Download - GEOSS Common Infrastructure
![Page 1: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/1.jpg)
GEOSS Common Infrastructure
Slides prepared by Alessandro Annoni, JRC
Jay Pearlman, IEEE and GEO Secretariat
![Page 2: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/2.jpg)
GEOSSComponent Registry
Service Registry
GEOSSStandards Registry
Special ArrangementsRegistry
references
GEO Portallinks
GEOSSClearinghouse
Catalogues Services
User
accesses
accesses
Accesses allRegistered Community Resources
searches
GEOSS Common Infrastructure
GEONETCast
Websites/Webportals
Catalogues
Registered components External resources
Websites/Webportals
GEO Web Sitelinks
Links to Other Community
ResourcesRegister
Documents
RSS
CatalogQueryClients
GEOSS Common Infrastructure (GCI)
![Page 3: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/3.jpg)
Potential Component provider
Portal Clearinghouse Component and service registry
Standards and Special Arrangements Registry
ESA/FAO X
ESRI X X
Compusult X X
George Mason Univ. X
IEEE X
FAO/GeoNetwork X
![Page 4: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/4.jpg)
“The Initial Operating Capability phase (IOC) will last for up to 12 months, with a target launch date in May 2008.”
“The IOC will allow the community to gain practical experience with many issues that have been under discussion during the early development of the GCI”
Key issues: long-term cost implications, systems operations and maintenance, proprietary vs. open-source concerns, single vs. multiple Portals and Clearinghouses, access procedures, … and user community requirements.
Est
ablis
hin
g t
he
GC
I
![Page 5: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/5.jpg)
Initial Operating Capability
• IOC should started end of May 2008• Letter of announcement – draft from Geo Sec
– Evaluation– Registration of components, services, standards and
best practices
• Tactical and Strategic Guidance Documents available for providers to register services
• A user feedback form has been prepared and being discussed.
![Page 6: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/6.jpg)
![Page 7: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/7.jpg)
![Page 8: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/8.jpg)
![Page 9: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/9.jpg)
![Page 10: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/10.jpg)
IOC Task Force (Proposals)• ADC: Pearlman, DeLoatch, Shibasaki, Annoni,
Petiteville • CBC: Hilcea Santos Ferreira,
Gordon Bridge, Alan Edwards • UIC: Gary Foley, LeDrew• S&T: Stuart Marsh, David Halpern
However Composition to be discussed at next C4.
![Page 11: GEOSS Common Infrastructure](https://reader036.vdocuments.site/reader036/viewer/2022082612/56813c0e550346895da58072/html5/thumbnails/11.jpg)
GCI and CB Committee• Evaluate Portals
• Provide User feed back
• Register capacity building components (Content of CB portal?
• Discuss relationship between CB Portal and GCI