Project Management
Chris ImondiEjvin Berry
FIRSTFare – October 15th, 2011
![Page 3: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/3.jpg)
What is a Project? One goal + some parameters:
Scope Time Cost Quality Risk
![Page 4: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/4.jpg)
Project Success
Requirements to survive the process: Happy customers On time deliverables On budget Optimistic investors Team cohesion
Congratulations… but if you have problems “surviving”, you’ll have problems “thriving” as an engineering organization…
![Page 5: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/5.jpg)
Project Successes Customers who generate new requirements Under budget Innovation Investors are paid Team talent pool intensifies Leftover energy? Diversify:
Create community infrastructure like FLL teams, or academic mentorship
![Page 6: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/6.jpg)
Project Manager Primary Roles:
Build a team (organize existing resources)
Maintain/Analyze data and schedule Schedule resources Organize capital (money + manpower) Manage conflict (interference) Review work – Initiate Design Reviews
![Page 7: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/7.jpg)
Novations Group, Inc., "Tools and Techniques of Project Management, v6.1"
What is Project Management?
![Page 8: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/8.jpg)
Initiation Occurs at the start of the project Contains clear project goals and parameters Often involves the customer Your big chance to control scope
Initiation will take place between 5am and midnight on Kickoff Day.
![Page 9: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/9.jpg)
Planning This is the opportunity to modify:
Team structure Tactics – Define “envelopes” Schedule:
Chronological schedules Cost schedules – when to buy?
Acceptable risks – Weigh your skills and your needs with your “wants”
![Page 10: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/10.jpg)
Early vs. Late Project Planning Unexpected
problems late in development kill projects
Time spent up front to understand the requirements, analyze, and correctly design a solution saves big in the end
![Page 11: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/11.jpg)
Executing Do what you planned. Do only what you planned. Feedback and repeat.
Note: It is important to document activities during the execution phase.
![Page 12: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/12.jpg)
Monitoring and Controlling Gather feedback via Design Review Sort feedback Make decisions regarding remaining
resources Manage schedule changes
![Page 13: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/13.jpg)
Closing A project is closed when a successful
Final Design Review is held between design, management and the customer.
This is a formal process in which you sell your product to the customer.
Which projects need to close? Minor components vs. Entire robots
Who is your customer?
![Page 14: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/14.jpg)
Now it’s time to manage…
If you were looking for someone to spell it out for you; here’s your chance…
![Page 15: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/15.jpg)
First: Team Structure
Match people with their strengths It may be helpful, particularly for rookie
teams, to develop a skills matrix. This will help identify training needs, or
where you need to get more outside help (a trainer, or a hired gun?)
Develop an organization chart, matching team members to their responsibilities.
![Page 16: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/16.jpg)
Second: Plan the work… Work Breakdown Structure (or WBS) =
Everything you want to do on the project Determine the form and function of every
part, and what they all do for you (Functional Efficiency Technique)
Also any related work – fundraising, major events, support equipment
This ultimately becomes your project plan, as detailed as you choose to plan and schedule it.
Match with your team structure.
![Page 17: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/17.jpg)
Plan the work (cont.). . . Estimate each item or system using a
Resource Loading Diagram along with a Network Diagram: How much time (work hours) do you think
it will take? How many people do you have? How
much time do they have? How many days/ hours will each item
take? Where are you short handed? Make sure
you aren’t double booking people.
![Page 18: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/18.jpg)
Develop a Project Schedule
Make a simple project schedule, easy to read and status.
Stick to your plan Monitor progress – fill in the bars, but not if they are
not done. Adjust on the fly – you may have to give up some
goals, or shift more people to key tasks that are falling behind. Enlist more experts?
Keep everyone productive, but don’t forget this is all fun!
Communicate!
![Page 19: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/19.jpg)
Third: Execute - do some work
![Page 20: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/20.jpg)
Fourth: Design Reviews Plan and schedule design reviews
Every day, if required, until design completion Document (as specifically as possible) how
subsystems will work together and connect as they are designed, built and integrated
Check your interfaces in the reviews – if there is change, it must be fully investigated, understood and agreed to
![Page 21: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/21.jpg)
Fifth: Risk Management
Also known as “what-ifs” Leave a little time for disasters and
unforeseen details Testing is essential to reduce risk Set goals for features or functions that
would be “nice to have” If there is insufficient time, the project will
still be successful without them
![Page 22: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/22.jpg)
Risk Management (cont.)
FMEA (Failure Modes and Effects Analysis) Consider system components Identify symptoms of failure Identify root cause Predict consequences to other sub-
systems Rank failure modes by severity (1,2,3) Rank failure modes by probability (1,2,3)
Example FMEA.
![Page 23: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/23.jpg)
References
MBA.com PMI PMBOK Guide
Contact: Chris Imondi, [email protected] Ejvin Berry, [email protected]
![Page 24: First fare 2011 project-management](https://reader033.vdocuments.site/reader033/viewer/2022061209/548ca651b4795962278b45ae/html5/thumbnails/24.jpg)
Questions ????