Head Lines:
1. About Gulf Technology Co…………………………………….
a. History…………………………………………………...
b. Profile……………………………………………………
c. Organizational structure…………………………………
d. Employees, Equipments & Vehicles…………………….
2. One of the major projects accomplished for kharafi national co.
3. Clients &projects………………………………………………..
4. References………………………………………………………
a. Commercial Registration No……………………………..
b. Chamber Of Commerce No………………………………
c. Sample snap shot of Kharafi National Co. Project……….
d. Sample snap shots of deferent projects, equipment & tools with brief
explanation………….
About Gulf Technology:a. History:
Gulf Tech Co. started contracting in medium volt projects on 1999 with different contracts in main-tains of 11/0.415 KV transformers for commercial buildings, and HV testing of 11KV cables. Soon we started handling installation projects for 11KV switchgear panels and transformers with testing and commissioning. We could gain the confidence of our clients by our professionalism and experience, in which we have the most experienced engineers and foremen in that field who have work experience for more than 25 years with MEW Kuwait.
b. Gulf Technology’s Profile:
Company’s Name: Gulf Technology General Trading & Contracting Company
Year Of Establishment: 31/07/1999
Head Office Address: Hawally – Qutaiba St. Shikha Complex Third Fl.
Postal Address: P.O.Box 1071 Salmiya 22011 – Kuwait
TEL: 22630512 FAX: 22630514
Email: [email protected]
Commercial registration No 993/1999 (copy Attached)
Chamber of Commerce. No. (copy Attached)
Paid Capital: KD 150000.00
Eng. Fadi Al-Daour General Manager [email protected] mob.: +965 9 7444 131
Mr. Eyas AL Daour Deputy [email protected] mob.: +965 9 765 4654
Mr. Yousef Al Daour Finance anf [email protected] mob.: +965 9 951 7267
Mr. Anas Al Daour Sales & [email protected] mob.: +965 9 933 6209
Eng. Ershad Mohamd Electrical Engineer (execution)[email protected] mob.: +965 9 772 7514
Eng. Suha Electrical Engineer (Marketing)[email protected] mob.: +965 9 775 7516
Eng. Rem Site [email protected]
mob.: +965 9 775 7814
Mr.Ahmad Abd [email protected] mob.: +965 9 77 63215
d. Employees, Equipments & VehiclesMan Power: (pay roll)
• Management Staff 5 nos.
• Tech. Staff 27 nos.
• Engineers 4 nos.
• Foreman 4 nos.
• Cable Jointers 3 nos.
• Electricians 8 nos.
• Drivers 4nos.
• Assistants 8 nos.
MEW approved staff• Senior engineer• Senior foreman for testing• Senior foreman for erection• Cable jointers• Electricians for testing and erection
Vehicles:
• Saloon 3 nos.
• Jeep 4 nos.
• Van 2 nos.
• Half lorry 2 nos.
Tools and Equipment• Diesel Generator• Boring machine for earthing pits• Cable trailer• Megger 1 KV• Megger 5 KV• Earth tester• Avo meter• Secondary injection test set• Primary injection test set• HV DC cable testing set 40kV• Welding set• Oil pump• Crimping tools
One of the major projects accomplished for kharafi national co.
Included some pictures utilizing the scope of work of one of the best projects made, It was for Kharafi National Co. as one of our major clients in MV projects.
Client: Kharafi National Co.
Project: Sulaibiya Waste Water Treatment and Reclamation Plant, KUWAIT.
Type Of Work: Installation, testing & commissioning of 11KV SwitchgearBattery chargersOil and dry transformers,MV cablesPilot and control cableLV cablesEarthing system and all related works for 13 substations with switching sta-tion.
Job included the following:
• Installation, testing & commissioning of 101nos. MV pales• Installation, testing & commissioning of 33nos 1600KVA Transformers• Installation, testing & commissioning of 13nos. Battery Chargers• Installation, termination, testing & commissioning of 11KV 3C 185mm cables• Installation, termination, testing & commissioning of 1C 800mm cables• Installation, testing & commissioning of 27 cells 11KV switching station• Earth system for all the above.
Work was Done according to MEW standards. And handed over in three month.
We Confirm:
• Our engineers, foremen, jointers and electricians are MEW approved and worked in several MEW MV projects.
• Our works comply with MEW latest specifications and regulations.• Our equipments and materials comply with I.E.C or B.S.S.
Clients & Projects:
Mushreff Co.Replacement of 2nos. Oil type 11/3.3kv transformers with 2nos. 11/3.3kv dry type 2500kva with all related cable works with testing & commissioning
Al-Ghanim Int.Delivery, installation and commissioning of 1250kva 11kv transformer to com-mercial bld.
