SITE VISIT REPORT & RECOMMENDATIONS DOCUMENT
ELECTRICAL SYSTEMS UPGRADE
Job # NG-23-1
CLIENT: DEUX PROJECTS
1 10thApril 13 First revision Complete with Pictures AI OAD
0 7TH
April 13 Preliminary draft document without pictures AI OAD
REV DATE DESCRIPTION ORIG APPROVALS
Document NumberProject No. Deliv. Code Doc. Type Seq. Num. Rev.
IP-DP-01 1000 5040 001 1
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
2/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 2 of 23 08/05/13
Table of Contents
0.0 BACKGROUND
1.0 EXISTING INFRASTRUCTURE
2.0 FUNCTIONAL/SAFETY COMPLIANCE ISSUES
3.0 LOAD SUMMARY
4.0 RECOMMENDATIONS
5.0 IPGRUPPS EXECUTIVE COMPANY SUMMARY
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
3/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 3 of 23 08/05/13
0.0 BACKGROUND
Ongoing upgrades/new infrastructure works at the specialist Hospital facility EKU over the last twoyears have added and upgraded several building facilities. To achieve the expected significantbenefits from this investment the overall electrical utility systems will require substantial upgradesand modifications.
IPgrupp Engineering/NEGO Construction with the support of specialist Hospital EKU personnelhave conducted a site review of the existing electrical utilities ,this preliminary report has beendeveloped to highlight key functional and safety concerns arising from the inspection and provideearly recommendations for system upgrade with summary schedule of works to achieve same..
The report begins with a technical overview of the existing electrical infrastructure and theoperational condition as a prelude to the identification of functional and safety compliance issueswe have identified, we conclude with recommendations to resolve these issues and bring overallsystem into compliance.
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
4/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 4 of 23 08/05/13
1.0 EXISTING INFRASTRUCTURE
1.1 PHCN Power In-Take and Switching System
Power from the PHCN utility company feeds into the EKU specialist hospital facility via11KV/415V 500KVA substation. The 11KV/415V substation is newly installed underthis project and is located close to the previously shared community sub-station withinthe hospital grounds.
Fig 1 PHCN Intake HV/LV Substation
The transformer unit is rated at 500KVA 11/0.4KV ONAN manufactured by ABB whilethe Feeder Pillar LV Distribution panel is rated for 600Amps
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
5/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 5 of 23 08/05/13
Fig 2 HV-LV 500KVA Transformer UnitThe Output from the 600Amp Feeder Pillar is routed thru a 4core x 95mmsq
PVC/SWA/PVC copper cable to an over-head Aluminum 4 core x 100mmsq conductorline which feeds the Low Voltage power from this PHCN in-take substation to thefacility main power house/switching sub-station.
Fig 3 LV O/Head Line from PHCN Intake S/Station Fig 4 PVC/SWA/PVC cable connection O/Head Lineto Main Power Plant Isolator
A 4core x 120mmsq Flex Cable continues from where the overhead Aluminum lineends to feed power thru to a main isolator switch the ratings for which we were unableto determine during our survey.
The isolator switch then feeds into a PHCN-to-Generator change-over switchassembly (SW1 fig 5 below)
Transformer
11/
0.415KV Feeder Pillar
600A
Change-over
SW1
11KV Overhead Line Supply From PHCN 2.5MVA
Substation 11KV Overhead Line Feeder to Power Station
120mmsq Aluminum Conductor Cable
3core x 35mmsq
XLPE HV Cable 4core x 95mmsq
PVC/SWA/PVCCable
4core x 120mmsq
PVC/SWA/PVCCable
Main
Isolator
G
Generator
Change-over
SW2
G
Generator
Fig 5 Overall PHCN In-take one-line schematic
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
6/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 6 of 23 08/05/13
The PHCN-to-Generator change over switch #1 is cascaded to another change 0verswitch #2 which serves to enable selection between the outside functional 500KVAgenerator and the now derelict 230KVA CAT 230 V8 generator. Hence the changeover switch now functions as an isolator for the 500KVA outside generator only.
