mens

45

502

43

3 3

4442

492 PO

347

2

49

1

2

13

55

14

2 3

30

626 8

81

House

SchoolGrasmereDepot

472

Shepcote

1

1a

9

490

Sub Sta

El

15

325

1

8

2

1

2

ESS

1

21

High Gate Court

5

Garage

9

15

17

442

21

58

53

12

49

2

1

2

14

20

3525

27

34

14

29

4

2

30

1

287

45

327

1

2

Depot

3

466

3

470

3a

17

1

Club

1

482

317

319

11

12

2

4

301

311

29

6

1

462

452

289

2a

33

131

27

2

29

31

1

113

2

41

10 35

51

50

434

26

21

38

1329

19 9

552

24

11

13

OutfallRiver Dearne

Path

Trac

k

ESS

Tank

Path

Track

ETL

Drain

PathDismantled Railway

Dismantled Railway

Path

DW

MP 173

Grange Bridge

ETL

ETL

Ou

WB

Drain

El Sub Sta

Dismantled R

ailway

Dismantled RailwaySTAIRFOOT

Water

LB

Path (um)

ETL

Drain

Issues

Dearne Valley Park

52.1m

55.8m

37.3m

36.9m

62.5m

67.7m

71.6m

65.8m

41.8m

40.8

38.7m

37.4m

37.4m

59.7m

63.4m

65.2m

63.7m

43

68.3m

64.3m

BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11BA5/11

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 78: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

DONCASTER ROAD

SANDYGATE LANE

DON

WOMBWELL LANE

BLEA

CH

CR

OFT

WAY

STAIRFOOT WAY

DONCASTER ROAD

ROAD

DONCASTER

KAY'S T

ERRACE

ZION T

ERRAC

E

NU

RSER

Y GAR

DENS

CLOSE

STANLEY ROAD

WHEATL

EY ROAD

HUNNINGLEY LANE

FIELD LANE

Oakhill Primary School

403

Community Centre

Superstore

El Sub Sta

2a2

2b

Keel Inn

Works

(PH)

Stairfoot Business Park

64

Warehouse

Garage

Superstore

El Sub Sta

El Sub Sta

PH

Highgrove Care Home

516

514 518

6

13

19

47

45

15

The Bungalow

4

Ardsley

504 508 510 ClubWorking Mens

Works

1

502

4

PO

2

1118

10

10

Works

Works

house

Depot

5

Field

Lod

ge

1

31

1

29

23a

1

Posts

MP

WB Path (um)

Path

Sub StaEl

Dismantled Railway

El Sub Sta

Pat

h (u

m)

Ramp

Posts

Posts

Water

Issues

Path

Path (um)

Path (um)S

Path (um)

Mast (Telecommunication)

STAIRFOOT ROUNDABOUT

Masts

(Telecommunication)

Posts

way

Allotment Gardens

LB 52.1m

47.2m50.0m

55.8m

52.4m

BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12BA5/12

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 79: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

ALBION ROAD

INDUSTRY ROAD

SPRINGBANK C

CH

AP

EL

LAN

E

CHA

LONG

FIELDS ROAD

MIDDLEWOODS WAY

CARLTON ROAD

SALTER OAK CROFT

BLA

CK

HE

ATH

CLO

SE

CLOSEBLAKELEY

LAITHES LANE

BLACKHEATH WALK

CA

RLT

ON

RO

AD

BLA

CK

HE

ATH

RO

AD

DER

WEN

T C

LOSE

TOTLEY

CLO

SE

BASLOW ROAD

ROAD

SCENT

Methodist

Church

42

17

44

1

23

1 to 16

2

418

5

Works

7

St Helen's

School

El

4

3

6

1

8

5

64

21

16

19

Club

10

10a

10c

6

9a

14

11

12

6

4

2

1

ESS

18

27

19

28

24

17

20

454

456

1

3

458

460

1

39

37

4951

35

68

448

450

452

1a

1

16

6

8

5

Greenfield Cottages

8

11a

19

9a

11

13

1

54

25

9

2

Broo

kfie

ld T

erra

ceCo

ttage

s

7

1So

uthf

ield

1

40

5a

28 3

30

44

38

5

26

32

3

11

50a

9

50

15

52

4

2

Carlton Industrial Es

El Sub Sta

432

430

Depot

438

El Sub Sta

Kingdom Hall

436

Willow Cottage

1

2

12

3

9

14

22

20

Sub Sta

215209

Shelter

207

380

370

El

368

Sub

Sta

12

13

24

14

21

11

3544

2

1

352

2

2

1

1

3

342

334

11

1

30

11

17

12

22

41

239

58

10

64

51

56

33

8

2

31

42

5

7

40

10

13

16

17

4

1

9

17

227

18

31

1717

6

20

1

6

4

424

Works

23

units 7 to 16

5

Longfields Court

7

1

13

1 to 27

18

12

19

14

Longfields House

2

Carlton Court

Path

Drain

Tan

WB

WB

Tank

Path (um)

Chy

Tennis Courts

El Sub Sta

Tan

Chy

Woodmoor Court

CollectsPath

Collects

FB

Carlton Green

59.4m

65.2m

80.5m

82.2m

74.5m

74.7m

72.1m

76.5m

BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14BA5/14

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 80: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

LANE

P

KING EDWARD STREET

LYTHAM AVENUE

AINSDALE C

OURT

HEYSHAM GREEN

KING EDWARD STREET

HEYSHAM GREEN

ST MIC

HAEL'S AVENUE

PRESTON WAY

WALNEY FOLD

FORMBY COURT

FYLDE CLOSE

LONGRIDGE ROAD

FISH DAM LANE

ST ANN

E 'S DR

IVE

POULTON STR

EET

CARNFORTH ROAD

LYTHAM AVENUE

C

FURNESS DENE

ST FRANCIS BOULEVARD

INDUSTRY ROAD

FISH

DAM

LANE

CARTMEL COURT

BAYCLIFF CLOSE

DRIVE

RAINFORD

EDEN

F IEL D

CL O

SE

ST ANN

E 'S D

RIV

E

KIRKHAM PLACE

MANO

R FARM

CLOSE

SHAW

MA

NO

R ST R

EET

FISH D

AM

LANE

WHARNCLIFFE STREET

WOODMOOR STREET

ST HELENS WAY

MERCHANT CROFT

SHA

WFIE LD

RO

A D

HUMBERSIDE WAY

SHAW LANE

BARKSTON ROAD

ALBION ROAD

WEST GREEN WAY

SHAW

F IE LD R

OA

D

BAR

KSTON

RO

A D

INDUSTRY ROAD

ALBION

RO

AD

ALBION ROAD

SPRINGBANK CLOSE

CH

A PE

L L A

NE

SPRING LANE

ST HELEN'S BOULEVARD

SHAWFIELD ROAD

LONG

FIELDS ROAD

MIDDLEWOODS WAY

ST HELENS AVENUE

HELE

NS

OAK HEAD CLOSE

ST

PLACE

BEAU

MO

ND

CL O

SE

CARLTON R

OAD

SALTER OAK CROFT

BLAC

KHEA

TH C

LOSE

CLOSEBLAKELEY

BLACKHEATH WALK

CA

RLT

ON

RO

AD

BLAC

KH

EATH

RO

AD

DER

WEN

T C

LOSE

BASLOW ROAD

ALDBURY CLOSE

FULM

ER C

L OS E

CONSTRUCTION WAY

Carlton

Wharncliffe Arms

Bakery

Primary School

MethodistChurch

Works

St Helen'sSchool

Priory Court

Depot

Primary School

St. Helen's

Depot

CentreWelfare

Carlton

Estate

Industrial

Carlton Industrial Estate

Depot

El Sub Sta

Kingdom Hall

Springwell Community School

Depot

Works

St Michael's Catholic

St DominicsCatholic Primary School

and Church of EnglandHigh School

Holy Cross Deanery

Voluntary AidedChurch of England

Primary School

Carlton Court

Path (um)

Path

FISH DAM LANEROUNDABOUT

Path

Carlton Industrial Estate

Carlton Industrial Estate

Allotment Gardens

Track

Drain

Path (um)

Tennis Courts

Path (um)

Spring Wood

Path (um)

Woodmoor Court

Carlton Green

67

61.3m

60.4m

55.5m

69.2m

69.5m

67.4m

67.8m

67.4m

71.6m

74.4m

76.8m

69.5m

74.7m

78.3m

70.1m

68.0m

76.8m

78.6m

81.4m

55.5m

57.3m

86.0m

90.2m

82.6m

59.4m

65.2m

83.4m

84.7m

80.5m

82.2m

74.5m

72.1m

76.5m

86.4m

BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15BA5/15

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 81: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

