![Page 1: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/1.jpg)
Hitachi Plant Technologies, Ltd
July, 2006
Hitachi Plant Technologies, Ltd
July, 2006
HPT’s Activity for
Thermal Power Plants
HPT’s Activity for
Thermal Power Plants
![Page 2: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/2.jpg)
2Hitachi Plant Technologies
Gas Turbine
Steam Turbine
Generator
HRSG
Conventional Boiler (Coal, Oil, Gas)
Combined Cycle
Co-generation Plant etc
Business Area Business Area
![Page 3: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/3.jpg)
3Hitachi Plant Technologies
Type of ProjectType of Project
Installation of New Equipment
Refurbishment
Overhaul
Renovation
Replacement
Maintenance etc
![Page 4: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/4.jpg)
4Hitachi Plant Technologies
Engineering
Civil &Building
Mechanical Erection
PipingWork
Construction Planning
Design of BOP
Detail Design
Field Work
Supply
Maintenance& Repair
FieldWork
Supply ofFabrication &
Materials
Materials
BOP
Electrical Work
Fabrication
Spare PartsProject
Management
Scope of Work: Overview Scope of Work: Overview
![Page 5: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/5.jpg)
5Hitachi Plant Technologies
OWNER
Main Contractor
HPC
• Main Equipment
• Basic Engineering
• M & E Field Wok
• BOP Design & Supply
• Detail Eng. / Material Supply
• Civil & Building
Supplier
Division of Works: Case-1Division of Works: Case-1
![Page 6: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/6.jpg)
6Hitachi Plant Technologies
OWNER
Main Contractor
HPC
• Main Equipment
• Basic Engineering
• BOP Design & Supply
• Civil & Building
• M & E Field Wok
• Detail Engineering
• Material Supply
Supplier
Division of Works: Case 2Division of Works: Case 2
![Page 7: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/7.jpg)
7Hitachi Plant Technologies
JAPAN:
- First power plant : year1957
- 250 units constructed in Japan
OVERSEAS:
- First power plant - in India: year 1963
- Erection Experience in over 20 counties
Major Mail stone Major Mail stone
![Page 8: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/8.jpg)
8Hitachi Plant Technologies
Execution Record in Overseas: OverviewExecution Record in Overseas: Overview
VENEZUELABr 3units: 1,200MW
CHINABTG:250MW
JAPAN83 projects: 41.815MW
Br: 16 projectsBTG: 25 projectsTG:25 projects CC: 11 projectsGTG: 6 projects
PHILIPIPINESTG & Br: 850MW
THAILANDCC & BTG: 79MW
INDIAGTG 2unit, BTG & TG: 200 MW
NIGERIAGTG 6 units & BTG:
1,690 MW
EGYPTGTG 4units : 100MW
BAHAMAGTG 2unit: 50 MW
CANADATG 19 projects:
5,520MW
CUBAGTG 3unit & BTG:
229MW
AUSTRALIAGTG 5units, TG & Br: 3,856MW
MALAYSIAGTG 7 units:
170MW
PAKISTANGTG 16unit &TG:
1,140MW
SINGAPOREGTG 2units, CC, TG: 2,650 MW
IRANGTG 23unit & TG:
600MW
TOTAL: 64,000 MW
MEXICOGTG 7 units & TG:
456 MW
KUWAITGTG 8 units:
225 MW
SAUDIARAB IAGTG 10 units:
350 MW
ARGENTINATG 2units: 360MW
![Page 9: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/9.jpg)
9Hitachi Plant Technologies
PERUIlo Thermal Power
125 MW Power Station(Marker: Hitachi, Ltd.)Completed in Year 2000
THAILANDMAPUTAPHUT70MW x 2 GT-G (Maker : GE)Completed in Year 1997
Execution Records : OverseasExecution Records : Overseas
![Page 10: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/10.jpg)
10Hitachi Plant Technologies
NIGERIANIGERIADelta Power StationDelta Power StationH25 Gas Turbine 6Unit H25 Gas Turbine 6Unit (Maker: HITACHI)
NIGERIANIGERIALagos Thermal PowerLagos Thermal PowerBoiler/Turbine Boiler/Turbine Rehabilitation WorkRehabilitation Work(Maker: HITACHI)(Maker: HITACHI)
Execution Records : OverseasExecution Records : Overseas
![Page 11: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/11.jpg)
11Hitachi Plant Technologies
BAHAMABahama Electricity Co.25MW x 2 Gas Turbines(Marker: Hitachi, Ltd.)Completed in Year 2003
Execution Records : OverseasExecution Records : Overseas
![Page 12: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/12.jpg)
12Hitachi Plant Technologies
Replacement of GTG (F5 class) to H25 (25MW)
Replacement of GTG (F5 class) to H25 (25MW)
1. Contract Formation:
Bahamas Electricity Corp.Bahamas Electricity Corp. Sumitomo Corp.Sumitomo Corp.