Change-Over switch #2 enables
selection between the functional
500KVA generator and now
derelict 230KVA CAT generator
(shown beside the change-over
switch)
Fig 6 Change-over switch #2 and faulty 230KVA CAT Generator
Main Change-Over switch #1
enables selection between the
PHCN Supply and selected
generator from Change-Over
switch #2 (now confined 500KVA
generator only as the 230KVAgenerator is faulty
Fig 7 Change-Over Switch #1 PHCN-Generator Supply
Change-over
SW1
G
230KVA
Change-over
SW2
G
500KVA
Faulty
PHCN
Supply
MainIsolator
Fig 8 Change-Over Switch #1 and # 2 Schematic
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
7/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 7 of 23 08/05/13
Output from changeover switch # 1 is fed thru a 4core 120mmsq PVS/SWA/PVCcopper cable to a secondary internal overhead aluminum conductor system, utilizingconcrete poles slightly shorter than those used for transferring power from the PHCNs/station to the main facility substation.
Secondary Overhead distribution
concrete pole and PVC sheated
100mmsq Aluminum Conducted
Power from PHCN and the main
500KVA Generator is distributed
to the various hospital load
centers thru this overhead
system
PHCN Over Head LV feeder from
Transformer Sub-Station close
to the main gate
Fig 9 Primary and Secondary Power Distr. Overhead Systems
1.2 Local Power Generation System and Ancillary Equipment
Power Plant inspection determined that the facility designed Power generation systemhad previously consisted of two Diesel driven CATERPILLAR Generators CAT 150
and CAT 230 with KVA ratings of 150KVA and 230KVA respectively. Over the yearsas these fell into disrepair a 350KVA PERKINS, 27KVA WOERMANN, 500KA LISTERand a 15KVA unbranded Generator have been added to the Power pool.
As at time of inspection only the 500KVA and the 15KVA generators where in afunctional state the others all being at different stages of disrepair or completelyscrapped out.
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
8/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 8 of 23 08/05/13
The Power plant equipment interconnect feeder and control cabling has beenrepeatedly altered, decommissioned and re-routed so extensively in variance to allapplicable safety or functional compliance code/regulatory requirements
500KVA Generator currently in
service
Fig 10
150KVA CAT 150 Generator in
state of disrepair (cracked engine
block)
Fig 11
350KVA PERKINS
Generator requiring
general overhauling
repairs works
Far right is the
27KVA WOERMANN
Generator shown with
a missing alternator
Fig 12
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
9/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 9 of 23 08/05/13
1.3 Power Distribution to Hospital Load Centers
The main power distribution system for this facility is a low voltage overhead linesystem routed to all the main load centers/buildings within the complex. Service 4corealuminum condor cables are generally used to tap power from the nearest overheadpole to each building
Service cable used to tap power
from overhead power distribution
system to each building as
required.
Fig 12 Showing service cables used to Tap Power into Buildings
The emergency power system consist of the 15KVA generator and a distribution panelwith outgoing feeders directly to identified critical loads/facilities. The inspectionrevealed that the outgoing feeders and the distribution panel had been re-workedrepeatedly to an extent that the safety and functionality had been significantlycompromised .
Fig 13 Showing 15KVA Generator and Emergency Feeder Panel
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
10/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 10 of 23 08/05/13
500 KVA Transformer
11/
0.415KV Feeder Pillar
600A
11KV Overhead Line Supply FromPHCN 2.5MVA
Substation
11KV Overhead Line Feeder to Power Station120mmsq AluminumConductor Cable
3core x 35mmsq
XLPE HV Cable 4core x 95mmsq
PVC/SWA/PVC
Cable
4core x 120mmsq
PVC/SWA/PVC
Cable
Main
Isolator
G
500KVA
Change-over
SW2
G
230KVA
PHCNSupply
PHCN Isolator
SW
Faulty-But still
Connected
Change-over
SW1
LowVo
ltageOverheadLine
InternalDistributionsystem
G
15KVA
Change-over
SW3
Emergency supply to selected wards and theater
Directcablingtoloads
Viaservicecables
4corex120mmsq
PVC/SWA/PVCCable
G
150KVA
Faulty-But still
Connected
Change-overSW4
Safety/
Compliance
Issue 1
Safety/
Compliance
Issue 2
Fig 14 Showing Overall Power Generation and Distribution System
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
11/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 11 of 23 08/05/13
2.0 FUNCTIONAL/SAFETY COMPLIANCE ISSUES
The technical audit on the electrical systems for the facility revealed several non-compliance and safety issues that should be addressed in any future upgrade program
It was noted that the interconnecting power cabling between generators , change-overand isolator switches has been altered/added and was exposed in several instances .