SHAW LANE

LANE

CHU

RCHFIELD

GAR

DEN

S

IVY

FAR LAWNS

PARK

SIDE

ST FRANCIS BOULEVARD

INDUSTRY ROAD

FISH

DAM

LANE

CARTMEL COURT

ST ANN

E 'S

CLO

SE

MANO

R FARM

CLOSE

STREET

SHAW

FARM

MA

NO

R ST R

EET

FISH

DA

M LA

NE

WHARNCLIFFE STREET

WOODMOOR STREET

CHURC

H

SPRING GRO

VE

CRONKHILL

LANE

SPRING LANE

SHAW LANE

WEST GREEN WAY

57

Bakery

Carlton

Wharncliffe Arms(PH)

Bakery

Primary School

61

4

7

2

111

101

Pump House

El Sub Sta

1

6

11

15

1

2a

2

4

12

6

4

2 1

Park House

Parish Hall

49

2

16

15

12

Pavilion

4

51

253

8

22

27

3

22

11

1

Pavilion

36

3

3

37

9

1

7

8

4

7

1

1

1a

9

88

16

6462

86

2

1

8

Stud Farm

10

2a

16

2

11

11

28

1

2

15

8

15

18

7

15

7

9

's Church

2

2

234

228

1

226

2

224

246

258

El Sub Sta

270

1 0

11

1

240

236

2

12

16

23

11

1

19

11

12

2

8

Carlton Community College

Dra

in

Track

Drain

Drain

Shaw Viaduct

Sewage Works

Drai

n

Issues

Path (um)

Path

Tip

(disused)

Path

El Sub Sta

Tanks

Path (um)

Sinks

Chy

WB

Recreation GroundTennis Courts

Bowling Green

Path

GP

Foot Bridge

t Bridge

Lych

TCB

WarGateMeml

FISH DAM LANE

ROUNDABOUT

Path

Allotment Gardens

(disused)

Barnsley

CanalL Col

L Col

Games Court

L Col

L Col

L Col

L Col

Games Court

L Col

L Col

Carlton

47.5m

48.8m

48.5m

46.9m

48.8m

44.5m

50.3m

65.7m

61.3m

60.4m

55.5m

63.2m61.2m

56.7m

58.8m

55.2m

66.8m

67.2m

BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16BA5/16

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 82: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

WADDINGTON ROAD

PORTER TERRAC

Porter A

venue

MARY'S PLACE

MAY

TER

RAC

E

ST HILDA

AVENUE

WEST ROAD

THE LINDALE

S

WINTER AVENUE

WINTE

WINTER ROAD

CRESSWELL

STREET

GR

OSVE

NO

R W

ALK

SALT

ERS

RIS

E

GRAMPIAN CLOSE

WADDINGTON ROAD

CLOSE

D

MALVERN

GLE

ND

ALE

CLO

SE

WAD

E STR

EET

WEST ROAD

Greaves Fold

E GDNS

5

5

225a

7

8

2

225

1

17a

3

2

12

17

2

Methodist

233

186

176

247

168

2

1

2

18

10

1

221

8

2

186d

18

13

Garage

11

8

10

11

2

21

1

8

136

138

4

15

1

6

140

7

142

Church

22

4

Pogmoor

1

144

1

55

60

54

Industrial Estate

12

Wheaton House

1

3

2

208

207

28

2

1

1

2

12

2

146

El Sub Sta

221

209

1

227

6

162

154

Tanks

16

24

42

21

52

11

14

32

1

48

3436

40

50

64

90

1

11

29

62

2

78

64

19

9

30

2

3 1

1

68

16

PO

2

84

94

39

12

20

25

2

12

11

Northc

ote Terr

ace

106

5

13

114

96

11

13

17

18

10

4

2

1

to

6

116

122

GardensAllotment

LBCheviot Walk

Car Park

n Ground

Water

TCBs

MS

143.0m

139.8m

135.9m

132.7m

133.9m

139.9m

140.2m

137.5m

BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17BA5/17

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 83: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

BURTON ROAD

WH

AR

F ST

REE

T

STREETTWIBELL

EAMING VIEW

94

86b

74

86a

86

62

64

88

40

59

38

52

28

49 47

19

21

51

16Warehouse

Gas Holder

OLD MILL

Peel Centre

7

El Sub Sta

8

10

39

1

3129

11

2 to 816 to

Warehouse

25

Warehouse

1

Warehouse

23

2

El Sub Sta

1

2

3

4

Depot

6

Warehouse

Track

Path (um)

Path

ETL

Tanks

Depot

Car Park

Canal

Barnsley

Track

(disused)

Path

Sports Ground

Path (um)

El

River D

earne

FB

Sub

Sta

Gas Valve Compound

54.6m

50.3m

49.7m

BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18BA5/18

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 84: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

BURTON BANK ROAD

WA

KEFIELD R

OAD

CAWLEY PLACE

OLD

MIL

L LA

NE

PEEL

PLAC

E

19

21

Burton Road

23

21

1

11

Junior and Infants Sc

14

7

Works

Warehouse

1

23

21

9

11

3

2

Works

33

41

Works

76

56

70

95

42

109107

81

El Sub Sta

OLD MILL

3

ETL

Tanks

Dismantled Railway

Path (um)

Pond

The Fleets

Pat

h (u

m)

ne

LB

FB

Sub Sta

Path

Depot

Builder's Yard

Allotment Gardens

Track

Track

WB

El

Old Mill

Playing Field

Gas Valve Compound

Bridge

Water

Path

River

Dearne

Weir

Sluice

Water

50.3m

47.2m

45.4m

50.6m

48.8m

50.9m

51.8m

BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19BA5/19

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 85: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

NEWLAND ROAD

NEWLAND ROAD

RBURN ROAD

NEW LODGE C

RESCENT

ROAD

ROAD

DENBYSELB

Y

PARK AVENUE

WAKEFIELD ROAD

CRESCENT

MARSTON

STAIN

TON

CLO

SE

29

31

Depot

33

32

Works

21

27

4

23

25

10

6

1

8

2

Works

15

23

22

21

20

13

18

18

20

24

29

25

26

3331

East

Farm

Gawber

Hill Top

1

219

225

223

223a

219a

1a

2

304

El

300

Church

Sub

Sta

13

19

11

17

7

46

17

2

9

11

1

42

11

7

4

1012

68

12

82

94

11a

70

241

243

96

41

22

20

233

Shelter

39

32

27

41

29

42

54

52

1

3

1

306

3182

4

1

2

255

320

330

269

17a3

Club

1

58

51

26

19c19b

56

28

21

42

28

37

40

35

30

7

53

4749

23

4

20

26

340

19

11

Sub StaEl

11

19

16

6

18

13

5

12

2

1

11

3

Issues

Sinks

Pond

Path

(um)

Path

Track

Trac

k

Issues

Path (um)

83.0m

83.5m

81.6m

80.5m

81.1m

87.7m

85.7m

BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20BA5/20

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 86: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

B 6411

CHAPEL LANE

CHAPEL LANE

ALBI

ON

DRIV

E

GEORG

E ST

REET

LIDGET LANE

9

12a

12e

12i

12f

12k

12j

10 a

nd 1

1

22

Factory

El Sub Sta

1

11 1710

Vincent Terrace

1

15

20

10

44

49

El Sub Sta

75

8

64

54

61

21

135

24

34

Primary School

The Hill

76

ETL

ETL

Dra

i n

ETL

Drain

Pheonix Park

LB

Mast (Telecommunication)

Pond

50.2m

63.7m

51.3m

49.4m

72.1m

71.5m

52.2m

52.7m

DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1DE4/1

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 87: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

DANE

STR

EET

NO

DANE STREETDANE

CO

RO

NAT

ION

STR

EET

CAUDALL CLOSE

SAXON STREET

STREET

CLA

RKE

STR

EETLIDGET LANE

STATION ROAD

STUA

RT S

TREE

T

STATION ROAD

HOLLY BUSH DRIVE

WHE

ATFI

ELD

DR

IVE

BAR

RO

WFI

ELD

RO

AD

BARROWFIELD ROAD

Lock

woo

d La

ne

LIDGET LANE

PHOENIX LANE

OAK

CHAPEL CLOSE

DANE

STR

EET

SOUT

H

WINDSOR GARDENS

QUEEN

STR

EET

KING

STR

EET

PRIN

CES

S D

RIV

E

ASHLEA

YOR

K M

EWS

22

5

33

14

2

2

77 to 83

Thurnscoe Business Centre

27

7

23

25

11

15

30

40

69

28

38

Station

19

59

1

3

11

13

17

4

9

26

6

20

6

3

1616

2

19

20

19

2

10

14

9

111

10

36

1

6

99

El

Sub

1

Sta

8

85

1

1

El Sub Sta

31

Club

6

2

41

21

22

30

23

16

Workshops

15

Hickleton Terrace

Depot

35

30

39

20

8

13

27

36

El Sub Sta

20

19

3

5

4

2

4

1

5 to 10

7

30

40

1

Hall

38

12

Hall

2

1

2

22

29

14

12

8

1

10

7

6

15

14

11

18

17

8

9

33

12

9

22

1

2 8

PO

2

4

3

Station House

4

21

11

22

15

20

1

2

1

15

Surgery

(Nursery)

The Embankment

Allotment Gardens

TCB

Lock

woo

d La

ne(P

a th)

