Transcript
Page 1: Guia Rapida Super Adobe

8/11/2019 Guia Rapida Super Adobe

http://slidepdf.com/reader/full/guia-rapida-super-adobe 1/3

EMERGENCY

ANDBAG

HELTER:

UICK

RAININGUIDE

1) Collect

he tools

above.

2) Preparehe earth mix which

s stabilized

with cement,

ime,or asphaltemulsion.

3)

A

water o

ball ogether

when squeezed,

et

not leave he hand

wet. lf no cement,

ime or

barbedwire s available,

(clay-sand)

or a

temporary helter.

Experimental:

ry

snow

n

bags

and compact.)

otu*#@*

tü o

EXTRY

%'

DOME PLAN

EMERGENCY

HELTER

4)

Place

he door

away rom

wind and rain.5) Dig

he

foundation

rench

L2

(3O

cm) deep.

6) Leveland compact

7) Place

he

bag

n

the

trench,

old

the end under o close,

and start

f i l l ing upright

¡kea short

column

using

ong

standard

andbags).

he oundation

wil l

be

2-3

completed

ag

rows.

8) Always

ut

in

2-3 cans of earth and shake o the end.

9) Use

gravity's

help by sloping he bag

on

your

eg, and

backwards

s

it f i l ls.

Do not strain

(if

it is

hardand eels

heavy

ou

are

not doing

t right).Let he

bag i l l as

full as

check

he

position

with he compass ool.

10)

Twistand

uck under

he bag ends

o close.

11)

Compact

he

illedbagas

hardas

you

can

using

tamper,

o make

a smooth, olid,

uniform lock.

Only om

earth

becomes

trong.

2)Attach ontinuousarbed

ire:1 wire

ordomes

p o 12 ft

(3.7m),

wires

or arger

breaks

ccur,

verlap

he wiresby

2ft.

(65

cm).13)Continue

oil ing

ags.

Page 2: Guia Rapida Super Adobe

8/11/2019 Guia Rapida Super Adobe

http://slidepdf.com/reader/full/guia-rapida-super-adobe 2/3

14

15

CenterCompass

Height

Compass

1,4, 5) You

must use 2 Compasses o

make

he dome

shape.

Use

chainsor other

non-stretchy able-rope. ttachon

center CenterCompass), nd extend h e lengthat every owaccordingo a secondone at the perimeter HeightCom

bagsdo not conform

o the comoass

emove

hem and re-build.

16) Pre-cut ags

or a dooruray

nock-out

anel,

or for

windows.

f

stabilized,he earth

must be cut

after ampingat e

don't let the

cut bags stick

ogether

a$ain.

7)

Punch

out

pre-cut anels

o open he door or

window

after at

least

5 b

aboveare completed.

8) Insert

pipes

or vents

or windows,

loped o

outside or rain.

19) Coil upper

ows,but

don't stand

on the wet

bag. 20) Fi lland

place

each bag

parallel

o the

row

belowand

work t

nwards

o meet he compass

circle

pull

or tamp).Tamp

he bag with a

gentle

slope o the outside.Close he top or

l

skylight.

1) Add a

protect¡ve

ntrance

door

vault)

o

buttress he door opening.

Entry s archedor sloped,short

or

ta

22) Plaster

he exteriorbeforebagsdlsintegrate

nd 23) waterproofwith ocally uitablematerials o resist

moisture

a

24) On op,

finish

with

a

water-resistant

ementor lime

plaster

such as Reptile

stabil¡zed

arth mud-balls)

ayered ro

:cp, or

25) a smooth

cementor l ime

plaster

in ish.

r

q

f

, ,k

{.- T-T,ertfussti|tst*

,¡;',t'.

Page 3: Guia Rapida Super Adobe

8/11/2019 Guia Rapida Super Adobe

http://slidepdf.com/reader/full/guia-rapida-super-adobe 3/3

Left:

Axonometric

f the

dome co

better

show

he domed

shape,

h

walls,

door ault,

andwindow

ye

not

shown n

this

drawing.)

3i*3

. t ,

.

n? ñ

i'

  ,{

i¡ .

'

-*.

, r . .

- ,

;.$*

¡-

q

üARKER

R¡NGS

Above:

Using

he wo chain

omp

tt

í r&.

,'J

, ,

(

f.

,

t

t

i

24 Dome rows (

.

-$p¡i¡gli¡¿

2 Base ows

3 Foundationro

4¿¿

rn

Emergency

Shelter:

l0

ft.

/

3.0 m. interior

diameter

dome

(same

or

8

-

12 t.

I

Z.S 3.7

m range)

Compass

section,

Springline,

and

essential dimensions

,

,{

*

t

h. '

' , i

'

t

i '

(

l ' t

'q ' { '

| ;'

,i

l

.:¡,)

.\',r'

i

'

-

.

,'.

'

-

i

u*r , ' . l l -

,^ '

,

* ' r

.1 . ;

l

l i r.

C>

,.¡

+

o

o

E

,g

t

tl

I

+

(o

o

Trench or

foundation

ows

* ru-q,9-9


Top Related