Transcript
Page 1: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 1

Page 2: ICT Construction Plan Evaluation and Reliability Assessment Part 2

ICT Construction Plan Evaluation and Reliability Assessment Part 2Entergy ICT Transmission Planning Summit

July 29, 2008Astor Crown PlazaNew Orleans, Louisiana

Page 3: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 3

Project is not included in

model

Code for Base Plan and Construction Plan Projects Indicated on Maps

BP08-036 = Project Number from 2008 Base PlanCP(2011) = 2008 Construction Plan and Expected In-Service YearDCP(2011) = 2009 Draft Construction Plan and In-Service Year

Map Legend

BP08-036 CP(2011)

DCP(2011)

Background Color Indicates Projects’ Inclusion In Case

Project is in 2017 model

Page 4: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 4

Page 5: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 5

Page 6: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 6

Page 7: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 7

NANA

DCP(2013)

Page 8: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 8

Page 9: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 9

Page 10: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 10

Page 11: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 11

Page 12: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 12

Page 13: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 13

Page 14: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 14

Page 15: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 15

Page 16: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 16

Page 17: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 17

Page 18: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 18

Page 19: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 19

Page 20: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 20

NANA

DCP(2013)

Page 21: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 21

Page 22: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 22

Other Areas

These concerns seen in real-time may be relieved by projects in the Base Plan, Construction Plan or Draft Construction Plan.

• Hot Springs-Bismark 115kV FTLO El Dorado-Longwood 345kV (Base Plan Project)

• Liberty-Gillsberg 115kV FTLO Franklin-Bogalusa 500kV (Construction Plan Project with ISD 2009)

• Hartburg-Inland Orange 230kV FLTO Hartburg-Cypress 500kV (Draft Construction Plan Project with ISD 2010)

Page 23: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 23

Base Plan Development Next Steps

• Stakeholder Comments

• Discuss Stakeholder Comments at September LTTIWG

• Present Draft Base Plan at October LTTIWG

• Finalize Base Plan and Post January 2009

Page 24: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 24

Steve PurdyLead Engineer, ICT Planning

[email protected]

Jason RussellEngineer II, ICT Planning

[email protected]


Top Related