Thurnscoe Business Pa

Pheonix ParkDrain

Pheonix ParkDrain

MP 171.25

SP

Drain

El Sub Sta

Path

MP 15

Playing Field

Path

(um

)

MP 171

THURNSCOE EAST

47.8m

52.3m

50.1m

49.2m

42.6m

42.5m

47.3m

DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2DE4/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 88: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

PROSPECT ROAD

THE GREEN

HIG

HG

ATE

LA

NE

ROAC

HE

DRIV

E

CRANWELL COURT

OSC

OE G

RO

VE

KNOLLCLOSE

BECK

HIG

HG

ATE

L AN

E

RUFFORD RISE

EDWARD ROAD

COMMERCIAL ROAD

HIG

HG

ATE

CO

UR

T

LAWNWOOD DRIVE

DRIVE

FOX

CO

UR

TLOW

ER

CLO

SE

CO

VER

T

HO

LME

MIL

L

MILLRACE

MEADOWGATES

E S

TRE

ET

CROFTON DRIVE

CLO

SE

CROFTON DRIVE

HAL

L BR

OO

ME

GAR

DEN

S

CARR FIELD LANE

RIN

GW

AY

COM

MER

CIAL

RO

AD

CO

MM

ER

CIA

L R

OA

D

COMMERCIAL ROAD

DU

DLEY

DR

IVE

RIV

E

BECKFIELD GROVE

COM

MER

CIAL

RO

AD

CARR FIELD LANE

12

119

10

6

7

14

25

7

32

38

39

48

34

32

2

200

25

1

23

1

216

8

2

56

64

37

55

66

51

58

50

74

30

42

25

26

35

40

38

8

33

2

43

7

18

14

1

23

14

17

2

33

5

13

89

1

26

28

36

23

81

35

46

45

71

87

165

168

211

166

El S

ub S

ta

172 to 210

Court

171

16 9

Heather

153

135

148

143

170

139

152

104

9

59

3

11

17

44

1

47

2

49

4

109

41

2

El Sub Sta

The Paddocks

Ascot House

1

50

1

15 1113

6

10

Grey Gables

2

126

White Cot

15

3

23

11

1

14

8

24

142

2

1517

7

12

2

10

14

1

8

11

66

25 52

35

15

5

118

17

126

120

94

11

6

14

82

106

1618

78

1511

1

286

23 7

36

6

27

40

2

20

18

37

25

1

31

2

19

910

El Sub Sta

16

59

45

56

50

51

39

33

11f

1 2c

9a9e

El Sub Sta

10e

10a

1 2a

11a

17a

17b

18a 18b

12

25

17

1

2

Dearne Carrfield Primary School

21

2

11

20

30

43

35

15

6

7

10

16

11

8

1 2a

42

4a

1517

4

8 a

2

8d

3f

5

3a

26

21

14

15

25

27

30

23a

24a

24b

23b

22

29

28

132

131

Allotment Gardens

Dism

antle

d Ra

ilway

Tennis CourtLB

Track

Games Court

Dra

in

Clover Walk

Clover

Walk

Path

Path (um)

Goldthorpe

Industrial Estate

Goldthorpe

Industrial

Estate

LB

Allotment Gardens

Disman

tled R

ailway

28.7m

27.6m

27.4m

29.3m

33.9m

34.3m

34.7m

39.0m

33.4m

33.0m

30.4m

31.6m

32.8m

33.3m

DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3DE4/3

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 89: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

WE

LLIN

GTO

N S

TREE

T

KING

SMAR

K WAY

PR

INC

ESS

RO

AD

VICTORIA STREET

BARNBURGH LANE

BEEVER STREET

CROSS STREET

CO-O

PERATIVE STREET

QUARE

LANE

RIS

ED

AL E

RO

A

RNBURGH

STREET

FLO

WER

STR

EE

T

FREDERICK

DONCASTER ROAD

DONCASTER ROAD

GAR

DEN

STREET

106

El Sub Sta

74

76

96

86

117

11

19

21

53

26

14

37

62

105103

40

2

1

79

16

28

27

83

30c

30b30a

2

30d

4

32a

61 6367

69 71

65

49

Carr H

ouse

1 to

12

45

57

Club

56

59

51

24a22 24

30

8

Golden N

ugget Club

1

11

Warehouse

66

40

1

54

28

89

7

77

89

8379

38

2

73

24

22

103

103

9799

50

Telephone Exchange

Church

4

3

71

38

2

9

16

91

1

18

2

14

75

12

53

41

31

38

18

24

2

50

1

13

14

55

7

Claycliffe Terrace

13

12

214

10

24

27

3

63

15

29

30

53

8

16

67to

71

2

38

1

1

115

50

107

93

113

89

48

10

28

Dairy

22

30

19

39

39

22

11

15

21

3

32

47

41

46

Trac

k

Track

Path

Playground

Allotment Gardens

Path

FB

Allotment Gardens

Dismantled Railway

Car Park

Market Place

b

El Sub Sta

54.6m

53.6m

55.6m

55.6m

36.8m

36.6m37.8m

DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4DE4/4

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 90: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

ELMHIRSTLANE

A 628

BAMFORD CLOSE

ST JO

UPPER CLIFFE ROAD

GALPHARM WAY

WORTLEY COURT

CHAMPANY FIELDS

FOXM

IRE GRO

VE

HAWKS CLIFF VIEW

BRIERY GDNS

FALL BANK CRESCENT

ROAD

FIELD

MIDDLE

8

1

2

10

9

Norec House

Dodworth Station

SB

9

Silo

3

31

2a

14

Tank

18

41

20

30

29

35

47

21

61

9

ESS

55

44

1

10

34

9

7

5

1

6

3

El Sub Sta

8

Hotel

10

16

15

14

El Sub Sta

9

11

Shelter

El Sub Sta

Gas Meter House

2

El Sub Sta

1

9

11

2

6

63

38

2

67

50

8

7

1

4

17

20

18

Units

1 2

3

2

42

16

Units 6

7

Units 4 5

Mast

Tank

El Sub Sta

Dodworth Business Park

Path

Drain

LC

Tanks

FBPath

Drain

Track

Track

Track

Sinks

Cemetery

Elmhirst Park

El P

ETL

El P

El P

Fall BankIndustrial Estate

El Sub Sta

Tanks

MP 0.5

Path (um)

Tank

Drain

Drain

El Sub Sta

Mast

El P

ETL

El P

144.3m

156.2m

162.2m

DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1DO4/1

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 91: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

ELMHIRSTLANE

A 628

CR

ES

CE

NT

BA

SLO

W

BAMFORD CLOSE

WH

UPPER CLIFFE ROAD

GR

EA

T CLIFFE

RO

AD

GALPHARM WAY

WORTLEY COURT

CHAMPANY FIELDS

FOXM

IRE GRO

VE

HAWKS CLIFF VIEW

BR

FALL BANK CRESCENT

ROAD

FIELD

MIDDLE

1

2

10

29

30

Norec House

Dodworth Station

12a

SB

52

18

69

1

Railway

Cottages

31

43

2a

14

Tank

41

20

30

29

35

47

21

ESS

55

44

1

10

34

9

7

5

1

6

3

El Sub Sta

8

Hotel

10

16

15

14

El Sub Sta

9

11

2

Hugh H

o u se

Shelter

El Sub Sta

Gas Meter House

2

El Sub Sta

1

5

1

38

2

8

7

1

4

17

20

7

8

Great Cliffe Court

18

Units

1 2

3

2

42

16

Units 6

7

Units 4 5

Track

Mast

Tank

El Sub Sta

Dodworth Business Park

Path

Drain

LC

Tanks

FBPath

Elmhirst Park

El P

ETL

El P

El P

Fall BankIndustrial Estate

El Sub Sta

Tanks

MP 0.5

Tank

Drain

El Sub Sta

Mast

Track

Path (um)

El P

El P

ETL

El P

144.3m

156.2m

DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2DO4/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 92: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

BARNSLEY RO

AD

BEN

CE

CLO

SE

STATION ROAD

OR

CH

AR

D C

RO

FT

DARTON LANE

CLOSE

DAR

TON

HALL D

RIVE

DARTON HALL CLOSE

DEARNE

STREE

T

BRIDGE S

TREE

T

SCHOOL STR

EET

STATION ROAD

MILL LANE

CHURCH STREET

17b

17a

23

36

20

1

13

18

2

Hawthorne House

12

11

2a

2

8

2

1

80

56

47

25

11

15

1

1

22

9

2

12

101

El Sub Sta

15

25

35

95

32

93

26

44

38

25

37

40

57

67

77

41a

42

79

13

2

1

55

14

15

16

35

1

2

29

47

1a

37

2

Exchange

27

Telephone

17

The

Old

School

78

80

76

74

33

9

31

69

1947

1

61

Centre

PO

Health

61

y

l

60

Darton Primary School

18

2

Bence Farm House

Anvil Cotts 4

5

6

1

138

Stonewell Cott

2

3

El Sub Sta

2

148

110

26

14

11a

15

128

11

25

118

1 to 12

Club

1

2

12

Pavilion

o

146a

Darton

Church

1

The Chalet

17

86Methodist

Darton

15

20

12

2

94

96

River D

earne

FB

FB

SM

Pat

h

Dismantled Railway

LB

Playing Field

Drain

Drain

Riv

er D

earn

e

Track

MP 50

MP 50

Pond

Drain

SL

MP .75

MP .75

El Sub Sta

Darton Business Park

Darton Brid

ge

SP

El Sub Sta

TCB

Bowling Green

Court

Recreation Ground

Putting Green

Court

Tennis

Tennis

Playground

Car Park

TCB

FB

Drain

85.0

m

78.3m

76.2m

68.0m

72.5m

79.6m

61.9m

61.0m

61.0m

59.7m

61.9m

61.5m

61.1m

62.1m

DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1DT4/1

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 93: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

