Holland High SchoolConstruction Update 2011-2012June 8, 2011
What Construction Managers Do GDK and OAK Joint Venture Construction Managers: Schedule,
Coordinate, and Conduct the Construction Project
Architects and Engineers: Design the Facility
Safety Plan for Students & Staff Fencing/Barricades Contractor Identification
Neon Safety Vests Hard Hats
Signage Hours of Operation—7 am to 5 pm
primarily although occasional off-shift work will occur
Contractors and Students Contractors are told to avoid
interacting with students in order to protect students. They are here to do a job.
GO Holland and GMB are committed to being part of the educational process. If staff are interested in utilizing the design and construction process as part of their curriculum, please contact Jim English or Rhonda Klomparens.
Summer 2011 Work Continue work on the Soccer/Tennis
Complex across Van Raalte. Demolition of the tech wing
Furniture removed the week of June 13th.
Demolition begins in late June. Work on the track will begin in July. Construction of the 10-12 wing will
begin in late summer/early fall.
Summer 2011 Disruptions Parking will change. See the
diagram. The building will be shutdown for a
couple days in July when the water will need to turned off. The dates of this are yet to be determined. Check your email or the Build 21 website if you need to know the dates.
PARKING 2011-2012 Student Parking Staff Parking Visitor Parking Contractor Parking
Parking 2011-2012 Only buses will be allowed in the
oval. Student drop-off will occur on 24th
and 27th Streets. Students will park by the boiler
house and across Van Raalte at the soccer/tennis facility.
2011-2012 will be challenging for parking.
Parking 2011-2012 We will have people on-site to help
when students come back to school. If you are willing to help with this the first week, please let Marc VanSoest know.
Please consider arriving extra early next fall during the first week in order to lessen the traffic and potential hiccups.
PHASED CONSTRUCTION Demolition Plan Upcoming Construction Plan 2011-
2012
2011-2012Anticipated Disruptions Center science classroom on the 2nd
floor will be disturbed when the 10-12 wing is constructed. We are looking at either of these options, with a final decision in the fall once the design is 100% finalized: The room will not be available after
the first trimester. The room will lose about 12 feet of its
lab space but will be usable with temporary walls in place.
2011-2012 Anticipated Disruptions Science rooms on either side of the
center science room will lose some of their windows during 2011-2012.
Two math rooms on the first floor will lose some of their windows during 2011-2012.
Communication and Questions Communicate all safety concerns to a
high school administrator. If you have questions about the
designs, please follow the website or talk to a high school design team member.
If you have questions about the technology implementation, please talk to a high school design team member.
Communication and Questions Please feel free to email or call Jim
English as well.