Control Panels for several of the generators are derelict and need to be decommissioned
as live cabling is still routed thru as part of the generator switching system.
Fig 15 Control Panel and Change-Over Switch Cabling in Plant Room
All switch operations are performed manually with no safety inter-lock systems in placehence only experienced and plant specific trained personnel can perform switchingsafely. Accidental power feedback to generating systems remains a substantial risk withthe current operations.
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
12/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 12 of 23 08/05/13
3.0 PROJECTED LOAD SUMMARY
S/No Gate House Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 5 240 6 1440 1800
2 External Lights 20 60 240 1200 1500
3 Ceiling Fan 1 400 240 400 500
240 0 0
TOTAL 3040 3800
S/No Waiting room Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 15 240 18 4320 5400
2 External Lights 20 60 240 1200 1500
3 Ceiling Fan 5 400 240 2000 2500
4 Airconditioners 4 1110 240 4440 5550
5 Internal Lights 13 36 240 468 585
6 Emergency Lights 1 40 240 40 50
240 0 0
TOTAL 12468 15585
S/No Maternity Ward Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 100 240 120 28800 36000
2 External Lights 18 60 240 1080 1350
3 Ceiling Fan 20 400 240 8000 10000
4 Airconditioners 9 1110 240 9990 12487.
5 Internal Lights 89 36 240 3204 4005
6 Emergency Lights 3 40 240 120 150
7 Water Heater 3 1000 240 3000 3750
8 Expeller Fan 6 200 240 1200 1500
9 Bed Lights 28 12 240 336 420
240 0 0
TOTAL 55730 69662.
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
13/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 13 of 23 08/05/13
S/No Family Medicine Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 5 240 6 1440 1800
2 External Lights 4 60 240 240 300
3 Ceiling Fan 2 400 240 800 1000
4 Airconditioners 2 1110 240 2220 2775
5 Internal Lights 7 36 240 252 315
6 Emergency Lights 0 40 240 0 0
7 Water Heater 0 1000 240 0 0
8 Expeller Fan 0 200 240 0 0
TOTAL 4952 6190
S/No Children's Ward Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 114 240 136.8 32832 41040
2 External Lights 21 60 240 1260 1575
3 Ceiling Fan 18 400 240 7200 9000
4 Airconditioners 6 1110 240 6660 8325
5 Internal Lights 70 36 240 2520 3150
6 Emergency Lights 6 40 240 240 300
7 Water Heater 1 1000 240 1000 1250
8 Expeller Fan 18 200 240 3600 4500
9 Bed Lights 10 12 240 120 15010 Hand Dryer 1 600 240 600 750
11 Cooker Unit 1 240 32 7680 9600
TOTAL 63712 79640
S/No Private Ward Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 94 240 112.8 27072 33840
2 External Lights 16 60 240 960 1200
3 Ceiling Fan 19 400 240 7600 9500
4 Airconditioners 18 1110 240 19980 24975
5 Internal Lights 90 36 240 3240 4050
6 Emergency Lights 9 40 240 360 450
7 Water Heater 1 1000 240 1000 1250
8 Expeller Fan 0 200 240 0 0
9 Bed Lights 33 12 240 396 495
10 Hand Dryer 0 600 240 0 0
TOTAL 60608 75760
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
14/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 14 of 23 08/05/13
S/No Men's Ward Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 86 240 103.2 24768 30960
2 External Lights 21 60 240 1260 1575
3 Ceiling Fan 20 400 240 8000 10000
4 Airconditioners 4 1110 240 4440 5550
5 Internal Lights 77 36 240 2772 3465