MAP

PLEW

ELL

DRIV

E

BLACKER ROAD

HAMBLE COURT

SALCO

MBE

BEAULIE

U VIE

W

BEAULIEU CLOSE

CLOSE

WEN

TWO

RTH

RO

AD

CAR

R G

REE

N LA

NE

EDWARD STREET

W

PARK

CLO

SE

WELLS COURT

HOPE

STR

EET

CLOVER

BLACKER ROADCH

SCHO

OL

STRE

ET

7 to 8

Courtyard 1

1 to 3

4 to

5

Courtyard 2

1 to 4

9 to 10

5 to 6

16 to 18

Courtyard 3

5 to 6

10

1 to 4

23

Garage

33

1

5

26

26

30

5

19

18

22

11

51

24

14

39

144

37

126

15

129

11

2

3

32

114

22

Mapplewell Park

95

8

101

2

27

31

16

7

1

15

10

10

7

1

114

Depot

Warehouse

118

1

2

1

53

15

45

2

10

57

11

4

912

352

50

21a

1 to 6

7 to1

1

12 to 14 15

13

C

9

10

Mapplewell Business Park

1

El Sub Sta

2a

46

16

17

6

41

2

20

18

11

21

133

14

15

2

1

Gar

age

11

8

1

1

6

Shelter

Works

11

8

Depot

29

39

5

11

16

107

15

113

21

2915

31

30

29

43

45

117

119

137

11

2

51

40

63

55

55a

12

11

36

2

1

78

10

9

1

Chapel Mews

4

3

5

6

19

2

31

Staincross Methodist Church

381

8

Club2

4

3

756

5 7

9

14 15

1012

11

14

Courts

Bowling Green

Mapplewell Playground

Courts

Depot

ETL

Path (um)

Path

Drain

MemorialWar

Path (um)

89.8m

86.8m

87.6m

94.6m

91.1m

98.8m

96.9m

DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2DT4/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 94: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

WAKEFIELD RO

AD

BAR LANE

TALL

RO

AD

WO

LLAT

ON

CLO

SE

EASTFI

ELD C

LOSE

EASTFIELD CRESCENT

CLI

FTO

N C

LOSE

WAKEFIELD ROAD

1511

1

19

1

7

13

1a1b

418

414

76

417

2

427

437

1

3

407

Nursery School

Garage

Works

2

35

25

397

38

27

30

13

9

42

2

1

16

TIPSEY COURT

60

3

1

2

4

(PH)

(PH)Eastfield Arms

Eastfield Arms

20

8

30

3

4

62

2

76

29

56

Noroyds

1

overnor

32

19

28

30a

9

14

41

ETL

Pa t

h (u

m)

Path

(um

)

Dis

man

tled

Rai

lway

Post

ath

LB

Pat

h (u

m)

93.1m

92

97.9m

95.2m

94.7m

93.8m

96.0m

104.9m

102.6m

96.8m

DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3DT4/3

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 95: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

M 1

SWALLOW CLOSE

HIGH CLOSE

HUDDERSFIELD ROAD

SIKE CLOSE

LAMBE FLATT

MIDDLE CLOSE

CLOSE

KNO

WL

ING

FALC

ON

FALCONER

6563

77

39c

Junction 38 Business Park

39a

39b

39d

Factory

7

15

104

2

2

43

13

24

26

22

1

2

14

5

11

55

9

53

161

126

57

210

15

10

11

17

3

2 2

1

11

3

1

81

11

7

12

1

4

4

15

1

47

14

Pond

TCB

Tank

WB

El Sub Stas

Tank

Cricket Ground

Car Park

74.6m

84.1m

83.0

m

80.8m

76.5m

75.3m

DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4DT4/4

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 96: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

SILK

STO

NE

CLO

SE

NEW ROAD

LIDGET LANE

NEW ROAD

PILLEY GR

EEN

LIDGETT LANE

THE AVENUE

A 616

A 61

GREAVES LANE

WESTWOOD NEW R

OAD

MAPLE R

OAD

A 61

MAPLE COURT

STONE ROW COURT

WENTWORTH WAY

CO

LLI ER

Y Y

AR

D

STONE LEIGH

PRINCESS GRO

VE

CARR LANE

CAR

R L

ANE

WESTWOOD

LANE

WESTW

OO

D LAN

E

CARR LANE

STWO

OD

LANE

A 616

STORRS LANE

STORRS LANE

Lacton House

Hawthorn

The

Knoll

Knoll

41

The

Cottages

The Cottage

(disused)

67

Woodman's

Cottage

Shaft

Tankersley Manor

(Hotel)

ESS

Wentworth

Park House

Rockingham House

Industrial Park

10

11

Fitzwilliam House

27

Phoenix House

29

4

Fire S

tation

El Sub Sta

Knoll Drift

1

Maple Park

4

7

35c

21

37a

11 14

16

1

8

2

24

21

32

15

20

31

Pilley Green

96

106

84

53

94

42

33

34

2

1

5

8

Church

Mission

Pilley

11

26

23

19

15

1

21

2

Shelter

Harriet

6

House

59

33

2 6

45

40

El Sub Sta

Wentworth Industrial

Park

Filling Station

El Sub

Sta

Sterling House

Unit1

House

2014

28

14

39

18

35

37

19

1

El Sub Sta

12

7

2

15

17

6

Pilley F

m Cott

WHARNECLIFFE

Pilley Fm Bungalow

73

House

10

Pilley Fm

COURT

Unit4

The Wentworth

(PH & Motel)

Wentworth

12

2

17

42

20

3a

22

35

33

52

50

1

43

31

29

41

30

23

20

Club

79

4

118

16

16

2

20

15

2

1

9

11

1

Path

(um

)

Path (um)

Air Shaft

Path (um)

Westwood Country Park

Path (um)

Potter Holes Planta

Pond

Issues

Park

Drain

WestwoodCountry

TipTrack

Upper Tankersley

Track

(disused)

Tank

Tank

Potter Holes Plantatio

Dra

in

Drain

Path

(um

)

Pond

Path (um)

Drain

Dismantled Railway

SM

SM

Weigh S

tation

FB

SM

Playing Field

Sowell

Bridge

Path (um)

SM

Pond

Wood

Air Shaft

Dismantled R

ailway

Path (um) Round

Spring

Sowell

El Sub Sta

Tank

Tank

Pond

Drain

Drain

Path (um)

ETL

Track

Track

Track

Trac

k

West Wood

Path (um)

Lay-by

Dra

i n

Ponds

Path (um)

Track

Track

Track

Ponds

Path (um)

Storrs Bottom

Track

Issues

TCB

GP

Clay Royd Plantation

Pond

Path (um)

GP

LB

Pilley

Path (um)

Air Shaft

Path (u m)

Path

(um)

Path (um

)

Croft Head Plantation

154.8m

163.1m

161.5m

138.7m

146.0m

139.9m

153.0m

173.7m

168.2m

171.9m

170.8m

157.2m

172.9m

174.8m

164.7m

164.3

m

161.2

m

165.4m

165.1m

140.5m

149.4m

146.9m

152.1m154.5m

143.0m

139.8m

148.4m

140.2m139.9m

170.1m

169.2m

169.5m

161.2m

HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1HN4/1

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 97: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

