Transcript

FORIMMEDIATERELEASE ColorImageProvided

EngineeredRiggingSpeedsBridgeWork

RapidBridgeReplacementSystemSwapsRailroadSpansinOneDayRUSSELLVILLE,ARKANSAS,September26,2016—EngineeredRigging,innovatorsinmotion, today launched its newRapidBridgeReplacement System,which enablesrailroadsandtheirmaintenancecontractorstoexchangearailroadbridgespaninasingleday. Inaddition to substantial timesavings, the systemalsoprovidesa safermethodforbridgereplacementthanhydrauliccylinderapproaches.Manufacturedwith domesticmaterials in the U.S.A, Engineered Rigging’s 250-tonRapidBridgeReplacementSystemfeatures fourmechanicallyengaged liftcolumns(twoateachend),ahorizontal liftgirderconnectingthecolumns,drivabletrolleysthatguidethebridgespanalongtheliftgirderandtransportcartstoremovespansanddeliverreplacements.DemonstrationsoftheRapidBridgeReplacementSystemareavailableviavideoat(http://engineeredrigging.com/rapid-bridge-replacement-system/). To learn more,contact [email protected] or visit the company in booth 238 at theBreakBulkAmericas tradeshow September26–29 in Houston,Texas. BreakBulkattendees areinvitedtocelebrateOktoberfest inEngineeredRigging’s booth onSeptember27from5–8 p.m. andSeptember28from2–6p.m.

UniqueDesignImprovesSafety,ShortensBridgeClosuresUnlikehydrauliccylinderliftmethods,theRapidBridgeReplacementSysteminstallsontopoftherails,ratherthanunder,eliminatingtheneedforextensivebelow-railmodifications to adjacent sections. The enclosed lift girder doubles as a safepassagewayforcrewscrossingthebridgeoncethespanisremoved.Crews construct the modular system on a nearby spur so rail service is notinterruptedduringsetup.Thesystemassemblesinthreetofourshifts,shipsonfourorfivelegalflatbedtrailersandrequiresnospecialpermits.Safe,FastOperation“Dependingon thenumberof spans, railroads can safely andefficiently replace acomplete bridge in days rather than months,” explained Bogdan Gaita, vicepresidentofEngineeredRigging.This mechanically engaged lift system operates without cable drums or strands,which can fail, or hydraulics, which can leak. Its self-locking lift columns result insynchronized lifting and positive mechanical engagement. Even during a poweroutage,theliftcolumnsremainstable.Plus,thesystem’sremoteoperationenablescrewstocontrolliftingandtransportfromasafedistance.StandardConfigurationEngineered Rigging’s Rapid Bridge Replacement System features 250-ton liftingcapacityandcanreplacemostrailroadbridgespans.Itscomponentsinclude:•Four30-footliftcolumns•Twoliftcolumnconnectorbeams•Onecentralspanboxgirder•Twoadjustableladders•Twotrolleysanddrivesystems•Liftsystemtransportcarts•Bridgesectiontransportcarts•SynchronizedcontrolsystemwithpowerunitAboutEngineeredRiggingEngineered Rigging provides innovative heavy lift and hauling, fabrication servicesand engineering solutions to a wide range of industries. The company leveragesdecades of experience and awealth of technical expertise to overcome themostcomplex logistical challenges. For more information, visitwww.EngineeredRigging.com.MediaContact: MelissaHicks,MosaicMarketing,484.888.6766


Top Related