How to implement the TBLS strategy -

tactic workshop. Ricardo Anselmo de Castro

[email protected]

Abstract

The TBLS business strategy implementation

consists of 18 phases, 5 of which occur during the

tactic workshop (the others are described in the

strategic workshop). This paper shows «the how» of

the tactic workshop and establishes some links with

the author’s previous papers that explore certain phases of the strategy which are only mentioned

here.

Key-words: TBLS

To take the best

advantage of TBLS

it is necessary to

develop a strategic

workshop (discussed

in a previous paper),

but also a tactic

workshop – the

scope of this paper.

Up to three days, the

goal is to provide

high level training in

TOC, BOS, Lean

and Six Sigma

while,

simultaneously, to

run the last 5 phases

of the

implementation

itself. The entities

that should attend to

this event are: the

champion

deployment;

managers who

didn’t participate in the strategic

workshop and are

directly involved

in the selected

horizontal

process; and some

staff as

controllers. It is

assumed that prior

to this event the

strategic

workshop took place (otherwise it will not make

any sense). The opening of the event must be done

by the champion deployment (or even by the

system’s owner himself) so that everybody

understands that this initiative will have top

sponsorship. After this intro the first thing to be

done is:

14. Map the horizontal process (PH).

Please remember that one of the strategic workshop

outputs was: “horizontal process to be improved

defined”. One thing is to identify it; another thing is

to map it. This will allow a factual understanding of

what the process is. At this phase we also want to

pinpoint the high level variables that may influence

process’ effectiveness and efficiency the most. This

is an important exercise because companies can

only improve if their core processes improve. It is

assumed that the process is measurable and

causalities can be fairly proven. As a consequence,

people will visualize their process and share a same

understanding of where the constraint can be. The

most likely tool to be used at this stage is the

SIPOC diagram, but other different tools such as

going to Gemba or scatter/line charts may be

valuable as well. On the other hand, it may be also

necessary to validate in more precise terms what

value to the customer is.

The next figure shows a SIPOC diagram based on

the example coming from the “strategic workshop” paper. Please remember that the area which holds

the constraint is at the supplier and the identified

horizontal process is: “Receiving order,

transforming raw material “A” to finished goods and delivery“.

15. Truly pinpoint the constraint and establish a

future state.

This phase refers to the first of the five TOC’s focusing steps. The goal is to identify the constraint

and set logic objectives. It is assumed that every

process has a constraint and the system’s constraint lies in this process! From now on, everybody will

Build project

teams and execute

projects with no

interruptions, by

using a T, BOS, L

or SS tactic, until

the NC is no

longer the

constraint.

Identify the project

leader and the

champion to each

project.

Map the horizontal

process (PH).

Pinpoint truly the

constraint and

establish a future

state.

Identify and

prioritize projects

linked to the

constraint.

MO

NT

HL

Y M

EE

TIN

G

Efficiency: Total lead time = f(inventory, defects, setups, lot size,…)

Efectiveness: Due date performance = f(total lead time, slowest cycle time,…)

Customer

places the

order

Risk assess-

ment of order

fullfilment

Processingthe order

Transportand delivery

SUPPLIER

- Supplier A

- Supplier B

INPUTS

- policies

- materials

- equipments- know-how

- information

OUTPUTS

- due date performance

- no defects

CUSTOMERS

- The company

PROCESS

Page 2: How to implement the TBLS Strategy - the tactic workshop

very well know, what “priority“ means.

The most likely tools to be used at this stage are

(use only one):

- Value stream mapping (VSM)

- Materials flow diagram

(better than VSM for a multiproduct company)

- Current reality tree

According to the example the constraint is

somewhere at the supplier. A decision was

made of what sub process the team should dig

further: “Processing the order”. The figure shows

a zoom in of this sub process with the use of VSM

(only a part is shown). Notice also that two goals at

the NC level were set: 7 days for the lead time and

99% for the due date performance. Both objectives

are considered aggressive. In the last figure of this

page, the areas circled in red correspond to the

constraint itself. It’s important to link the NC baseline and its objective and the horizontal

processes objectives. Logically, if the gap of NC is

at 7 days (for the lead time metric), the objective set

to the process must be approximately the same (in

this case – 7,5 days). In summary, in order to

achieve a lead time of 5 days we must act mainly in

the inventory after process I. Analogously, to

improve due date performance we must reduce the

slowest sub process cycle time – process III. At this

stage, we still don’t know how many improvement

projects must be deployed to attain these goals,

nevertheless, the constraint is identified and the

focus point for improvement projects is now clear.