WO

ODLAN

DS

SILKSTONE VIEW

ROAD

PEPPER STREET

DEARNE VALLEY PARKWAY

MARKET STREET

ROTH

ER C

ROFT

WOMBWEL

L ROAD

GUE

WOODLANDS

VIEW

CUMBERLAND ROAD

GREENSIDE LANE

KINGSWOOD CRESCENT

NORTHUMBERLAND

AV

CUMBERLAND C

LOSE

BARNSLEY RO

AD

DEARNE VALLEY PARKWAY

Track

ST ANDREWS CRESCENT

ST ANDREWS CRESCENT

AVENUE

WIND

SOR

STREET

VICARAGE CLOSE

ST ANDREWS RO

AD

MELL

MARKET STREET

CHAMBERS ROAD

WO

MBW

ELL

RO

AD

OLD SCH

OO

L

CLOSE

CROFT ROAD

LONGFIELDS

LON

GFIELD

S CR

ESCENT

LON

GFI

ELD

S C

RES

CEN

T

CRESCENT

EDWARD STREET

ROYSTON HILL

RO

ADW

EN

TWO

RT H

GRANGE VIEW

BARNSLEY RO

AD

RYECR

OFT BANK

WAY

MASON

RO

AD

MASON WAY

CLAYFIELD

HAWSHAW LANE

CHAMBERS ROAD

TINSLEY ROAD

BARROWFIELD ROAD

ROAD

CLARK STREET

CROFT

KIRK BALK

CORONATION ROAD

CRO

WN STREET

MOUNT CRESCENT

B 60

96

DEARNE VALLEY PARKWAY

HAWSHAW BANK

35

44

18

17

8

10

15

2

16

9

22

11

30

25

8

1

13

22

28

Police

30

101

84

76

Station

14

9

2

Shelter

5

62

71

50

93

85

20

68

79

27

29

31

15

4410

10

7

2

4

129

19

Ambulance Depot

13

5

6

18

1

23

3

PH

1

2 3533

12

1

11

4

8

75

69

Yard

Playford

90

215

203

229

1

6

199

1

2

3

40

1

43

13

41

31

2

45

BaileyHouse

32

72

28

13

25

15

Anber Holme

The Old Fire Station

11

15

52

38

31

37

40

55

43

124

8

6

5

27

7 Greenside

122

110a

110b

104a

25

9

110

1

23

112

10

114

House

BungalowLongfield

36

34

1

140

9

138

2

19

2

8

8

17

13

1

14

26

2

31

16

5

1

14

15

2

40

51

2

52

42

18

10

9

2a 1

66

11

64

Hampton House

2

21

88

76

98

16

70

10

36

64

27

1917

24

28

30

17

18

5260

40

10

29

42

Fairview

35

2

1

6

132

128

Hoyland Hall

116

1

3

38

39

17

24

3

74

Royston Cottages

137

135

165

Longfield

44

46

28

23

38

12

113

64

37

70

20

18

1

10

15

2

23

Culham

79

PC

91

69

44

96

57

15

1

2

3

8

5

7

61

195

37

16

31

14

Low Lane Cottage

Farm

Wood Head

93

1

88

91

9597

School Bungalow

Learning Centre

HouseSchool77

11

30

Royal Albert (PH)

25

19a

18

19

21

18b

19b

18a

16 62

49

7

Villas

2

Longfield

123

151

4

56

46

48

66

101

20

71

61

53

17

82

5869

7

23

13

9

28

2

5557a57

45

25

40

12

35

50

1

50

Kirkwood

98 ESS

83

74

6

52

Kirk View

1

21

1120

5

16

62

29

6

4

6a

60

39

71

75

2

Chapel

Sunris

e

Club

69

19Institute

Manor

and

Platts Common

68

60

Depot

Industrial Estate

12

10

9

l3 to

l7

3

9

10

2

Blacker Grange

474

ESS

3a

38

1

35

4

44aBrentwood

49

Cottage

Ryecroft

57 8

5

5

66

Pepper Tree

6

12

Court

3

19

25

Three T's Business Park

44

3

1

63

58

Church

Bark House

55

St Andrew's

Foxwood

Centre

Lanrick

Comm

unity

48

71

72

69

Garage

77

Vicarage

48

54

62

83

9

2

2

14

7

7

8

2

24

19

106

Hall

11

16

90

104

82

1

26

1

52

2

38

35

36

1

20

28

3

Issues

Allotm

ROTHER MEWS

GP

Playing Field

Playground

Cemetery

Posts

Nursery

LB

WB

LB

Crane

Trav

elling

El Sub Sta

Posts

TCB

Car Park

Recreation Ground

Miners' Welfare

Bowling Green

Platts Common

El

Platts Common

LB

El Sub

Sta

Sub Sta

Tank

TCB

Blacker

Playground

PENNINE VIEW

War Memorial

PLATTS COMMON

ROUNDABOUT

Water

Trac

k

Drain

Trac

k

Foot Bridge

Ow

let Dike

Issues

Track

Blacker Dike

Track

135.3m

136.2m

120.3m

139.8m

144.6m

134.6m

137.7m

141.5m

140.7m

138.3m

138.1m

144.7m

135.3m

139.2m

137.8m

129.5m

135.8m

136.8m

132.0m

146.7m

138.7m

149.3m

163.8m

156.3m

146.3m

174.3m

164.6m

163.1m

177.4m

HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2HN4/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 98: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

CHILCOMBE PLACE

ALVERLEY WAYGILDH

UR

ST CO

UR

T

LOC

KSLEY GAR

DEN

SLYNHAM

AVENUE

SHEFFIELD ROAD

ROCKINGHAM ROW

ROCKINGHAM CLOSE

THE WALK

VERN

ON

STREET

BELL

MER

CR

OFT

ROCKINGHAM MEWS

ROCKINGHAM STREET

28

20

15

11

37

43

47

53

30

19

2

2

12

23

1

2527

31

36

20

11

26

32

15

14

22

2833

31

2927

2523

9

4

312

57

1 to 23

Rockley View

Court

41

2

The Old Gate House

1

7

11

15

21

11

18

15

7

23

245

11

227

12

2

15

El Sub Sta

25

10

26

223

8

212

209

1

234

183

185

1a

250a

252

Mel

reen

266

1

4

250

19

44

2

18

1

51

20

37a

39

15

46

18

37Hall

14

23

Wood View

Drill

14

45

9

14

31

10

24

2

1

1

14

2

1

Strafford Grove

13

1 7

Eng

1

6

Wks1

3637

13

304

Birdwell Common261Shelter

2

259

31

17

3

334

Garage

311

333Warehouse215

197

222

216

19

280

292

268

25

32

Clinic

4

11

27

32

Priest Royd

20

5748

ETL

El Sub Sta

Hopper

HighwaysDepot

El

Park

RockinghamBusiness

Sub Sta

El Ps

Path

LB

Mast

(disused)Birdwell Quarry

Obelisk

Path

Subway

143.3m

140.0m

144.4m

134.8m

138.2m

HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3HN4/3

Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

DEA

RN

E VA

LLEY

PAR

KWAY

A 61

95

A 61

A 61

NEW ROAD

MOOR LANE

WESTWOOD NEW ROAD

WALKER ROAD

(Aided)

SchoolLower

Ho

St Peter's

59 65

Primary School

C of E

Tankersley

The Old

School House

57

9

1

33

23

Hangsman Stone Bar

6

7

Farm

13

7 1

61

71

4

1

8

BIRDWELLROUNDABOUT

Post

Tankersley Common

Tank

ersl

eyG

arde

n of

Res

t

TCB

LB

Path

Sinks

Tank T

op Brid

ge (F

B)

136.0m

139.9m

142.7m

BARNSLEY MBC - Strategy Growth & RegenerationScale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

Assistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

A 6135

A 61

Scale 1: _ _ _ _ _ _ _ _ _$

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Page 99: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Dra

in

Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

Path

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

WorksTk

3

2

Tank

Path (um)

143.2m

Cro

wn c

opyright. U

nauth

orised r

epro

duction infr

inges C

row

n c

opyright and m

ay lead to p

rosecution o

r civ

il pro

ceedin

gs. 100022264. (2

012)

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

TINKER

LAN

E

120

57

108

112

110

Hoyland Common

Track

Allotment Gardens

TL

TINKER

LAN

E

104

13

57

17

55

108

143.8m

REGENT CO

URT

CR

OS

S K

EY

S L

AN

E

SHEFFIELD ROAD

93

3

19

12

2018

11

(PH)

Cross Keys Inn

Posts

145.4m

147.8m

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

Cro

wn c

opyright. U

nauth

orised r

epro

duction infr

inges C

row

n c

opyright and m

ay lead to p

rosecution o

r civ

il pro

ceedin

gs. 100022264. (2

012)

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

STEELE STREET

SALE STREET

REGENT STREET

REG

EN

T S

TR

EET

1

2

56

Regent Mews

73

2

11

27

39

31

20

24

12

31

21

30

21

11

30

23

18

20

67

53

49

61

65

26

10

22

11

Garage

Tra

ck Allotment Gardens

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

STEELE STREET

SALE STREET

16

72

7

2

3

19

76

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Rockingham Community Hall

BARNSLEY MBC - Strategy Growth & RegenerationAssistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

1110

11

BARNSLEY MBC - Strategy Growth & Regeneration

Scale 1: _ _ _ _ _ _ _ _ _

10

Scale 1: _ _ _ _ _ _ _ _ _

#

Page 100: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

HODROYD LANE

HODROYD CLOSE

ENG

INE LAN

E

ENGINE LANE CLOSE

Track

SOUTHGATE

COLLIE

R ROAD

A 6195

Works

7

22

ne Farm

1

Engine Lane Farm

ETL

Pond

L Twr

El PsPath (um)

El Ps

Tanks

Path (um)

Chy

L Twr

WB

TWO GATES

ROUNDABOUT

tment Gardens

ETL NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2NE4/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 101: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

