PROJECT
DATE CLIENT9TH SEPTEMBER 2014
INTRODUCTION TO CONSTRUCTION INDUSTRY & DRAWING
ABDULLAH MAMODE . AMANDA CHIOG . BRIDGET HSU . CHAU XET NEE . CHAU KHANG WEI . NURAFIQAH ZARIFUL
TAYLOR’S UNIVERSITY
![Page 2: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/2.jpg)
![Page 3: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/3.jpg)
Bring together the design and budgetary requirements set by the client
Restrains of a site
Need of the building’s users
Limitations of materials into a unique
Balance design solution
![Page 4: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/4.jpg)
Ancient Egypt (3,050BC - 900BC)
Classical (850BC - 476AD)
Romanesque (800AD - 1,200AD)
Gothic Architecture (1,100AD - 1,450AD)
Renaissance Architecture (1,400AD - 1,600AD)
Rococo Architecture (1,650AD - 1,790AD)
Neoclassicism in Architecture (1,650AD - 1,790AD)
Art Nouveau Architect (1,890AD - 1,914AD)
Beaux Arts Architecture (1,895AD - 1,925AD)
Neo-Gothic Architecture (1,905AD - 1,930AD)
Art Deco Architecture (1,925AD - 1,937AD)
Modernist Styles in Architecture (1,900AD - ?)
Postmodernism in Architecture (1,972AD - ?)
![Page 5: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/5.jpg)
Degree Master
Register as graduate member with Pertubuhan Arkitek Malaysia (PAM)
and Register as graduate architect with Lembaga Arkitek Malaysia
(LAM)
LAM Part III Examination
Register as an Architect
Working experience
![Page 6: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/6.jpg)
RESPONSIBILITIES OF AN ARCHITECT
![Page 7: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/7.jpg)
Check that there are no other architect has been commissioned
State the scope of work & clients financial limits
Inform clients of the other professional services required
Answer queries where necessary
Agrees variation to the contract document, normally alterations to the design & specification
Attend site meetings, discuss delays & other problems which may be critical
Check quality and progress of work on site
Inspects samples of materials & fittings delivered to site
Conducts the clients round the site necessary
![Page 8: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/8.jpg)
Architect should seek full details of client requirements:
1. Nature size & function of proposed work
2. Decide time & financial limits of the projects
3. Prepare legal information - ownership of land, boundaries etc.
4. Prepare application for planning permission
5. Decide the members of design team involved
![Page 9: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/9.jpg)
Client Architect whether / not he is able to carry out the commission
Writing of the terms of conditions of the
appointment & request confirmation
He has adequate time staff, expertise
& finance
decideapproach
ensure
architect advice client
![Page 10: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/10.jpg)
ARCHITECT RESPONSIBILITY IN CONSTRUCTION PHASES
![Page 11: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/11.jpg)
Gathering all information required prior to begin design.
Scope of work would typically include;• site analysis, • measure up, • develop brief, • gather all council related
information,• advice on separate consultants
Required 1-2 weeks for this phase
![Page 12: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/12.jpg)
EXAMPLE OF PRE-DESIGN PHASE
![Page 13: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/13.jpg)
Begin design by relating requirements to the site.
Form the sketches for the preliminary design. Prepare proposed layout plans.
The feedback from the clients will be incorporated into the design and carried through into the Design Development Phase.
Requires 2-3 week for this phase.
![Page 14: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/14.jpg)
EXAMPLESOF SCHEMATIC DESIGN PHASE
![Page 15: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/15.jpg)
Begin and improve the detail design work.
Finalise the space planning (indoor and outdoor), exterior forms and materials used in the project.
Budget Estimation will review by Quantity Surveyor or Contractor.
Requires 2 weeks for this phase.
![Page 16: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/16.jpg)
EXAMPLESOF DESIGN DEVELOPMENT PHASE
![Page 17: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/17.jpg)
Further development of the design and the necessary documentation would be prepared as required.
Illustrate concept and details are required to obtain a PIM (Project Information Memorandum) from the local authority. Quantity Surveyor or
Contractor will provide actual quote based on complete Contract Document.
Architectural Drawing are presented and explained to the client.
![Page 18: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/18.jpg)
Prepare tender and contract documentation.
Answering queries from the various contractors and sub-contractors.
Analyze the received tenders and checking tender compliance to meet the standards.