6 Emergency Lights 5 40 240 200 250
7 Water Heater 1 1000 240 1000 1250
8 Expeller Fan 4 200 240 800 1000
9 Bed Lights 33 12 240 396 495
10 Hand Drye 1 600 240 600 750
11 Cooker Unit 1 240 32 7680 9600
TOTAL 51916 64895
S/No Women's Ward Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 97 240 116.4 27936 34920
2 External Lights 21 60 240 1260 1575
3 Ceiling Fan 24 400 240 9600 12000
4 Airconditioners 5 1110 240 5550 6937.5
5 Internal Lights 77 36 240 2772 3465
6 Emergency Lights 6 40 240 240 300
7 Water Heater 3 1000 240 3000 3750
8 Expeller Fan 2 200 240 400 500
9 Bed Lights 40 12 240 480 600
10 Hand Dryer 1 600 240 600 750
11 Cooker Unit 1 240 32 7680 9600
TOTAL 59518 74397.5
S/No Store Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 6 240 7.2 1728 2160
2 External Lights 6 60 240 360 450
3 Ceiling Fan 3 400 240 1200 1500
4 Airconditioners 3 1110 240 3330 4162.5
5 Internal Lights 10 36 240 360 450
TOTAL 6978 8722.5
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
15/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 15 of 23 08/05/13
S/No Canteen Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 33 240 39.6 9504 11880
2 External Lights 6 60 240 360 450
3 Ceiling Fan 4 400 240 1600 2000
4 Airconditioners 4 1110 240 4440 5550
5 Internal Lights 56 36 240 2016 2520
6 Emergency Lights 4 40 240 160 200
7 Water Heater 1 1000 240 1000 1250
8 Expeller Fan 2 200 240 400 500
9 Bed Lights 0 12 240 0 0
10 Hand Dryer 0 600 240 0 0
11 Cooker Unit 0 240 0 0 0
TOTAL 19480 24350
S/No Isolation Ward Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 43 240 51.6 12384 15480
2 External Lights 12 60 240 720 900
3 Ceiling Fan 10 400 240 4000 5000
4 Airconditioners 13 1110 240 14430 18037.5
5 Internal Lights 49 36 240 1764 2205
6 Emergency Lights 1 40 240 40 50
7 Water Heater 0 1000 240 0 0
8 Expeller Fan 0 200 240 0 0
9 Bed Lights 0 12 240 0 0
10 Hand Dryer 0 600 240 0 0
11 Cooker Unit 1 240 32 7680 9600
TOTAL 41018 51272.5
S/No Walkway Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 0 240 0 0 0
2 External Lights 59 60 240 3540 4425
3 Ceiling Fan 0 400 240 0 0
TOTAL 3540 4425
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
16/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 16 of 23 08/05/13
S/No
A & E Ward Load
Description QTY Watts Voltage Current W VA
1 13amps Ring Main 186 240 223.2 53568 66960
2 External Lights 16 60 240 960 1200
3 Ceiling Fan 40 400 240 16000 20000
4 Airconditioners 31 1110 240 34410 43012.5
5 Internal Lights 158 36 240 5688 7110
6 Emergency Lights 6 40 240 240 300
7 Water Heater 5 1000 240 5000 6250
8 Expeller Fan 17 200 240 3400 4250
9 Bed Lights 20 12 240 240 300
10 Hand Dryer 0 600 240 0 0
11 Cooker Unit 1 240 32 7680 9600
TOTAL 127186 158982.5
S/No Luandry Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 25 240 30 7200 9000
2 External Lights 11 60 240 660 825
3 Ceiling Fan 6 400 240 2400 3000
4 Airconditioners 6 1110 240 6660 8325
5 Internal Lights 26 36 240 936 1170
6 Emergency Lights 0 40 240 0 0
7 Water Heater 4 1000 240 4000 5000
8 Expeller Fan 0 200 240 0 0
9 Bed Lights 0 12 240 0 0
10 Hand Dryer 0 600 240 0 0
11 Cooker Unit 1 240 32 7680 9600
TOTAL 29536 36920
S/No Walkway Load Description QTY Watts Voltage Current W VA
1 13amps Ring Main 4 240 4.8 1152 14402 External Lights 4 60 240 240 300
3 Ceiling Fan 1 400 240 400 500
