Ideas and OpportunitiesSindh the Land of Endless Opportunities
Sindh Board of InvestmentGovernment of Sindh
The Economy
• 50% Urbanization
• Diversity in religion, language and ethnicity
• Strong Administration
• Karachi
• National financial and business hub
• Port City
*World Bank Estimates 2013
The People
• Upward Social Mobility
• Increasing Total and Female Labour Force Participation
• Increasing Literacy Rates
Legislation and Justice
Freedom of Information Act 2013 Passed in 2006 Implemented through section 154 of The Sindh Local
Government Act, 2013 The Sindh Environmental Protection Act 2014
Aims to respond to the modern challenges of global warming and environmental pollution
The Sindh Right of Children to Free and Compulsory Education Act, 2013 First province to pass law for provision of free and
compulsory education. Ensures free and compulsory education to all children
of age five to sixteen on state expense Private schools are bound to provide free education to
20 per cent students of the class strength The Sindh Child Marriage Restraint Act 2013
Aims to protect the rights of children by setting a marriageable age (18 years) for them
Declares marriage under 18 years an offence The Sindh Prevention and Control of
Thalassemia Act 2013 Contributes to public health by ensuring that parties
contracting a marriage undergo Thalassemia tests Sindh Witness Protection Act 2013
Ensures protection of witnesses in criminal cases
The Role of SBI
Institutional Arrangement
SBI has been established as : The principal Investment Promotion
Agency of the province of Sindh to facilitate Foreign & Local Businesses
A bridge between the Government & the business community
Provide Framework for implementation of Investment Policy of the Federal Government and to support provincial endeavors
Provide One – Window system at the Provincial level for facilitation of local and foreign investors seeking land, approvals, concessions, facilities and support from the Provincial Departments and authorities
Public Private Partnership Model Sindh PPP Act 2010
1st PPP law in Pakistan Provides legal cover to the
Institutional Framework PPP Policy Board PPP Unit PPP Projects Departmental PPP nodes
Regulates the contractual relationship between public and private sectors
Covers processes regarding project approval and spending from: PDF (Project Development Fund) VGF (Viability Gap Fund)
Institutional Arrangement
PPP Ventures in Sindh
PPP Projects in Sindh Completed Hyderabad MirpurKhas Dual
Carriageway (HMDC) Project : The Project road is 60 km long with 8
bridges and 62 culverts It was financed through a mixture of
private party's equity (30%), GoS sub-debt (30%) and commercial bank debt (40%)
NICH Safety & Security National Institute of Child Health (NICH)
is the largest tertiary care and teaching hospital for children in Karachi Sindh.
Its catchment area covers 20 million people in Karachi alone and it deals round the clock with 300,000 patients per annum
Special Economic ZoneAuthority Special Economic Zone (SEZ)
Authority under SEZ Act ,2012 Established by Government of Sindh
Headed by Chief Minister of Sindh Incentives
Exemption on custom duties/taxes on capital goods imported into Pakistan for the development
Exemption from all taxes on income generated from the SEZ for a period of 10 years
Additional benefits to SEZs, Zone Enterprise, regions or sectors that promote hi-tech industries or particular under developed regions of Sindh
Authorised SEZs under development Khairpur Special Economic Zone Bin Qasim Industrial Park Korangi Creek Industrial Zone
Institutional Arrangement
Sindh Enterprise Development Fund
The Role of SEDF
GoS established (SEDF) as a company with an aim to:
Support entrepreneurship development based on Sindh's competitive advantage
Introduce technology & bring value addition in non conventional yet vital sectors of the economy by extending technical and credit assistance.
Livestock, Dairy, Fisheries and Agriculture (LDFA) is a signature event of SBI
Institutional Arrangement
BMR Scheme for Rice Husking Mills in Sindh
Agro based Projects
SEDF has launched BMR scheme for ailing Rice Husking Mills in collaboration with State Bank of Pakistan and Participating Financial Institutions (PFIs). Seven rice mills have been approved under this Scheme.