Al-Ghanim car showroom
Supply & installation of 11kv switch board, battery charger, 2nos. 1250kva transformers and L.T Panel with all related works, with testing and commis-sioning.
Al Ghanim Interna-tional
Testing and commissioning of MV equipments and work for Shwaikh power station upgrade
KGLComplete warehouse electrical supply & installation. electrical panels, cable laying cable tray, power & light points, etc.
Kirby
Design, supply, installation, testing and commissioning of a complete 650KW distribution system for the new machinery in Kirby factory and gain MEW approval and energizing. Consists of Electrical Panels, Bus duct, trunking system. Cable, etc...
C&S BUS DUCT SYSTEM
Supply, installation, testing and commissioning of Bus bar trunking system for different projects in Kuwait, KOC, KNPC, Al Nassar Tower, Holliday Inn & a lot more
The National Co. Ardiya Pumping Station all MV Installation, testing & commissioning
The National Co. Khiran station, All cable, cable tray, panel installation and earthing works
The National Co. Suibiya sewage treatment plant, all MV installation, testing & commissioning
The National Co. Sulaybia Camp, All MV installation, testing & commissioning
The National Co.Sheikh Jabber Al Ahmed Stadium. power cable, cable tray and panels Installa-tion
The National Co. Mina Abdulla Kharafi Factory. All electrical Works.
Al Ghanim Int. Shwaikh Power Station, New Gas Turbine Testing Of All 11KV system
Doniya Int.KOC, Supply, Install, Testing & Commissioning of Package substations and connect to existing 11KV network with modification on existing panels for protection.
Kirby Factory All electrical works from MV to LV ( 4 substations with 8 transformers)
Al Ghanim Group. Modification of Ahlia Switchgear from 100/1 to 400/1 in Arifjan Camp. 2 units.
Al Nassar TowerSupply & Install C&S Bus Duct System 1000, 1250 & 1600A with all related termination, testing & commissioning.
Holiday Inn Supply of 2000A C&S Bus Duct system with testing
Crown PlazaSupply and Installation of 2nos ABB dry type 2500kVA 11/3.3kV Transformer with ABB 8 Panel 3.3kV switchgear for upgrading the chillers system.
Kharafi National 11kV Panels, Transformers, VFD’s and MLTP’s installation at AlZour station
Al Ghanim Interna-tional
Testing of 11kV system (gas turbine, Panels, Transformers, controls, cable….) at al Al Zour Generation plant
Kharafi National Upgrade of Al Sulabiya treatment plant earthing system
Toltest Inc.Supply, Installation and upgrade of existing 11kV ring with new UDS’s and RMU with all required cable laying and installation at Camp ARIFJAN
ECC. Electrical Installation at Satellite farm – Camp ARIFJAN
ECC 11kV Installations at Kuwait Navy Base
Discovery Mall Cable installation and termination works
Tpltest Inc.Supply and installation of 150kVA DG sets with ATS’s and synchronizing for K-Crossing camp boarder
Gravity Tower Supply of C&S Bus Duct System – BIG
Salmiya New Hotel Supply of C&S Bus Duct System – Gulf Engineering
Al Najat School Supply of C&S Bus Duct System – Amal United
Mubarak Hospital Replacement of all old MLTB’s (10 no.) with new without interrupting hospital operations.
MOJ Supply and install new MLTP & ATS to replace the existing at Hawally court house
Kharafi NationalAll power installation, 11kV SWG, Transformers, MLTB’s, PFCP, ATS’s and cabling at AL Hamra Tower (tallest Tower in Kuwait)
MODSupply and install two 11/0.415 kV Package substations (3 way 11kV RMU, Transformer, MLTB & ATS for Generator – special design made by us)
American embassy IBB - KTS
Installation of 11kV switchgear ABB make with all related substation work at International broadcasting bureau
IEPC Installation of IEPC 11kV SWG & Transformers at New Khiran City
KOC Supply of two package substations 11kV / 440V (1600 & 1000 kVA) with RMU and MLTB
Kharafi National Design Supply & install of 11/0.415 1600kVA transformer package for Ardiya sewage plant
Al Jahra HospitalDesign, Supply and install of Generator power plant consists of 4nor 2000kVA Generators, totalizing and synchronizing panels, 6nos. 1600kVA transformers, ATS’s, MLTB’s, PFCP and cabling
For projects updates visit www.gulftechco.com
References:
Installation of Ahlia 11kV SWGR @ Sulaibia sewage plant
Termination of 11kV multi core cables
Replacement of low tension boards @ Mubarak Al Kabeer Hospital
Installation of Diesel Generators with ATS @ remote locations