Download - G. Charles Allen, P.E
SAYANO-SHUSHENSKAYA
G. Charles Allen, P.E.Chief, Turbomachinery Section
Hydroelectric Design CenterHydroelectric Design Center
Southwestern Federal Hydropower C fConference
Branson, Missouri
10 June 2010
BUILDING STRONG®PORTLAND DISTRICT 1PORTLAND DISTRICT 1
Russian Hydropower Accidenty p
The slides that follow were taken from many different sources and represent the facts as we know them (Note: Information is sparse
d k h ) Thi i i fand sketchy). This presentation is for internal use only.
BUILDING STRONG®PORTLAND DISTRICT 2PORTLAND DISTRICT 2
Sayano-ShushenskayaU it 2 F ilUnit 2 Failure
Sayano-Shushenskaya, Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 3PORTLAND DISTRICT 3
The PlantThe Plant
Powerhouse: Sayano-Shushenskaya
Owner / Operator: RusHydro
Installed Capacity: 6400 MW. Largest power plant in
Russia and the world's sixth-largest hydroelectric plant by average
power generation.
Construction started in 1968Construction started in 1968
Power on Line (POL): 1978
BUILDING STRONG®PORTLAND DISTRICT 4PORTLAND DISTRICT 4
The DamThe Dam
Type: Arch (Looks like Hoover)Type: Arch (Looks like Hoover)
Height: 245.5 meters (805 ft) high
Crest Length: 1,066 meters (3,500 ft)
Crest Width: 25 meters (82 ft)
BUILDING STRONG®PORTLAND DISTRICT 5PORTLAND DISTRICT 5
Sayano-Shushenskaya
BUILDING STRONG®PORTLAND DISTRICT 6PORTLAND DISTRICT 6
Sayano-Shushenskaya, Russian Hydro Powerhouse
The DamThe Dam
Sayano Shushenskaya Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 7PORTLAND DISTRICT 7
Sayano-Shushenskaya, Russian Hydro Powerhouse
The TurbineThe Turbine
Francis type turbinesyp
Unit Rating: 640 MW each
N b f U it 10Number of Units: 10
Rated Head: 194 meters (640 ft) (275 psi)
Max Head: 220 meters (720 ft) (310 psi)
Unit Flow: 340 to 360 m3/s (12 000 cfs to 12 700 cfs)Unit Flow: 340 to 360 m3/s (12,000 cfs to 12,700 cfs)
Unit Speed: 142.8 RPM
BUILDING STRONG®PORTLAND DISTRICT 8PORTLAND DISTRICT 8
VideosVideos
Eyewitness Video - http://www.youtube.com/watch?v=egeABBr5hyA
CCTV Footage - http://www.youtube.com/watch?v=R1q-tiSWudw
BUILDING STRONG®PORTLAND DISTRICT 9PORTLAND DISTRICT 9
VideosVideos
BUILDING STRONG®PORTLAND DISTRICT 10PORTLAND DISTRICT 10
VideosVideos
BUILDING STRONG®PORTLAND DISTRICT 11PORTLAND DISTRICT 11
Major Issues of the DamMajor Issues of the Dam
BUILDING STRONG®PORTLAND DISTRICT 12PORTLAND DISTRICT 12
Inside of the Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 13PORTLAND DISTRICT 13
Sayano-Shushenskaya, Russian Hydro Powerhouse
Turbine Unit
Sayano-Shushenskaya, Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 14PORTLAND DISTRICT 14
The net result is the unit was ejected from the turbine pit…
The Head Cover Studs Failed
Sayano-Shushenskaya, Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 15PORTLAND DISTRICT 15
y y , y
The unit weighs 2960 tons (US) and the rotor weight is 995 tons (US). e g s 995 o s (US)
There are reports that the Unit was ejected verticallySayano-Shushenskaya, Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 16PORTLAND DISTRICT 16
There are reports that the Unit was ejected vertically 3 meter’s (about 10 feet)……..
….resulting in this.