4 Airconditioners 1 1110 240 1110 1387.5
5 Internal Lights 6 36 240 216 270
TOTAL 3118 3897.5
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
17/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 17 of 23 08/05/13
S/No
Admin Building Load
Description QTY Watts Voltage Current W VA
1 13amps Ring Main 125 240 150 36000 45000
2 External Lights 25 60 240 1500 1875
3 Ceiling Fan 70 400 240 28000 35000
4 Airconditioners 25 1110 240 27750 34687.5
5 Internal Lights 100 36 240 3600 4500
6 Emergency Lights 5 40 240 200 250
7 Water Heater 10 1000 240 10000 12500
8 Expeller Fan 10 200 240 2000 2500
9 Bed Lights 0 12 240 0 0
10 Hand Dryer 5 600 240 3000 3750
11 Cooker Unit 0 240 0 0 0
TOTAL 112050 140062.5
S/No Building Description W VA
1 Gate House Load Description 3040 3800
2 Waiting Room 12468 15585
3 Maternity Ward 55730 69662.5
4 Family Medicine 4952 6190
5 Children's Ward 63712 79640
6 Private Ward 60608 75760
7 Men's Ward 51916 64895
8 Women's Ward 59518 74397.5
9 Canteen 19480 24350
10 Store 6978 8722.5
11 Isolation Ward 41018 51272.5
12 A& E Ward 127186 158982.5
13 Luandry 29536 36920
14 Walkway 3540 4425
15 Prayer Room 3118 3897.5
16 Admin Building 112050 140062.5
TOTAL 654850 818562.5
TOTAL KVA 818.5625 KVA
TOTAL KVA AT 70%
DIVERSITY 573 KVA
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
18/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 18 of 23 08/05/13
4.0 RECOMMENDATIONS
The Schematic below depicts an overview of the proposed Power generating and distributionsystems.
PHCN Isolator
SW#1Automatic
Change-OverPanel #1
LowVoltageOve
rheadLine
InternalDistribut
ionsystem
Emergency supply to selected wards and theater
4corex
120mmsq
PVC/SWA/PVCCable
G
500KVA
(Existing)
PERKINS
Generator
PHCN Isolator
SW#2
From 500KVA
Xformer Sub-Station
Automatic
Change-Over
Panel #3
G
350KVA
Proposed New
Generator
Automatic
Change-Over
Panel #4
Proposed Typical Change-Over
Arrangement to be Located in Each
Building Requiring Emergency Power
Supply
BattInverter System
Providing continuous powerto Life Saving Equipment
and all Lighting as
Connected to DB#1Distribution
Panel
# 1
Distribution
Panel
# 2
Lighting & Critical
Equipment
Non Critical
loads
G
750KVA
(Future)
Proposed New
Generator Automatic
Change-Over
Panel #2
Bus-Tie
Interlocked Switch
Fig 16 Proposed Overall Generation and Distribution Schematic
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
19/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 19 of 23 08/05/13
The above schematic refers:
POWER PLANT
Install one(1) 500KVA generator(existing) and make provision for a future 750KVAgenerator thru the use of a automatic change-over switch #2 system.
Tie-In PHCN utility supply thru a main automatic change-over switch #1 cascaded tosecondary changeover switch #2
Install adequately rated fused Isolator units for PHCN tie-in to change-over switch #1
Install one(1) 350KVA generator unit for emergency load supply thru automatic changeover switch unit #3
Tie-In PHCN thru a fused isolator connected to automatic change-over switch #3
Install a split bus main Low Voltage(LV) panel rated for at least 2000Amps continuousduty
DISTRIBUTION
Connect Output of main change-over switch #1 to one side of the split bus-bar LV Panelthru to the existing over head conductor distribution system.
