• Development– Minimal changes to current I-Suite– Primary Focus is e-Isuite
• Supporting Multiple Operating Systems – Windows 7• Reminder to run I-Suite in XP compatibility mode
– Thin Clients/Remote Desktop• Review the supporting document on Home Page
of the I-Suite Webpage: http://isuite.nwcg.gov
I-Suite2013
![Page 3: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/3.jpg)
General Changes• New field available to capture resource
cell phone number
• Reference Data Update– Cost Rates are being reviewed and will be
updated
I-Suite2013
![Page 4: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/4.jpg)
Resources/Demob• New functionality– Added the ability to collect Name on Picture ID
data during the Check-in process
I-Suite2013
![Page 5: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/5.jpg)
Resources/Demob Cont.• Bug Fixes– Release Date for Strike Teams– Check-in date – Changing or entering a release date on a
Parent record– Running a Section Report when sorting by
Subsection will no longer generate an error
I-Suite2013
![Page 6: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/6.jpg)
IAP• New Functionality
– Added option to export an entire Plan as individual PDF documents
– Added the ability to insert and delete rows on the ICS 205– Double spaces will replace Semi-Colons to distinguish data
elements in Block 6 of the ICS 204
• Bug Fixes/Changes– Deleting a line on the ICS-204 no longer changes the font on
the form– Identified and corrected data entry fields lengths that did not
match database field lengths
I-Suite2013
![Page 7: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/7.jpg)
Time• Bug Fixes– Contractor and/or Agreement Data – Finalized OF-286 Invoices – Missing Days of Postings Report
• Future Changes– Replace Social Security Number with the
Employee Common Identifier (ECI)• ECI is a unique number generated from the
Casual Pay System for all AD/Casual Resources.• Change affects numerous systems• Possible mid-season patch
I-Suite2013
![Page 8: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/8.jpg)
Cost
• New Functionality– The “Actuals Only” checkbox is now
available at the subordinate resource level
• Bug Fixes– Assign Dates – Incorrect Cost Estimates
I-Suite2013
![Page 9: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/9.jpg)
Custom Reports
• “New” Cell Phone Number field will be available in most custom report views
• The vCost view includes the Cost Update level field
• The vContractorResources view includes Contractor address and phone number
• New Report Views – v288Invoices– V286Invoices
I-Suite2013
![Page 10: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/10.jpg)
Supply
• The Supply Bar Code project was used on 9 incidents in 2012
• Kits have been re-built and pre-positioned at National Caches for use in 2013
I-Suite2013
![Page 11: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/11.jpg)
2014 Training
• Currently 2 sessions scheduled at the Redmond Training Center:– March 16 – 20, 2014– April 13 – 17, 2014– DNR – Dates to be determined
![Page 12: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/12.jpg)
What is it?
• Two types of e-ISuite– Enterprise – web-based– Remote Site – networked at an incident
e-ISuite2013
![Page 13: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/13.jpg)
Implementation Status• Delay in original schedule due to change in
software development contractor• Phase 1 Completed• Phase 2 ongoing• Scheduled deployment May/June 2014• I-Suite will be decommissioned after successful
implementation of e-ISuite (approximately December 2015)
e-ISuite2013
![Page 14: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/14.jpg)
What’s Included
• What Stays the Same?– Current I-Suite capabilities
• What’s New?– Resource Inventory– New software to generate reports– Upward reporting capabilities
• Security– Separation of Duties will be met through having 2
types of user accounts– Allows the appropriate user to update rates or
include rates specific to a geographic area or State
e-ISuite2013
![Page 15: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/15.jpg)
Home Pagee-ISuite2013
![Page 16: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/16.jpg)
Add an Incidente-ISuite2013
![Page 17: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/17.jpg)
Resource Inventorye-ISuite2013
![Page 18: I-Suite Update Version 13 I-Suite 2013. General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649cf35503460f949c0fc8/html5/thumbnails/18.jpg)
Agency Implementation
• Individual Agency CIO/Fire Director/Chief approval or direction to use e-Isuite
• Training
• Use of e-Isuite
• The e-ISuite Project Team will be requesting information on trainees to determine needs nationally – beginning January 2014