OAK ROAD

ASH ROAD

AY

HAZLEDENE ROAD

PONTEFRACT ROAD

ROAD

TOLLGATE CLOSE

HAZLEDENE CRESCENT

HAZLEDENE CRESCENT

PONT

EFRA

CT

THE BRICKYARD

EAK AVENUE

20

1

4

21

7

2

11

22

13

PH

25

2

Shelter

22

6

14

10

1

12

11 9

2

13

Warehouse

33

Edenhurst

3

1

1

2

5

Savana

20

7

30

19

32

26

29

23

32

20

22

14

12

32

5

13

13

(PH)

3

Fox and

Hound

s

2PCs

12

7

48

Westholme

23

46

23

41

39

28

42

ClubWorkin

g Men'sShafton

38

Shafton Primary School

1

1

16

33

16

20

14

27

18

ExchangeTelephone 24

29

36

56

50

48

28

Bus Depot

Jocalayne

The Bungalow

43

House

8

8

45

Marlgrae 2

35

27

25

36

30

10

37

6

10

6

4951

MS

Playground

LB

Shafton Two Gates

WEETSHAW LANE

ROUNDABOUT

El Sub Sta

Shafton Two Gates

77.7m

7

79.0m

BM 77.54m

74.8m

77.2m

79.3m

78.7m

78.6m

NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3NE4/3

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 102: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

GR

EENSID

E

CORONATION AVENUE

QUEEN'S DRIVE86

19

44

45

938

66

7

92

59

73

100

67

23

1113

17

2

15

20

7

4

Shelter

3

1

34

31

97

98

25

Pumping Station

The Singing Man(PH)

35

16

10

1 to 3

17 to 18

19 to 27

Sandy Bridge

Hemp Dike

ETL

Sandybridge Dyke

Track

Drain

Track

The Bank

Issues

LB

Industrial Estate

Path (um)

57.8m

61.0m

63.5m

NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4NE4/4

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 103: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

ENBANK WALK

ROAD

SPRINGFIELD

HIGH STREET

ACORN WAY

KIN

GS

WAY

60

56

61

39

HNu

Cloist

2

54

1

5052

S

64

1

83

7

72

71

74

51

1

112

49

4143

1

23

47 49

39

51

41

45

43

37

108

Factory

Garage

93

86

96

82

102100

70

Milefield Primary School

86

98

88

83

1

Hall SteadsNursing Home

95

Factory

North View

FB

FB

Playground

Sinks

Drain

SewageWorks

38.8m36.8m

NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5NE4/5

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 104: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

PRIN

GVALE R

OAD

A 6195

PARK SPRING RO

AD

PARK SPR

ING

RO

AD

CLAYBU

RN

RO

AD

SPRING HILL ROAD

1 to 7

Spring Park

Works

C1

B7

GrovePark

B9

A1

A3

B1

C5

B2

El Sub Sta

El Sub Sta

Pond

Water

n

El Sub Sta

ROUNDABOUTCOLLIERY

GRIMETHORPE

El Gen Sta

MP.5

Dismantled

Water

Drain

51.8m

NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6NE4/6

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 105: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Dra

in

Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

Path

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

WorksTk

3

2

Tank

Path (um)

143.2m

Cro

wn c

opyright. U

nauth

orised r

epro

duction infr

inges C

row

n c

opyright and m

ay lead to p

rosecution o

r civ

il pro

ceedin

gs. 100022264. (2

012)

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

TINKER

LAN

E

120

57

108

112

110

Hoyland Common

Track

Allotment Gardens

TL

TINKER

LAN

E

104

13

57

17

55

108

143.8m

REGENT CO

URT

CR

OS

S K

EY

S L

AN

E

SHEFFIELD ROAD

93

3

19

12

2018

11

(PH)

Cross Keys Inn

Posts

145.4m

147.8m

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

Cro

wn c

opyright. U

nauth

orised r

epro

duction infr

inges C

row

n c

opyright and m

ay lead to p

rosecution o

r civ

il pro

ceedin

gs. 100022264. (2

012)

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

STEELE STREET

SALE STREET

REGENT STREET

REG

EN

T S

TR

EET

1

2

56

Regent Mews

73

2

11

27

39

31

20

24

12

31

21

30

21

11

30

23

18

20

67

53

49

61

65

26

10

22

11

Garage

Tra

ck Allotment Gardens

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

STEELE STREET

SALE STREET

16

72

7

2

3

19

76

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Rockingham Community Hall

BARNSLEY MBC - Strategy Growth & RegenerationAssistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

1110

11

BARNSLEY MBC - Strategy Growth & Regeneration

Scale 1: _ _ _ _ _ _ _ _ _

10

Scale 1: _ _ _ _ _ _ _ _ _

#

Page 106: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

BOSV

ILLE

STR

EET

BERRYWELLAV

CASTLE CLOSE

STR

EET

BEL

MO

NT

DR

IVE

USKER CLOSE

CORUNNA VIEW

GREEN ROAD

CAS

TLE

QUEEN ST

SHEFFIELD ROAD

INCHBURN CRESCENT

DALBY CROFT

GREE

N AC

RES

LAIRD

S WAY

WESTACRE

CASTLE LAN

E

CH

AUN

TRY

AVEN

UE

CRESCENT

WESTGATE

SOU

THG

ATE

FULL

SHAW

BA

NK

WAY

MOSSLEY PLACE

WHEATCROFT GARDENS HIGH FIELD KNOLL

INCHBURN

PLACE

CO

TEFI

ELD

HEATHERCLIFFE

ASHFIELD CLOSE

LON

G F

UR

LON

G

LADYSHAWCRESCENT

CH

UR

CH

VIE

W R

OAD

EASTFIELD AVENUE

SHEF

MEARS CLOSE

GREENBROOK PLACE

RST

BAN

K

ESS

7

6

15

2

112

11

24

8

2

14

2527

7

7

2

6

11

11

15

5

8

4

1010a

1412

1 2 3

4

Tank

Little Freddie's Day Nursery

Fire Station

Amb Sta

23

27

28

1

21

16

24

37

31

15

46

30

36

26

22

5

26

18

5

2

1 to 1

9

DunstoneHeights

10

117119

Works

29

49

41

57

36

37

22

14

15

23

547

1

8

11

7

65

51

61

Penistone Station

2

42

2

41

40 38

37 39

22

18

24

14

1

11a

1511

17

5

7

7

12

1

21

25

2

23

19

26

21

31

14

Green

FarmCastle Green

125

137

47

55

118

89b

89c

35

9

23

ESS

14

25

25

11

45

30

15

35

36

1

1

11

3

2

238

240

33

43

845

47

1

15

SubSta

El

2

206

208

220

1

188 19

6

4

11

162

1

142

152

178

1

17

16

1

Castle

132

13

14

10

2

30

130

128

2

70

18

19

63

29

9

8

2

Pavilion

4

51

52

15

11

11

14

36

PO

22

12

2826

52

76

31

2

6

55

2

43

1

67

11

10

27

2

1

7

15

21

53

68

51

39

Bleak House

Castlemare

Works

2

2

1

7

1

10

5

Elmroyd Court

28

16

15

33

19

11

15

7

9

18

12

6

101

1

2

2 to 3

2

23

1

31

PenistoneCourt

14

1 to 6

2

8

1115

26

22

23

21

30

26

25

89

15

3

11

29

12

ESS

29

80

ey View

2

91

87

78

7579

2 6

7

39

95

SL

LB

Trac

k

USKER CLOSE

Path (um)

GroundSports

GroundRecreation

Terraces

TCB

CORUNNA VIEW

Path (um)

Cycle Path

FULL

S HA

W B

AN

K

BELM

ON

T D

RIV

E

Path

Games Court

SL

SL

Playing Field

CASTL

Drain

LB

Burn

ett C

lose

TCB

SL

Games Court

SL

StoneFB

Playground

Huddersfield Junction

212.5m213.0m

213.2m

212.8m

205.7m

207.6m

200.9m

209.8m

209.8m

202.7m

PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1PE4/1

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 107: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

WOODKIRK

B 6462

SPRIN

GWOODVI

EW

DON STR

EETKNOW

LES S

TREET

CLOSE

SPRINGVALE GROVE

BungalowThe

20

Works

Springvale Nursery

Works

2

6

1

Works

7

41

23

44

30

12

55

Tank

280

112

116

85

87

Works

106

PH

24

81

& Nursery

Sub Sta

2

El

Springvale

Primary School

51

25

91

176

99

30

1

11

137a

122

128

ESS

12

2

28

27

1

3335

38

15

17

11a

139

131

119

5

121

208

2

91a

5

Methodist ChurchSpring Vale 18

109

Garage

Works

180

184

107

107a

246

256

El Sub Sta

139a2

24

11

27

22

15

46

45

33

96

145

86

139 262

76

114

14

264

1266

54

Works

9

1511

32

24

Kirk

wood

Beck

Playground

Tanks

TCB

SPRING VALE

WB

Compound

(Foot)

Cricket Ground

River Don

FB

Waste

Boulder Bridge

Disposal

Path

(um

)