Connect Output of change-over switch #2 to the other side of the LV Panel bus-bar thruto service circuit breakers feeding identified critical load centers.
Install dedicated service cables from the Power plant LV Panel to each identified criticalload center utilizing cable trays to be mounted along the newly installed walkway roof
trusses
Install manual/automatic change over switches #4 at each critical load center as identifiedto enable selection between normal mains power as supplied from overhead lines andemergency power as supplied from dedicated service runs from the Power Plant.
Install adequately sized inverter/UPS systems within each building identified as criticalload and connect output of change-over switch #4 as its input.
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
20/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 20 of 23 08/05/13
Connect Inverter/UPS output to distribution panel #1 which should be wired to power allcritical loads and Lighting within the building
Connect distribution panel #2 directly to the change-over switch #4 output and wiredistribution panel to feed all high demand loads within the building including airconditioners, water heaters and cooker units.
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
21/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 21 of 23 08/05/13
PROPOSED PROJECT PLAN
ID TASK DESCRIPTION IN SUMMARY
WK 1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 Wk10 WK11 WK12
1 Project Start
2
Site Evaluation and Load Flow and Fault
Studies For Approval of Construction
Drawings/Specifications
3 Procurement
4 Mobilize to Site
5
Installation of Generator & Change Over
Switches
6 Installation of Main LV Panel
7
Installation of Support Cable Trays for
Dedicated Emergency Service Cables
8 Install Emergency Service Cables
9
Install Inverter/UPS Systems in identified
Critical Load Centers
10
Install Change-Over Switchs in identified
Critical Load centers
11 Testing and Commissioning
12 Project Close-Out
IPGRUPPS EXECUTIVE COMPANY SUMMARY
IPgrupp.Engineering has been serving the small and medium sized Electrical & Specialty ControlIndustrial community in Nigeria since 1996.
Our strength lies in the ability to provide dedicated
Construction, commissioning and specialistelectrical/Instrumentation engineering design support servicesfor industrial production facilities. Our services include powersystem design & planning, electrical/Instrumentationprocurement, Construction coordination and maintenancesupport for electrical power distribution systems. .
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
22/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
Page 22 of 23 08/05/13
From conceptual power system studies to commissioning, IPGRUPP Engineering have averifiable track record of vast technical expertise, equipment and network of technical resourcepartners to complete projects safely, cost- effectively, within schedule and to requiredspecifications. Over the years we have developed and attracted field tested site team techniciansand engineers, extensively supported by experienced Project Managers and design Engineers.
Our core service areas include:
Design and Installation of Back-up PowerSystems including cable distribution.
Design and Installation of SurveillanceSystem.
Design and Installation of Fire & Gasdetection and Alarm System.
Design & Installation of alternative energypower supply systems.
Installation of Power Monitoring & ControlSCADA Systems.
IPgrupp.Engineering is a limited liability company with corporate registration number RC 424165.We have our main office at Lekki-Ajah, Lagos with operations yard and satellite offices in Warri,
Abuja and Port-Harcourt in Delta and Rivers State respectively.
We have successfully completed several Electrical and Instrumentation Projects eitherindependently or as a value adding team member in multiple company efforts. Notable among thenumerous projects include the deployment of real-time gas monitoring SCADA system for fiscalmonitoring on behalf of the Department of Petroleum Resources, Obudu Cattle Ranch (Cross-Rivers)- electrical and network systems, University of Western Delta, Oghara- Electrical,Communication, Safety and Fire Alarm structured cabling and active device systems amongstmany
-
7/21/2019 Hospital Electrical Systems Preliminary Site Visit Rpt Rev2
23/23
SITE VISIT REPORT & RECOMMENDATIONS DOCUMENTELECTRICAL SYSTEMS UPGRADE
OUR VISION STATEMENT
Achieve sustainable and significant service capacity for Enginering Design, Construction,Maintenance and Manufacturing in West Africa and beyond.
OUR MISSION STATEMENT
To Provide excellent and sustainable Engineering Services to the Oil & Gas and Power Sub-sectors of West-African energy industry through effective alliances, local capacity developmentand good business practices.