Source: Nash, M. and Poling, S. (2008).

80%

14 days

Baseline

99%

7 days

Objective

19%Due date performance

7 daysLead time

GapMetric (Raw-Material A)

80%

14 days

Baseline

99%

7 days

Objective

19%Due date performance

7 daysLead time

GapMetric (Raw-Material A)

Minimum objective to

shift the constraint!

Processingthe order

Source: Nash, M. and Poling, S. (2008).

47 sec.

12.5 days

Baseline

33 sec. (because takt time = 38 sec.)

5 days

Objective

14 sec.Process III cycle time

7.5 daysInventory after process I

GapMetric (Raw Material A)

47 sec.

12.5 days

Baseline

33 sec. (because takt time = 38 sec.)

5 days

Objective

14 sec.Process III cycle time

7.5 daysInventory after process I

GapMetric (Raw Material A)

80%

14 days

Baseline

99%

7 days

Objective

19%Due date performance

7 daysLead time

GapMetric (Raw-Material A)

80%

14 days

Baseline

99%

7 days

Objective

19%Due date performance

7 daysLead time

GapMetric (Raw-Material A)

Page 3: How to implement the TBLS Strategy - the tactic workshop

16. Identify and prioritize projects linked to the

constraint.

Once known the truly constraint the company will

list potential projects. Prioritization is made until all

resources are consumed. It is

assumed that resources are

available to execute the

selected projects and also that

there’s formal top management

authorization for deployment.

The phase outputs are: 1)

projects defined, 2) projects benefits quantified and

3) projects with low resistance to improvement. We

must not forget that the necessary condition to

approve any TBLS project refers to the “First time through improvement model” which states: “deploy

improvement projects ONLY where current

stability is lower than expected AND IF it’s a leverage point of the company (hot spot or

constraint)”. You may read the paper “First time through improvement model” for a more in-depth

reading. The criteria to prioritize projects are:

Level of instability felt by employees at the

constraint’s vicinity

Expected return (tangible or intangible)

Estimated project duration

As we can see in the next figure if stability IS NOT

under employees expectations one should not

deploy the corresponded project, even if there is a

great opportunity to make money. The priority

index is just the expected return over the estimated

project duration. The higher the ratio the more

attractive the project is. This ratio follows the

throughput accounting principle.

17. Identify the project leader and the champion

for each project.

The title is self descriptive. At this stage we also

want to establish a rough schedule to the project. It

is assumed that the champion and the team leader

are available, their competences and know-how are

not a concern and that formal authorization from

top management is not a problem.

As a consequence the most important projects are

populated with the best people. The next figure

shows the status of things prior to phase 18.

18. Build project teams and execute projects

with no interruptions, by using a TOC, BOS,

Lean or Six Sigma tactic, until the NC is no

longer the constraint. As a matter of fact, phase 18 occurs after the tactic

workshop. Suffice is to say that this workshop

should take place monthly as a simple monitoring

tool or as a deeper analysis tool every time that the

deliverables of the strategic workshop change

drastically.

CONCLUSION

The tactic workshop is an important tool and a

logical consequence of the strategic workshop. This

is when the rubber meets the road. The main

deliverables of this workshop are:

Horizontal process mapped (also useful for

future projects).

Truly constraint identified.

Improvement projects sign-off, process

objectives defined.

Champion and team leader assigned to

projects.

References

[1] Castro, Ricardo

A. (2014) O Proveito

da Dúvida – troque o

peixe pela cana de

pesca. Leanpub.

wk14 - wk21

Start Date

End Date

Project charter completed

by week 13

Observations

J. Smith

Champion

P. Munro

Team Leader

1. Inventory reduction

after station I

Approved projects

wk14 - wk21

Start Date

End Date

Project charter completed

by week 13

Observations

J. Smith

Champion

P. Munro

Team Leader

1. Inventory reduction

after station I

Approved projects

8000010800000No3. Project 3

5

7

b. Estimated project

duration [weeks]

70000

85700

Priority index

a. / b.

Yes

Yes

Stability in the vicinity

under what is expected?

350000

600000

a. Expected return [€]

2. Cycle time reduction in

station III

1. Inventory reduction after

station I

Potential Projects

8000010800000No3. Project 3

5

7

b. Estimated project

duration [weeks]

70000

85700

Priority index

a. / b.

Yes

Yes

Stability in the vicinity

under what is expected?

350000

600000

a. Expected return [€]

2. Cycle time reduction in

station III

1. Inventory reduction after

station I

Potential Projects