Institutional Arrangement
SEDF Approved Projects
S. # Name Project SizeIn Million Capacity
SEDF Subsidy
In MillionBank
1 Red Chilli Growers at Kunri & Adjoining Areas Rs.229 Mn 8000 tons Rs.69 Mn Habib Bank
2 Dairy Land Pvt Ltd, Thatta Rs.180 Mn 2000 cows Rs.19 Mn Habib Metropolitan Bank
3 Reliance Exim (Pvt) Ltd Unity Group
Rs.190.00 Min
30,000 tons annually
Rs.14.53 Mi
Habib Metropolitan Bank
4 National Seed Ventures, Kotri Industrial Area Rs.170 Mn
25000 tons per annum
Rs.23.3 Mn
Habib Bank
5 BlueScope Refer Solution at Jinnah International Airport
Rs.140 Min 9,000 Cu Mtr Rs.14 Mn
6Project Volaille: Establishment of Environmentally Controlled
Poultry Farm
Rs.115.602 Mn
120,000 birds/flock
Rs.8.95 Mn
MCB
7 The Organic Meat Company (Pvt) Ltd
Rs.199 Mn 350 tons Export per Month
Rs.21.38 Mn
Habib Bank & Faysal Bank
8 Haq Bahoo Sultan Rice Mill
Rs.169 Million 10 tons / hr Rs.8.6 Mn Habib Bank
9 Shrimp Farming in Mirpur
Sakro Rs. 200 Mn 250 tons x 2
crops
Priority Clusters : Dairy & Livestock, Poultry, Fisheries, Mango, Banana, Dates, Guava, Rice, Cotton, Red Chilies
11
Strengthening Social Sector Government of Sindh believes in strong
delivery in social sector by encouraging the participation of private sector.
InitiativesHealth 163 health institutions are being handed over
to private hospitals/NGO’s on PPP basis. Following are main private partners:
Indus Hospital Hands Pakistan Integrated health services Merlin International Amman Foundation
Education (EMO) 120 education institutions are being handed
over to private education institutions/NGO’s
Social Sector
Energy Resources
12
COAL Wind Corridor
180x60KM Jhimpir Wind CorridorPotential for generating 60,000 MW5 Projects of 256 MW are commissioned into national grid and projects of 2000 MW are in progress
Solar
One of the highest solar insulation in the world ranging from 5 KWh-7.5/m2/per day
180
Km
60 KM
Mass Transit Projects
Public Transport Vehicles are 4.5% of all road traffic
More than 9 million people (45%) travel in public transport in Karachi
Proposed Projects Karachi Circular Railway (KCR) KCR extension to Bin Qasim Two Mass Rapid Transits (MRTs 6 Bus Rapid Transits (BRTs)
14
Sindh Solid Waste Management Board Government of Sindh has established
Sindh Solid Waste Management Board through Act to deal with the problem of Solid Waste not only in Karachi but also in other cities of Sindh.
Sindh Waste Generation & Characterization
Karachi Waste generation is 12,000 tons per day and will grow significantly to 16,000 TPD (over 6 million TPY) by 2020.
Municipal Solid Waste Management in Other Cities of Sindh
Hyderabad 1500 tpd
Sukkur 800 tpd
Larkana 500 tpd
Solid Waste Management
15
Strategy to Collect Waste:
Front end Waste Collection 1. Door to door collection 2. Manual & mechanical sweeping 3. Transportation from community dustbins to
GTS 4. Washing 5. Revamping of Bin system
Back end Waste Collection 1. 6 Garbage Transfer Station (GTS) 2. Material Recovery Facility / Recycling 3. Engineered Sanitary Landfill sites (03 sites) 4. Waste to energy
a) Pyrolysis /incineratorb) Plasma Gasificationc) Refuse Derived Fuel (RDF)d) Compost / Biogas Plante) Landhi Cattle Colony Biogas Projectf) Diesel from Plastics
Solid Waste Management
16
8,921 acres of land have been allocated for Education City
20 local and foreign institutions have been allocated land for their campuses
Local and international educational institutions will provide appropriate solutions to meet Pakistan’s staggering challenge of providing excellent higher education
An opportunity to promote R&D for the private and public sector through partnerships and collaborations
Opertunity: 50 acres of land is earmarked for foreign
institutes
Sindh Education City
PPP Projects:Khairpur Khajoor Mandi (KKM) Project (PKR 4.5 Bn) Hyderabad Tando Muhammad Khan Dual Carriageway (PKR 6 Bn) Link Road 19.95 km long road connecting Super Highway (M-9) & National Highway (M-5)(PKR 5Bn)
Blocks available in Coal Mining & Power GenerationBlock VII, Block XI, Block XII
Wind Energy Projects256.4 MWs have been commissioned Another 2000 MWs are under progress
Solar Energy Projects across Sindh 5 projects of 20 MWs each in PPP mode are under progress in five districts of Sindh
Opportunities in various sectors
Setup Agri Business projects by availing SEDF Financing Assistance
Transport Projects in Karachi:
Blue Line (JICA) estimated cost (Rs 20 bn)Red Line estimated cost (Rs 18 bn)Brown Line (MRT) estimated cost (Rs 100 bn)
Opportunities in various sectors
Thank You
Question and Answer