Transcript
Page 1: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEAInternational Atomic Energy Agency

How do you know how far you have got?How much you still have to do?

Are we nearly

there yet?What – Who – When

Page 2: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Preparing for assuming commitments & obligations

Infrastructure development

program

1st. NPP

Project

Commissioning

Operation/decommissioning

Nuclear power option included within the

national energy strategy

10 – 15 years

PHASE 2

PHASE 3

PHASE 1

MILESTONE 1Ready to make a knowledgeable

commitment to a nuclear programme

MILESTONE 2

Ready to invite bids

for the first NPP

MILESTONE 3

Ready to commission and operate the first NPP

Feasibility study Bidding process

Pre project Project decision making Construction

Considerations before a decision to launch a nuclear power programme is taken

Preparatory work for the construction of a NPP after a policy decision has been taken

Activities to implement a first NPP

Maintenance and continuous infrastructure improvement

Page 3: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Page 4: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

3 Management

Milestone 2 – Ready to invite bids

Page 5: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

3. Management Phase 2

Conditions Basis for Evaluation1. BIS Available 1. Documented Bid Invitation Specification (BIS) available1. Adequate staff to prepare for

and analyse bids available1. Description of organization including roles and responsibilities of departments and individuals with

respect to bid assessment, supervision of construction, development of knowledge base, understanding of operating and maintenance requirements

2. Evidence that staff members are trained/qualified

1. Bid evaluation criteria determined

1. Clear description of how bids will be evaluated. Evidence that criteria include any country specific requirements, safety and security aspects, the complete fuel cycle requirements, as well as financial, legal, technical and commercial aspects

1. Contracting strategy established

1. Document reviewing contracting strategies and justifying the chosen approach. Approval that chosen strategy is consistent with national legislation. Implications recognized and plan to fulfil necessary requirements in place.

1. Project management organization established

1. Justification of adequate staffing (numbers, skills, experience).

2. Roles and responsibilities within the organization clearly defined, particularly with respect to control of work and acceptance

3. Project reporting mechanisms defined

4. Acceptance procedures and criteria defined

5. Plans to acquire/develop required commissioning skills

6. Interfaces with other organizations defined and agreed on

1. Management systems established

1. All participating organizations (including the regulatory bodies) established and have documented management systems which promote strong safety safeguards and security culture. Management systems are consistent with IAEA recommendations [11].

Clear descripton of how bid will be evaluated. Evidence that criteria

include any country specific requirements, safety and security aspects, the complete fuel cycle

requirements, as well as financial, legal, technical and commercial

aspects.

Page 6: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Main Features

• Covers milestones 1 and 2

• Can be carried out at any point to review progress

• Addresses each of the 19 infrastructure issues

• For each condition, identifies the evidence that will show it has been met

• Seeks to avoid duplication as much as possible

Clear descripton of how bid will be evaluated. Evidence that criteria

include any country specific requirements, safety and security aspects, the complete fuel cycle

requirements, as well as financial, legal, technical and commercial

aspects.

Page 7: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Evidence

• Reports

• Meeting notes

• Correspondence

• Talks and presentations

• Conferences attended with meeting reports

• CVs, organization and job descriptions

Page 8: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Work Programmes

For each issue, there should be a clear work programme for the next phase showing:

• the objectives of the work programme• the detailed activities• who is responsible for each activity,• the funding and resources required,• how it will be provided• the timescales for each activity.

Page 9: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Evaluation Steps

• Determine the scope and terms of reference. • strongly recommended that all 19 issues are

covered• Identify the organizations to be involved • the individuals who will conduct the evaluation;

• Evaluate the status of the infrastructure against the basis listed

• Identify areas needing further attention• Preparing an action plan to address these

areas.

Page 10: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

And an overall conclusion:Significant actions needed; Minor actions neededNo actions needed

Basis for Evaluation Evidence Actions Suggested

Page 11: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

1 National Position Phase 1

Condition Status1.1 Safety, security and non-proliferation needs recognized

Minor Actions Needed

1.2 NEPIO established and staffed No Actions Needed1.3 National strategy defined No Actions Needed

2 Nuclear Safety Phase 1

Condition Status2.1 Understanding of key elements of nuclear safety

Minor Actions Needed

2.2 Need of intergovernmental instruments on safety

No Actions Needed

2.3 Support through international cooperation Significant Actions Needed3 Management Phase 1

Condition Status3.1 Energy strategy and nuclear power compatibility analysed

Minor Actions Needed

3.2 conditions evaluated No Actions Needed3.3 Available nuclear technologies identified No Actions needed3.4 Ownership options and operational responsibilities considered Significant Actions Needed

3.5 Authorities and responsibilities established No Actions Needed3.6 Appropriate expertise and experience Minor Actions Needed3.7 The management systems of all participating organizations are used to promote and support a strong safety culture

Significant Actions Needed

4 Funding and Financing Phase 1

Condition Status4.1 Adequate funding provided for the NEPIO to fully assess the commitments required to implement a nuclear power programme

Significant Actions Needed

4.2 Strategies established for funding and financing No Actions Needed

Page 12: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Evaluation report

• Identification of the ‘team of evaluators’• Identification of the ‘team of respondents’• A description of the process used• Lists of the evidence reviewed • Further actions required• Summary conclusions for each condition• References to any relevant material used• Confidentiality requirements, if any.

Page 13: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Who is the document for?

• Decision makers, advisers and senior managers in the governmental organizations, utilities, industries and regulatory bodies of a Member State.

• Donors, suppliers, nuclear energy agencies and operator organizations.

Page 14: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

How is it used?

Self-evaluation –

“an essential tool for any learning organization.”

• include staff from the organizations involved

• augment with experts from own or another country.

• key requirements are:• a good understanding of the infrastructure issues

knowledge and experience in conducting evaluation activities

• a level of “independence”

Page 15: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Independent Review

• Following such a self-evaluation, Member States are encouraged to arrange an independent review of their evaluation.

Page 16: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEAInternational Atomic Energy Agency

Are we nearly there yet?Covers milestones 1 and 2

Can be used to review progress at any point

Addresses each of the 19 infrastructure issues

Lists evidence that conditions have been met

Provides a methodology for self assessment and

external review

Page 17: IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When

IAEA

Thank You for your attention

Any Questions?


Top Related