Hitachi PlantHitachi Plant
Hitachi Ltd.Hitachi Ltd. Main Equipment Supply
Foundation work, Installation work & Material Supply2. Location:
Execution Records : OverseasExecution Records : Overseas
BAHAMA
![Page 13: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/13.jpg)
13Hitachi Plant Technologies
EGYPTCairo North 750MW Combined Cycle Power Station
250MW x 2 Gas Turbines and Generators(Maker: Mitsubishi Heavy Industries)250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.)
Erection Works
Major Projects: OverseasMajor Projects: Overseas
![Page 14: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/14.jpg)
14Hitachi Plant Technologies
Senoko P.S. No.1~8 120MW×3 250MW×5
Senoko P.S. No.1~8 120MW×3 250MW×5
Tuas Stage1No.1,2600MW×2Tuas Stage1No.1,2600MW×2
Sakura P.S. 800MW C/CSakura P.S. 800MW C/C Seraya P.S. No.4~6250MW×3Seraya P.S. No.4~6250MW×3
HPC Singapore BranchHPC Singapore Branch
Tuas stage 2Phase2 720MW C/CTuas stage 2Phase2 720MW C/C
Jurong P.S. No.1~460MW×4Jurong P.S. No.1~460MW×4
Execution Records: Singapore - OverviewExecution Records: Singapore - Overview
![Page 15: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/15.jpg)
15Hitachi Plant Technologies
SINGAPORETuas Stage I 600 MW x 2ST-G (Maker:Hitachi,Ltd.)Completed in Year 1999
Tuas Stage II 360 MWx2 Combined Cycle Power Station(Maker: Mitsubishi Heavy Industries)
Execution Records: Singapore - TuasExecution Records: Singapore - Tuas
![Page 16: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/16.jpg)
16Hitachi Plant Technologies
Execution Records in AustraliaExecution Records in Australia
LOY YANG B:1,000MW(500MW×2)Maker :Hitachi,Ltd.Completed in year 1996
STANWELL:1,400MW(350MW×4)Maker: Hitachi,Ltd.Completed in year 1996
PINJAR:37MW (F6×1)Maker : Hitachi,Ltd.Completed in year 1990
BRISBANE
SYDNEYMELBOURNEPERTH
KALGOORIE:37MW (F6×1)Maker: Hitachi,Ltd.Completed in year 1989
MUNGARRA:37MW (F6×1)Maker: Hitachi,Ltd.Completed in year 1989
TARONG:1400MW(350MW×4)Maker: Hitachi,Ltd.Completed in year 1988
TARONG NORTH:450MW(450MW×1)Maker: Toshiba,Ltd.Completed in year 2002
![Page 17: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/17.jpg)
17Hitachi Plant Technologies
Tarong Power Station350MW x 4 Steam Turbines(Maker: Hitachi, Ltd.)Completed in Year 1988
Execution Records: Australia- QueenslandExecution Records: Australia- Queensland
![Page 18: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/18.jpg)
18Hitachi Plant Technologies
Tarong North Power Station450MW x 1 Steam Turbines(Maker: Toshiba, Ltd.)Completed in Year 2002
Execution Records: Australia- QueenslandExecution Records: Australia- Queensland
![Page 19: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/19.jpg)
19Hitachi Plant Technologies
Stanwell Power Station350MW x 4 TG & Auxiliaries(Maker: Hitachi, Ltd.)Completed in Year 1996
Execution Records: Australia- QueenslandExecution Records: Australia- Queensland
![Page 20: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/20.jpg)
20Hitachi Plant Technologies
Loy Yang ‘B’:
500MW x 2 TG & Auxiliaries
(Maker: Hitachi, Ltd.)