Pipeline

Track

Drain

Path (um)

Path (um)

Pipeline

HoppersConveyor

Issues

Path (um)

LB

SPRING VALE

Track

Path (u

m)

Track

203.6

m

204.6

m

203.7m

m

198.4m

203.3m

206.3m

PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2PE4/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 108: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

WOODKIRK

B 6462

SPRIN

GWOODVI

EW

DON STR

EET

SHEFFIELD ROADKNOW

LES S

TREET

CLOS

BERRYWELLAVENUE

GREEN

ACR

ES

SPRINGVALE GROVE

20

Works

Works

2

6

6

15

1

Works

7

41

23

30

12

Tank

280

112

116

85

87

Works

106

PH

24

24

81

38

42

1

& Nursery

Sub Sta

2

El

Springvale

Primary School

BerryWell

25

91

176

99

30

1

11

137a

122

128

ESS

14

15

7

137

Kirkwood House

12

2

28

27

1

3335

38

15

17

11a

Works

139

224

141

Laurence

131

119

5

121

208

2

91a

5

Methodist ChurchSpring Vale 18

109

Garage

Works18

0

184

107

107a

238

1246

256

240

El Sub Sta

33

43

Works

8

45

47

1

15

SubSta

17

31

El

220

139a2

9

24

11

27

22

15

45

33

96

145

86

139 262

76

114

14

264

1266

54

9

15

22

11

14

32

36

24

PO

22

40

2826

69

52

27

Playground

Tanks

TCB

SPRING

Quarry(disused)

Pipeline

Drain

Cycle Path

HoppersConveyor

Path

(um

)

Bridge

LB

MP 29

SPRING VALE

Kirkwood

Barnsley

Path (um)

Path

Subway

CASTLE GREEN

Drain

El Sub Sta

Burn

ett C

lose

Track

d

203.6

m

204.6

m

212.8m

205.7m

203.7m

198.7m

198.4m

203.3m

206.3m

PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3PE4/3

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 109: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

WESTFIELD AVENUE

NEW SMITH

HIGH BANK LANE

ROAD

HIGHBAN

A 628

LANE

HEDGE HILL MANC

HORNTHWAITE HILL

ROAD

ANE

LEAPINGS LANE

MILL LANE

SAVILLE

17

36

2

14

13

4

29

33

28

ViewSyke

El Sub Sta

The Bungalow

213

138

Plumpton Mills

126 1

2127

31

6

25

93

25

24

15

19

Ash Lea

Thorpe Royd

9

115

El Sub Sta

111

Works

22

5

Phoenix

113

25

21

29

47

26

37

23

38

Stonele

igh

135

133123

35

33

102 86

108

19

100106

57

8

139

149

118

116114

10

167

18

37

3

12

3331

171

181

191

Gardeners

207

203

Cottage

House

The

House FarmFar Bank

Leapings Lodge

Hornthwaite Water M

Church

Hse

97 to 109

111

95

177

151a

136

165

155

173

148

161

PH

Leapings View

Leapings Cottage

1

Plumpton Lodge

Plumpton

Ct

2

3

Plumpton

(um

)

Path

Ford

FB

Weighbridge

Thurlstone

LB

Path

Plumpton Mills

Weir

TankSluice

Weir

Path

Cycle Path

(disused)Quarry

Cycle Path

Path

Cycle Path

FB

Pond

Tank

217.6m

266.7m

221.6m

262.1m

254.8m

247.5m

229.8m

226.8m

PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4PE4/4

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 110: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

10

Path

Penis

tone

MP .25

Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

B 6462

EASTFIELD AVENUE

SHEFFIELD ROAD

WENTW

ORTH MEWS

Penistone Station

2

1

13

15

(PH)

Wentworth

Arms

42

39

7

Works

52

17

PenistoneCourt

1 to 6

21

Allotment Gardens

SL

Via

duct

Penis

tone

Stone

210.9m

207.6m

PR

Cro

wn c

opyright. U

nauth

orised r

epro

duction infr

inges C

row

n c

opyright and m

ay lead to p

rosecution o

r civ

il pro

ceedin

gs. 100022264. (2

012)

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

QUEEN S

TSHEFFIELD ROAD

LA

IRD

S W

AY

8

7

25

27

7

Tank

Little Freddie's Day Nursery

Fire Station

Amb Sta

Penistone Station

31

6

2

1

Works

4

1

Valley View

Depot

207.6m

202.7m

PR

Pavilion

Tra

ck

FB

INCHBU

RN C

RESC

ENT

HEATHERCLIFFE

CH

UR

CH

VIE

W R

OA

D

MEARS CLOSE

26

22

47

65

51

61

42

40 38

22

18

24

8

2

Pavilion

4

112

10

28

16

15

33

19

11

15

1

31

14

26

2 6

7

Ground

Sports

GroundRecreation

Terraces

TCB

Path

Games Court

SL

Games Court

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

Cro

wn c

opyright. U

nauth

orised r

epro

duction infr

inges C

row

n c

opyright and m

ay lead to p

rosecution o

r civ

il pro

ceedin

gs. 100022264. (2

012)

This

map is r

epro

duced fro

m O

rdnance S

urv

ey m

ate

rial w

ith the p

erm

issio

n o

f O

rdnance S

urv

ey o

n b

ehalf o

f th

e C

ontr

olle

r of H

er

Maje

sty

’s S

tationary

Offic

e ©

DALBY CROFT

LA

IRD

S W

AY

WESTACRE

WAY

MO

SSLE

Y P

LACE

HEATHERCLIFFE

ESS

11

2

14

23

16

24

37

31

22

14

15

23

5

1

8

11

7

61

12

76

31

2

67

11

10

27

2

1

7

15

21

53

68

51

39

29

80

SL

Cycle Path

SL

Playground

Huddersfield Junction

200.9m

BARNSLEY METROPOLITAN BOROUGH COUNCIL

STRATEGY, GROWTH & REGENERATION

GR

EE

N A

CR

ES

6

15

24

38

9

14

36

PO

22

40

2826

52

55

43

27

LB

198.7m

200.9m

BARNSLEY METROPOLITAN BOROUGH COUNCIL

PLACE

CO

TE

FIE

LD

101126

BARNSLEY MBC - Strategy Growth & RegenerationAssistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

MO

SSLE

Y P

LACE

BARNSLEY MBC - Strategy Growth & Regeneration

Scale 1: _ _ _ _ _ _ _ _ _Scale 1: _ _ _ _ _ _ _ _ _

#

Page 111: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

MEADSTEAD FOLD

D CRESCENT

OAKWOOD

ME

ADS

TEA

D D

RIV

E

WIN

MAR

ITH

CO

URT

RISE

HALLCROFT

CR

OFT AVEN

UE

HIGH STREET

CRESCENT

UE

AVENUE

HO

LLYC

RO

FT

CROPTON ROAD

JESMOND AVENU

1812

Mens Club

Fire Station

510

8

35

47

57 82

18

16

9

10

24

33

3

32

1

4

168

31

44

5646

70

12

14

15

1718

33

7

8

5

25

20

15

1

34

10

40

49 37

44

2

24

Alexandra Working

8

1

7

53

13

3331

11

9

6a6

El Sub Sta

2

14

Meadstead

41

21

2

36

2

Nursery

2

14

20

Surgery

11

50

11

16

6

11

1 12

1

1B

14

20

35

Royston Meadstead Primary School

1 to 50

stmeads

69.2m

75.0m

72.2m

RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1RO4/1

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 112: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

LUN

D H

ILL

L AN

E

LUND HILL LANE

B 6428

BISLEY CLOSE

LINESIDE LANE

MIDLAND ROAD

LAN

E

CR

OSS

BISL

EY C

LOSE

CALDERVALE

THE

AVE

NU

E

GODLEY CLOSE

ALFR

ED

STR

EET

ROBIN LANE

POPLAR

TERRAC

E

LUN

D H

ILL

LAN

E

348

20

15

10

12

16

6

ESS

14

(PH)

Drift Mine

Royston

269

Whincover View

7

315

3

1

40

9

25

350

1

344342

4

333

321

Shelter

Club

331

346

12

1

317

5

2

14

3

12a

11 13

16

319

5

Canal Lodge

Ship Inn

16

1

15

6

4

12

22

1

9

6

The Lilacs

34

14

35

HouseStation

276

7

11

68

5

4

43

312

320

291a

279

291

House

293

York

314

305

27

296

Glen Arran

263

2

298

157

11

35

12

28

2

14

1210

a

Club

8

14

6

286280

251

45

155 3

Pump House

1

The Laurels

El Sub Sta

4

2

Monckton Grange

27

24

2

2

15

4

39

4

63

51

237

266

225

243

270

13

Whincover

7445

2

4951

1

1

857

77

65

56

308310

29

1115

2

5

26

Working Men's

Midland

5

Trac

k

El Sub Sta

Chy

Pond

Path (u

m)