Both the architect and the client evaluate and choose the best contractors for they construction.
![Page 19: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/19.jpg)
Site visit for inspecting the progression of work.
Administrating and certifying project payments.
Providing any additional drawings and details, as required to provide clarity on site.Approving final completion.
Administrating maintenance defects during the maintenance period.
![Page 20: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/20.jpg)
TYPtE OF ARCHITECTURAL DRAWING
![Page 21: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/21.jpg)
1. PRESENTATION DRAWINGFUNCTION : To explain a scheme & to promote its merits
![Page 22: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/22.jpg)
EXAMPLEOF PRESENTATION DRAWING
![Page 23: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/23.jpg)
EXAMPLEOF PRESENTATION DRAWING
![Page 24: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/24.jpg)
2. SURVEY DRAWINGSFUNCTION : To establish dimensions for the construction work
![Page 25: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/25.jpg)
ANOTHER EXAMPLE OF SURVEY DRAWINGS
![Page 26: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/26.jpg)
3. "AS-BUILT” DRAWINGSFUNCTION : To understand & emulate the great architecture known to architects
![Page 27: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/27.jpg)
4. WORKING DRAWINGS
FUNCTION : A COMPREHENSIVE SET OF DRAWING USED IN A BUILDING CONSTRUCTION PROJECT.
• Location Drawing
• Assembly Drawing
• Component Drawing
![Page 28: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/28.jpg)
EXAMPLESOF WORKING DRAWINGS (Location Drawing)
![Page 29: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/29.jpg)
EXAMPLESOF WORKING DRAWING (ASSEMBLY DRAWING)
![Page 30: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/30.jpg)
EXAMPLESOF WORKING DRAWING (COMPONENT DRAWING)
![Page 31: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/31.jpg)
Site Plan
Demolition Plan
Drainage plans & Schematics
Floor Plan
Elevations
Foundation plan
Floor framing plan
Roof framing plan
Roof plan
Sections
Construction details
Window & Door schedule
Electrical Lighting plan (base only as the best is to involve the lighting supplier / designer to provide same detailed input here)
Manufacturers Specifications / Warranties
![Page 32: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/32.jpg)
Registration and give accreditation
Representing
Development and Promotion
Regulation of their induct and ethics
Conducting Professional Exam
http://www.lam.gov.my/
![Page 33: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/33.jpg)
Giving awards and regnition
Published monthly magazine
Organising exhibition, workshop, training, and
seminars
http://www.pam.org.my/
![Page 34: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/34.jpg)
TYPES OF GRAPHITE LINES USED BY ARCHITECTS
![Page 35: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/35.jpg)
http://bethantoine.com/paper_treatments/RoseRes.php
http://www.kcet.org/arts/artbound/counties/los-angeles/architectural-drawings-
california-modern-usc.html
http://designhome.pics/architects-floor-plans/8/site-plan-and-floor-plans-the-wolf-re
sidence-by-barton-myers-note-that/
http://cadservices.com/record-drawings-verification-surveys/
http://bunka.nii.ac.jp/jp/world/suisensyo/kyoto/REFERENCE-5/reference5-1.html
http://www.designandlight.co.nz/practice/working_drawings
http://blog.buildllc.com/2008/09/the-process-of-architecture/
http://en.wikipedia.org/wiki/Architectural_drawing
http://www.creativearch.co.nz/index.asp?pageID=2145863519
![Page 36: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/36.jpg)
http://www2.lib.virginia.edu/exhibits/rotunda/postfire/mcdonald.html
http://archtech-ie.blogspot.com/2009_11_01_archive.html
http://hcap.artstor.org/cgi-bin/library?a=d&d=p2185.1
http://www.planedengardendesign.ie/garden-design-process/garden-design.html
http://www.missionscalifornia.com/gallery/gal_architectural-drawings-slo.html
http://www.2thepointdrafting.com/?page_id=206
http://www.nlcworktrax.com/tour/screens/document3.htm
http://architectureplanelevation.blogspot.com
http://www.gabrielking.com/indio%20villa.htm
TAYLOR SCHOOL OF ARCHITACTURE , BUILDING AND DESIGN PROSPECTUS
![Page 37: Ici & itd pj1](https://reader034.vdocuments.site/reader034/viewer/2022042518/55c11259bb61eb4c188b46f4/html5/thumbnails/37.jpg)