Completed in Year 1996
Execution Records: Australia- VictoriaExecution Records: Australia- Victoria
![Page 21: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/21.jpg)
21Hitachi Plant Technologies
- Mungarra : 37MW x 1 F6 Gas Turbine
(Maker: Hitachi, Ltd.) Completed in year 1989
- Kalgoorlie: 37MW x 1 F6 Gas Turbine
(Maker: Hitachi, Ltd.) Completed in year 1989
- Pinjar: 37MW x 1 F6 Gas Turbine
(Maker: Hitachi, Ltd.) Completed in year 1990
Execution Records: Australia- Western AustraliaExecution Records: Australia- Western Australia
![Page 22: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/22.jpg)
22Hitachi Plant Technologies
Execution Records: Kogan Creek 750MW (under construction)Execution Records: Kogan Creek 750MW (under construction)
Project Name: Kogan Creek Power plant 750MW coal fired power station Location: Queensland, AustraliaOwner: CEPA(Kogan Creek)Holding Pty Ltd.Manufacture: SIEMENS Ltd. AustraliaScope of our work: Installation workDate of Contract: Aug 2005Date of Completion: Aug, 2007
![Page 23: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/23.jpg)
23Hitachi Plant Technologies
Waste Water Treatment Plant for Sydney Metropolitan Waste Disposal Authority
Major overhaul of Tarong U1 Turbine
Refurbishment and re-commissioning of Swankbank‘A’ Sootblowers
Electrical & instrumentation for retrofit of precipitators fabric filter plant Swankbank ‘B’.
Cabling, light & power services for Callide ‘A’ re-powering
Execution Records: AustraliaExecution Records: Australia
![Page 24: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/24.jpg)
24Hitachi Plant Technologies
Execution Records : Venezuela - CADAFEExecution Records : Venezuela - CADAFE
1978– 1984
PLANTA CENTRO THERMAL POWER STATION UNITS 3 & 4, and Unit 5
Owner: COMPAÑÍA ANONIMA DE ADMINISTRACION Y FOMENTO (CADAFE)
Unit:3 & 4: Installation of Two 1400 Ton/Hour Boilers and Associated equipment for 400 MW generating Units No 3 & 4, AFE including erection of Steel Structures of the Boilers.
Unit 5: Installation of 1,400 Ton/Hour boiler for 400 MW generation unit.
![Page 25: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/25.jpg)
25Hitachi Plant Technologies
Execution Records : Venezuela - Tacoa DCSExecution Records : Venezuela - Tacoa DCS
Construction period: 2004-2005
Project Name: Tacoa Power plant unit 7, 8 & 9 - DCS (Distributed digital controls) project
Owner: La Electricidad de Caracas (EDC)
Purchaser: Toshiba Corporation (Mitsui & Co., ltd)
Site: Caracas
HPC & VHPC’s scope
- Installation and electrical works
- Supply of cables & materials
![Page 26: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/26.jpg)
26Hitachi Plant Technologies
Execution Records : Venezuela - Tacoa DCSExecution Records : Venezuela - Tacoa DCS
![Page 27: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/27.jpg)
27Hitachi Plant Technologies
Execution Records : Venezuela - ELEVAL H25Execution Records : Venezuela - ELEVAL H25
Construction period: 2005-2006
Project name: ELEVAL H25 GTG x 1 units
Owner : ELEVAL
Purchaser: Hitachi Ltd (Mitsui & Co., ltd)
Site: VALENCIA
HPC & VHPC’s scope
- Installation and electrical works
- Foundation work
- Inland transportation and material supply
![Page 28: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/28.jpg)
28Hitachi Plant Technologies
Execution Records : Venezuela - ELEVAL H25Execution Records : Venezuela - ELEVAL H25
![Page 29: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/29.jpg)
29Hitachi Plant Technologies
ISOGO600 MW Coal Fired Turbine Generator System Installation(Maker: Fuji – Siemens)Completed in Year 2002
FUTTSUFuttsu Power Station 1520MW Combined Cycle(Maker: Hitachi, Ltd.)Completed in Year 2003
Execution Records : JapanExecution Records : Japan
![Page 30: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/30.jpg)
30Hitachi Plant Technologies
Toden/Futtsu 2(1000MW C/C)1988 Futtsu 3(1520MW C/C) 2005
Toden/Yokohama 8 (1400MW C/C)1998