Water

Coal Yard

Tanks

WB

Travelling Crane

Drain

El Sub Sta

Tank

Chy

Works

Tank

Tanks

Tanks

Tank

Conveyor

Chy

Tank

Tanks

TankMP .5

Drain

Track

Station Terrace

SP

GasGov

SP

Sewage Works

Drain

Lund Hill

Path (um)

Reeds

Drai

ns

Path (um)

Car Park

Playing Field

Dis

mt d

Rly

Tip

Drain

Trac

k

(disused)

Pond

Track

Dam

Drain

Barnsley Canal

(disused)

TCB

Path (u

m)

Coronation Avenue

Builder's Yard

Midland Road Bridge

LB

LB

Drain

Ponds

AllotmentGardens

ent GardensPath (um)

Notton Cut

(dis used)C

a na l

Barnsley

Ppg Sta

Sks

72.8m

72.8m

71.7m

67.6m

71.1m

70.6m

72.0m

69.3m

51.3m

49.5m

65.9m

53.3m

50.2m

58.0m

56.5m

59.1m

63.8m

RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2RO4/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 113: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

MIDLAND ROAD

LAN

E

CR

OSS

CALDERVALE

THE

AVEN

UE

ALFRED

STREE

T

6

(PH)

269

Whincover View

7

315

3

5

1

344342

4

333

321

Shelter

331

346

12

1

317

5

2

14

3

12a

11 13

16

319

5

Canal Lodge

Ship Inn

16

1

15

6

4

12

22

1

9

6

The Lilacs

34

14

76

8

5

312

320

291a

279

291

House

293

York

314

305

27

296

Glen Arran

263

2

298

157

11

35

28

2

14

Club

Whincover

308310

29

ng Men'sdland

Track

Station Terrace

GasGov

Drain

TCB

Path (u

m)

Coronation Avenue

Builder's Yard

Midland Road Bridge

(disus e d)C

anal

Barnsley

51.3m

53.3m

56.5m

59.1m

RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3RO4/3

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 114: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

HEI

GH

TS V

IEW

A 629

HALIFAX ROAD

Springfield

Garage

BungalowThe

Petwyn

Elmhirst

Farm

Cottages

Thurgoland

Don Cote

14

GlenDevon

11

31

5

1

1

35

Laurels

The

15

3

Craglyn

Atoamere

Pump

GP

MemorialWar

219.2m

221.3m

217.4m

WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1WR9/1

Layout width 175mm

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

ROO

KERYW

AY

HEI

GH

TS V

IEW

CRAG VIEW

25

24

15

3611

9

Cote

Field

12

Carthan

Westmoor

Cotefield

Dalton

2

Tapiola

3

8

1

7

2

2

House

Issues

BARNSLEY MBC - Strategy Growth & RegenerationScale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILSTRATEGY, GROWTH & REGENERATION

Cro

wn

copy

right

. Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s. 1

0002

2264

. (20

12)

This

map

is re

prod

uced

from

Ord

nanc

e S

urve

y m

ater

ial w

ith th

e pe

rmis

sion

of O

rdna

nce

Sur

vey

on b

ehal

f of t

he C

ontro

ller o

f Her

Maj

esty

’s S

tatio

nary

Offi

ce ©

Assistant Director: Mahmood AzamPO Box 598, Barnsley. S70 9EXTel: (01226) 772621

Scale 1: _ _ _ _ _ _ _ _ _$

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Page 115: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

ROSE

BARN

SLEY RO

AD

GROVE

SADLER'SGATE

BRADBERRY BALK

LANE

ROSE PLACE

MO

OR

BANK

VIE

W

ALD

HA

M H

OU

SE

LA

NE

BARNSLEY ROAD

MOORBANK ROAD

MITCHELL

ROAD

MO

ORB

ANK

CLO

SE

ROY KI

LNER

ROAD

CRESCENT

BARNSLEY ROAD

BARNWELL

ROY KI

LNER

ROAD

1

Sub

6

Aldham Cottages

28

Works

32

44

10

Mou

nt T

abor

Wes

leyan

217

Refor

m C

hurc

h 227

215

229

12

11

40

28

1

25

26 201

6

Aldham

Cottages

Garage

1

Mitchell and Darfield

243

Social Club

1

19

18

17

7

6

70

21

23

58

5211a

35

25

15

11

12

25

Aldham Industrial Estate

Shelter

15

20

12

21

14

253

to 2

63

PO

7

2

154

12

El Sub Sta

2

8

5

10

49

130

1

22

1

6

2

2

17

144

38

46

10

132

34

140

15

Shelter

25

El Sub Sta

1

191

191

184

216

204

2

193

194

197

14

14

2

2

13

4

1

10

11a

15

35

62

37 19

41

70

68

59

20

El Sub Sta

14

17

265

to 2

75

120

23

River Dove

Tip

(disused)

ET

Dismantled Railway

Canal (disused)

LB

Gas Governor

Path (um)

Obelisk

Path

ETL

Path

LB

Travelli

ng Cran

e

Bowling Green

Playing Field

Tank

Post

Path (um)

Playing Field

Playing Field

Mitchells Enterprise Centre

Allotment

WHITE ROSE ROUNDABOUT

TCB

El

Sub Sta

Gardens

Dismantled Railway

49.5m

35.8m

36.8m

38.6m

44.4m

45.5m

43.6m

40.5m

43.6m

WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2WW5/2

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 116: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

LEYFIELD PLACE

HAL

L C

RO

FT

BR

AM

HA

M C

RO

F T MIL

LMO

OR

RO

AD

VALLEY ROAD

CALVERLE

Y GARDENS

BAYFOR

D W

AY

COTT

ERDA

LE G

ARDE

NS

STATION R

OAD

VALLEY ROAD

ROAD

PARK HILL

EDWARD STREET

FERNHALL CROFT LOW CROFT

HAVERHILL G

ROVE

SWALEDALE

DRIVE

STATION R

OAD

STATION ROAD

VALLEY R

OAD

LOW CROFT

BOW ROYD

1I

7

22

10

6

27

1

10

9

25

21

2

58

1

8

16 14

7

15

11

19

18

5

311

2

10

23

18

2

11

2824

2

10

1

23

1

2

43

45

49

12

26

25

19

34

35

27

42

15

19

14

20

16

11

15

12

22

7

2

19

12

1

1

48

52

44

16

El

1

77

2

9

7

6

8

10

3

11

2

Works

Works

Works

1

15

9

19

1

6

26

1 to

20

31

2

1a

2b

2a

28

26

12

140

53

76

8565

1

15

17

5

11

5

6

16

19

19

PH

112

11

17

120

110

126

15

5

121

PH

138

132

15

Gas Governor

73

50

79

67

38

71

77

69

6

78

64

84

Stand

41

Garage

32

57

14

1

2

34

45

40

1

4

2

26

Factory

Gas Governor

Club

33

Netherwood(advanced Learning Centre)

4

1

2a

Drain

Post

Path (um)

Stonyford Bridge

Path (um)

Track

Willow Gardens

Posts

El Sub Sta

Yard

Builder's

Dismantled Railway

Running Track

Kart Racing Track

Sports Ground

Bulling Dike

Path (um)

River Dove

27.2m

28.8m

28.7m

25.7m

27.0m

26.1m

37.6m

WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3WW5/3

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 117: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

STON

YFOR

D R

OAD

INGS ROAD

TOW

N LAN

DS

CLO

SE

NS

STATION ROAD

8

2

3228

Deboorah

36

56

42

7

21

1115

25

1

27

41 to 51

29 to

39

53 to 63

50

62

69

73

10

43

45

49

12

26

CouncilDepot

16

17

12

10St M

ichael and All Angels

Catholic Prim

ary School

2

El Sub Sta

13

1

162

131

8

77

116

140

2

152

1

14

25

8a

53

76

39

65

60

Shelter

121

138

Drain

Playing Field

Wombwell Ings

Sewage Works

Bulling

Playground

Drain

FB

Dra

in

Dike

LB

TCB

26.8m

27.2m

26.3m

WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6WW5/6

BARNSLEY MBC - Strategy Growth & Regeneration

Layout width 175mmB

arns

ley

MB

C L

icen

ce N

umbe

r LA

1000

2226

4 - 2

013

Scale 1: _ _ _ _ _ _ _ _ _

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

BARNSLEY METROPOLITAN BOROUGH COUNCILPLANNING & TRANSPORTATION SERVICE

Una

utho

rised

repr

oduc

tion

infri

nges

Cro

wn

copy

right

and

may

lead

to p

rose

cutio

n or

civ

il pr

ocee

ding

s.R

epro

duce

d fro

m th

e O

rdna

nce

Sur

vey

map

ping

with

the

perm

issi

on o

f the

Con

trolle

r of H

er M

ajes

ty's

Sta

tione

ry O

ffice

© C

row

n co

pyrig

ht.

Assistant Director: Mahmood AzamPO Box 604, Barnsley. S70 9FETel: (01226) 772601

Page 118: Independent Examination of the Barnsley Local Plan1 1. Hearing Statement 1.1 This Hearing Statement has been prepared on behalf of Hargreaves Services (UK) Ltd (HSUL) in respect of

Turley Office


Top Related