What this presentation covers
Traffic control measures
Traffic Detour
Municipality & Traffic Police Regulations
Safety PPEs
-
7/31/2019 Guard Rail Construction Safety
3/12
Abu Dhabi Traffic Dept. Regulations
Flaggers and otherworkers assigned traffic
control responsibilities.
Flagman is positionedproperly at work area
Flagman
-
7/31/2019 Guard Rail Construction Safety
4/12
Abu Dhabi Traffic Dept. Regulations
Must develop and execute a detoursign and marking plan
Detour plan must be executedbased on road speed and trafficconditions.
Detour length on highways 150m-200m
Traffic Detour Plan
-
7/31/2019 Guard Rail Construction Safety
5/12
Abu Dhabi Traffic Dept. Regulations
Ensure that safety cones ispositioned before starting thejob.
Distance between Safetycones is 3-5m must betighten together with rope.
Ensure that the safety conesmust be positioned inside theshoulder line
Safety Cones
-
7/31/2019 Guard Rail Construction Safety
6/12
Abu Dhabi Traffic Dept. Regulations
Ensure that adequate trafficsigns is available beforestarting the job.
Arrow signs must be providedat taper and before workingarea.
Ensure that the Men at work& Arrow signs must bepositioned appropriately atwork area.
Traffic & Warning Signs
-
7/31/2019 Guard Rail Construction Safety
7/12
Abu Dhabi Traffic Dept. Regulations
Ensure that Traffic Dept.Approval report is available atsite before starting the job.
Ensure Updated approvalreport with stamp from trafficdepartment.
Ensure traffic detour plan iswith team leader / driver/Foreman
Detour Plan & Traffic Dept. approval
-
7/31/2019 Guard Rail Construction Safety
8/12
Abu Dhabi Traffic Dept. Regulations
Ensure that proper safety PPEs like SafetyShoe, Helmet , gloves, high visibilityjacket..etc. are available.
Always wear safety PPEs when working atsite.
Safety PPEs- Safety Boot, Hat & Gloves
-
7/31/2019 Guard Rail Construction Safety
9/12
General Safety requirements
Ensure all fuel containersare properly labeled andprovide with dip tray.
Check all gas cylinders
and gauges are withoutany damage.
Avoid Spillage of Fuels.
-
7/31/2019 Guard Rail Construction Safety
10/12
Abu Dhabi Traffic Dept. Regulations
Ensure all safety measuresare taken before startingthe job
Safety cones & traffic signsmust be positioned beforecommencing job
AlwaysSafety
First..
-
7/31/2019 Guard Rail Construction Safety
11/12
Safety is Important for You aswell as for Khalaf Sultan Gen.Cont. Est.
Always ensure availability ofSafety Items at site beforecommencing the job..
Any Questions..??
Safety - Inspections
EVEN IF THE WORK TAKES ONLY 10 15
MINS ENSURE SAFETY..!!!
-
7/31/2019 Guard Rail Construction Safety
12/12
Work Safe.. With all safetyprecautions & guidelines
Safety is the responsibility ofall..
Any Questions..??
Conclusion
http://www.google.ae/imgres?imgurl=http://ohs-training.net.au/wp-content/uploads/2011/10/Occupation-Health-And-Safety-Training.jpg&imgrefurl=http://ohs-training.net.au/worksafe-no-one-to-blame-in-truckers-death&usg=__mvOHmkFiRXeErPA1MX4__MHxthg=&h=543&w=308&sz=41&hl=en&start=93&zoom=1&tbnid=hGzpibrSekescM:&tbnh=132&tbnw=75&ei=NpQCUND6BMmBhQeVhrzyBw&prev=/search%3Fq%3Dsafety%2Btraining%2Bphotos%26start%3D80%26hl%3Den%26sa%3DN%26biw%3D1366%26bih%3D643%26tbm%3Disch%26prmd%3Dimvns&itbs=1http://www.google.ae/imgres?imgurl=http://www.kiss-training-uk.co.uk/wp-content/uploads/health_and_safety_training_courses.jpg&imgrefurl=http://www.kiss-training-uk.co.uk/health-safety-training-courses/&usg=__Bpw59dnUeUXEOytfe8OPrBSwC0o=&h=200&w=300&sz=28&hl=en&start=81&zoom=1&tbnid=H-ghpndKLBpkHM:&tbnh=77&tbnw=116&ei=NpQCUND6BMmBhQeVhrzyBw&prev=/search%3Fq%3Dsafety%2Btraining%2Bphotos%26start%3D80%26hl%3Den%26sa%3DN%26biw%3D1366%26bih%3D643%26tbm%3Disch%26prmd%3Dimvns&itbs=1