Kyusyuden/Shinoita 1 (690MW C/C)1991 3 (700MW C/C) 1998
Toden/Chiba 2 (720MW C/C)2000
Chubuden/Kawagoe 3 (1650MW C/C)1996
Kanden/Himeji 6 (670MW C/C)1996
Chugokuden/Yanai 1 (700MW C/C)1992 2 (700MW C/C)1996
Execution Records:Combined Cycle Plant in Japan:OverviewExecution Records:Combined Cycle Plant in Japan:Overview
![Page 31: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/31.jpg)
31Hitachi Plant Technologies
Chipping Work for Sole PlatesChipping Work for Sole Plates
Execution Records:Shin-Oita CC PlantExecution Records:Shin-Oita CC Plant
![Page 32: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/32.jpg)
32Hitachi Plant Technologies
Contact Check for Sole Plate PadsContact Check for Sole Plate Pads
Execution Records:Shin-Oita CC PlantExecution Records:Shin-Oita CC Plant
![Page 33: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/33.jpg)
33Hitachi Plant Technologies
Handling of Condenser Lower ShellHandling of Condenser Lower Shell
Execution Records:Shin-Oita CC PlantExecution Records:Shin-Oita CC Plant
![Page 34: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/34.jpg)
34Hitachi Plant Technologies
Gas Turbine LiftGas Turbine Lift--up with Lifting Jackup with Lifting Jack
Execution Records:Shin-Oita CC PlantExecution Records:Shin-Oita CC Plant
![Page 35: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/35.jpg)
35Hitachi Plant Technologies
Installation done byInstallation done byLifting JackLifting Jack
Execution Records:Shin-Oita CC PlantExecution Records:Shin-Oita CC Plant
![Page 36: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/36.jpg)
36Hitachi Plant Technologies
Gas Turbine Setting CompletedGas Turbine Setting Completed
Execution Records:Shin-Oita CC PlantExecution Records:Shin-Oita CC Plant
![Page 37: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/37.jpg)
37Hitachi Plant Technologies
BOP: Air Pollution Control SystemBOP: Air Pollution Control System
Senoko Power StationSingapore (Electrostatic Precipitator)
Dry and Wet Type Electrostatic Precipitators
Moving-Electrode Type Electrostatic
Harmful Gas Removal Units
(Including Hydrogen Chloride Gas)
Fuel Gas Temperature Regulators
Ash & Dust Conveying Systems
Precipitators
Bag Filters
![Page 38: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/38.jpg)
38Hitachi Plant Technologies
ISO certificate & QCISO certificate & QC
![Page 39: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/39.jpg)
39Hitachi Plant Technologies
Our Advantages: Benefits to CustomerOur Advantages: Benefits to Customer
Wide Range of Work Scope Accumulated Project Knowledge & ExperienceAdvanced Construction Technology Global NetworksSkillful Human RecoursesPre-engineering Service
Advanced Project ManagementSystematic Schedule ManagementInterface management with Other Parties
MinimumCost
MinimumCost
On Time On Time
Long-term ExperienceSound financial backgroundQA/QC, Safety Policy
Total SatisfactionTotal Satisfaction
Our Advantages Benefits to CustomerCost
Schedule
Reliability
![Page 40: HPT’s Activity for Thermal Power Plants - VHPC Thermal Power Short Version... · HPT’s Activity for Thermal Power Plants. ... 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.) Erection](https://reader034.vdocuments.site/reader034/viewer/2022051320/5aa76a507f8b9aee748c07c0/html5/thumbnails/40.jpg)
40Hitachi Plant Technologies
Pre-Engineering : Benefits to CustomersPre-Engineering : Benefits to Customers
Realization of Effective Construction Schedule
Reduction of Total Project Cost by minimizing Erection Cost
Reduction of Documentation Cost
Smoothing Site work
Suggestion of Design for optimizing Erection Work & Construction Schedule
Introduction of Advanced Erection Technology
Assistance of making Documentation for construction planning
Advice of site work conditions
EngineeringEngineering
Pre-Engineering Service
ProcurementProcurement ConstructionConstruction
Feed-BackFeed-Back
Benefits