Sayano-Shushenskaya, Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 17PORTLAND DISTRICT 17
y y , y
Inside of the Powerhouse
Sayano-Shushenskaya, Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 18PORTLAND DISTRICT 18
y y , y
The Damage
BUILDING STRONG®PORTLAND DISTRICT 19PORTLAND DISTRICT 19
Sayano-Shushenskaya, Russian Hydro Powerhouse
Sayano Shushenskaya Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 20PORTLAND DISTRICT 20
Sayano-Shushenskaya, Russian Hydro Powerhouse
Sayano-Shushenskaya, Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 21PORTLAND DISTRICT 21
y y , y
BUILDING STRONG®PORTLAND DISTRICT 22PORTLAND DISTRICT 22
Sayano-Shushenskaya, Russian Hydro Powerhouse
Sayano-Shushenskaya, Russian Hydro Powerhouse
BUILDING STRONG®PORTLAND DISTRICT 23PORTLAND DISTRICT 23
y y , y
Aggravating Factors Before Th A id tThe Accident
Severed communications from Bratsk powerhouse.17 August 1:20 am, fire at Bratsk powerhouse downstream of Sanyo. The ability of Bratsk to provide AGC and other ancillary y y p yservices to the power grid operator lost.
AGC is moved from Bratsk to Sanyo a high head plantAGC is moved from Bratsk to Sanyo a high head plant.
Design of the studs & no inspection requirements.g
No pretension on the studs.
BUILDING STRONG®PORTLAND DISTRICT 24PORTLAND DISTRICT 24
Aggravating Factors Before Th A id t C t’dThe Accident, Cont’d
New Governor controls on Units 2, 5 & 6.
W t id b i t ib t d t hi h ib tiWorn out guide bearings contributed to higher vibration.
Cavitation had contributed to vibration / unbalanced runner.
BUILDING STRONG®PORTLAND DISTRICT 25PORTLAND DISTRICT 25
What Happened?What Happened?
The accident was primarily caused by the head cover t d f ilistuds failing.
80 studs held the head cover down.41 studs had fatigue cracks2 t d d t d b t i2 studs were destroyed by tension6 studs completely undamaged, leading to the conclusion that no nuts were present.
Average fatigue damaged area exceeded 65% of the total stud cross section.
The cause of the failure is still being debated. Leading candidates are unit vibration, load rejection, or governor failure.
BUILDING STRONG®PORTLAND DISTRICT 26PORTLAND DISTRICT 26
a u e
Contributing FactorsContributing Factors
Studs not prestressed—or perhaps inferior steelFailure to monitor Head Cover Stud ConditionFailure to shut down upon increased vibrationCorporate Culture stressing profit/operation at the expense
of safetyof safetyInadequate vetting of new governorsAccepting as ‘normal’ the operation of the machine outside p g p
design specifications
BUILDING STRONG®PORTLAND DISTRICT 27PORTLAND DISTRICT 27
Could an Accident Like This Happen to the Corps?
YES
BUILDING STRONG®PORTLAND DISTRICT 28PORTLAND DISTRICT 28
IT’S NOT ONLY SAYANO !!IT S NOT ONLY SAYANO !!
THREE BREACHES IN PAST 20 YEARS
Manitoba Hydro Grand Rapids Unit 4Unnamed European PlantSayano ShushenskayaSayano-Shushenskaya
BUILDING STRONG®PORTLAND DISTRICT 29PORTLAND DISTRICT 29
THE BIG PICTURE LESSONTHE BIG PICTURE LESSON
IT IS NOT: MONITOR THE HEADCOVER STUDS
IT IS: MONITOR WHATEVER CONTAINS THEIT IS: MONITOR WHATEVER CONTAINS THE DEADLY ENERGY
BUILDING STRONG®PORTLAND DISTRICT 30PORTLAND DISTRICT 30
Recommendations to HQ USACE
Inspect all turbine head cover studs and nutsInspect all turbine head cover studs and nuts.
Verify that the emergency closure systems function at all plants and test the emergency closure gates under full unit flow.and test the emergency closure gates under full unit flow.
Verify all governor shut down and timing (wicket gate closure speeds).
Review Emergency Plans and Procedures
Maintain Staff CompetencyMaintain Staff Competency
Inspect turbine runners for cracks.
BUILDING STRONG®PORTLAND DISTRICT 31PORTLAND DISTRICT 31
Recommendations to HQ USACEUSACE
Inspect head covers for structural integrity.
Inspect penstocks for structural integrity.
Develop vibration limits and install vibration monitoring systems.
Re-examine the COE guidance on emergency gate closing time.
Provide adequate back up power capability to maintain plant control.
Assure that adequate engineering oversight is applied when major repair is performed or when energy containing components are disassembled or reassembled
BUILDING STRONG®PORTLAND DISTRICT 32PORTLAND DISTRICT 32