IceCOLD® Data Center Installation$900k Annual Savings
Dr. Jeff ZadehSenior Research Director
![Page 2: IceCOLD® Green Enterprise IT Awards 2012](https://reader033.vdocuments.site/reader033/viewer/2022061208/548b5ca3b47959f10c8b61d3/html5/thumbnails/2.jpg)
IceCOLD® Pilot Installation
Data Center: 200,000 square feet
Pilot area: 1,500 square feet
20 minutes to install
AC electricity use measured before and after installation by SourceOne
![Page 3: IceCOLD® Green Enterprise IT Awards 2012](https://reader033.vdocuments.site/reader033/viewer/2022061208/548b5ca3b47959f10c8b61d3/html5/thumbnails/3.jpg)
BackgroundCatalyst breaks up oil fouling by removing oil surface tension
15% to 30% cooling efficiency improvement
3
![Page 4: IceCOLD® Green Enterprise IT Awards 2012](https://reader033.vdocuments.site/reader033/viewer/2022061208/548b5ca3b47959f10c8b61d3/html5/thumbnails/4.jpg)
HistoryOver 10,000 installations, including Fortune 500 companies
Applications: air conditioning and refrigeration systems office buildings, hospitals, homes, CDC’s, restaurants
Efficiency gains continue for the lifetime of the equipment
4
![Page 5: IceCOLD® Green Enterprise IT Awards 2012](https://reader033.vdocuments.site/reader033/viewer/2022061208/548b5ca3b47959f10c8b61d3/html5/thumbnails/5.jpg)
Case Study Results
15% less electricity use
Estimated $922,000savings per year
Payback: 6 months
ROI: 500%+
5
![Page 6: IceCOLD® Green Enterprise IT Awards 2012](https://reader033.vdocuments.site/reader033/viewer/2022061208/548b5ca3b47959f10c8b61d3/html5/thumbnails/6.jpg)
Summary
$922,000 annual savings after IceCOLD® installed
20 minutes per AC unit to install with no downtime
6 month payback, ROI 500%+