Purpose To introduce the potential Twin Ports Interchange
(TPI) project.
Jct I-35/I-535/Hwy 53 fka “Can of Worms”
I-535 at Garfield Avenue
Gather community input on needs and concerns
Discuss ongoing communication and input.
![Page 3: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/3.jpg)
Area Map
![Page 4: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/4.jpg)
Background State has applied for a federal Fostering Advancements
in Shipping and Transportation for the Long-Term Achievement of National Efficiencies (FASTLANE) Grant
If grant is received, project must start construction in 2 years.
Anticipate 3 years of construction.
If not received, will re-apply in 2017 (up to 5 years)
No design for project
Data collection/preliminary engineering will begin in this month.
![Page 5: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/5.jpg)
Potential Project Locations
![Page 6: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/6.jpg)
Interchange Details Built in 1969
1.6% of the bridge deck statewide
27 total bridges (includes 3 at Garfield & I-535) 25 overweight permit restricted
Nonstandard Geometrics
Left exits
Blind merges
Cannot handle oversized/overweight loads
![Page 7: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/7.jpg)
![Page 8: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/8.jpg)
Port Terminal Loads
![Page 9: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/9.jpg)
On I-535 at Garfield Avenue (3 bridges)
Proposed Project Locations
![Page 10: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/10.jpg)
Proposed Project Limits I-35 from Garfield Avenue to 27th Avenue West
I-535 from ramps onto Hwy 53 at Superior St.
![Page 11: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/11.jpg)
Project Assumptions No new permanent right of way
Two years of preliminary engineering
3 years of construction
Assumes accelerated techniques
Environmental Document − Categorical Exclusion
![Page 12: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/12.jpg)
Preliminary Project Goals Replace restricted bridges
Develop standard geometrics
No left exits/weaves
No blind merges
Direct connections for I-35, Hwy 53 and I-535
Minimize impacts to traffic and neighborhood
Improve Miller Creek and storm water management
![Page 13: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/13.jpg)
Construction Challenges Staging areas
Minimal R/W
Adjacent City street
Construction access
Traffic management
Curved beams, fabrication timelines
Accelerated construction
Time − anticipate 3 year construction
Minimizing neighborhood impacts
Railroad access
![Page 14: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/14.jpg)
Neighborhood concerns (to date) Pedestrian/bike access – connection to Lakewalk
Public art/aesthetics
Better local connection to Lincoln Park
Gateway to Lincoln Park
Reconnecting the neighborhood
Noise
Miller Creek plan
Lines of sight (blind merges)
Reconnecting the neighborhood
Others?
![Page 15: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/15.jpg)
Preliminary Costs Entire project − $244 million
Grant 60%, State 40% share
Costs in grant application
I-35/535/53 Interchange − $177 million
Garfield Bridges − $19.2 million
![Page 16: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/16.jpg)
Preliminary Engineering Survey work
Soil testing
Wetland delineation
Regulated waste assessments
Utilities survey
Noise study
![Page 17: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/17.jpg)
Further information Monthly coffee & conversation
Starting July
Time and place?
Available to meet with groups
Future design charrette TBD
Visual Quality Plan TBD
Other ideas?
![Page 18: fka “Can of Worms”€¦ · To introduce the potential Twin Ports Interchange (TPI) project. Jct I-35/I-535/Hwy 53 fka “Can of Worms” I-535 at Garfield Avenue Gather community](https://reader033.vdocuments.site/reader033/viewer/2022060606/605c2c047cb48161c570bdab/html5/thumbnails/18.jpg)
Comments Review layouts on wall
Note areas of concern
Put comments on Post-it notes
Fill out a comment sheet
Email comments at any time
Attend future meetings