Creating a sustainability experience, connecting global and local issues
& promoting sustainable ways of living to
safeguard future communities and ecosystems
![Page 3: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/3.jpg)
Integrated Greenhouse ProjectPhase 0 (2003/4)
SEEDA 2003Seed funding - £40k
GreenSys 2004Established partnerships with Professor Gerard Bot and team at Wageningen University, and the renewable energy team at TV Energy
![Page 4: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/4.jpg)
EC Life Environment Unit
2.3m € funding Integrated Greenhouse
Project
![Page 5: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/5.jpg)
Integrated Greenhouse ProjectPhase 1 (2005/6)
Human Impact Building
Purpose: To demonstrate sustainable low-carbon design, operation and use
![Page 6: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/6.jpg)
Our Heating Journey… from oil to local wood chip
... the first public indoor rainforest garden to convert to wood chip heating
CO2 emissions per unit of energy supplied
0
50
100
150
200
250
300
350
400
450
Gra
ms
of
CO
2 p
er
kW
h
Woodfuelled heat
Wind power
Solar PV m-si
Solar PV p-Si
Natural gas heating
Light fuel oil heating
![Page 7: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/7.jpg)
![Page 8: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/8.jpg)
![Page 9: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/9.jpg)
![Page 10: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/10.jpg)
![Page 11: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/11.jpg)
• Integration, part 1: biomass & oil
– continuity of supply?– put all heating devices ‘behind the heat storage
bunker’?
• Integration, part 2: ground source heat storage & biomass
Some Lessons
![Page 12: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/12.jpg)
Integrated Greenhouse ProjectPhase 2 (2007/8)
Green Greenhouse / Vertical Soil Heat Exchanger (VSHE)
The Problem
Unsustainable food (crop) production in energy-wasteful greenhouses, using non-renewable energy
Lack of integration of greenhouses with other buildings
Lack of investment in low-carbon design
Confusion about what is ‘best practice’ among growers and government
![Page 13: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/13.jpg)
Download presentations at www.livingrainforest.org/seminardownloads.htm
![Page 14: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/14.jpg)
Direct energy expended by various sectors of agriculture in the UK by use in 2005
(from: Warwick HRI 2007).
![Page 15: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/15.jpg)
Horticulture 101• Fruit & vegetables account for 2.5-3%
of UK greenhouse gas emissions (Garnett, 2006)
• UK horticulture accounts for about 28% of all energy used in UK agriculture
• UK protected crops covering 749 ha used 3,318 GWh / year (Warwick HRI, 2007)
![Page 16: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/16.jpg)
Integrated Greenhouse ProjectPhase 2 (2007/8)
Green Greenhouse / Vertical Soil Heat Exchanger (VSHE)
![Page 17: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/17.jpg)
Let’s build a sustainable future
together • Blue sky thinking is needed
• Boldness or bust
• Beyond immediate CO2 reductions to potential for long term behaviour change (production methods, consumption patterns)
![Page 18: ‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008](https://reader030.vdocuments.site/reader030/viewer/2022032804/56649e465503460f94b3b082/html5/thumbnails/18.jpg)
Good Luck!
The Living Rainforestwww.livingrainforest.org
Integrated Greenhouse Projectwww.livingrainforest.org/ig T: (01635) 202444