Truck 81
Firefighter Operations
DC EHAS 2008
Firefighter sets wheel chocks. Front chock requires a small space from the wheel for set up.
Setting Outriggers – Engineer deploys outriggers, firefighter sets ground pads, handle in.
Firefighter inserts pin
To start generator from cab, start PTO first, then start generator.
PTOStart
GeneratorStart
To start generator at pump panel, start PTO in cab and then start generator at panel
GeneratorStart
4500 psi basket air supply
Fill compartment next to bottle on Officer side
Fill Connection
Regulator
SCBA FILL STATION
Regulator, should be pre‐set
Insert 4500 psi SCBA
Fill from lowest pressure to highest pressure.
Connector for filling cascade from our cascade fill at station one
Attaching the roof ladder to the basket
Attach the two stokes carriers,
remove the ladder rung holder
Take the roof ladder off the main and slide it into place on the stokes carriers
Closer view
Once in place, insert the ladder rung holder
Set the proper climbing angle
Applying Stokes, Two Stokes Carriers on basket
Applying the stokes. Place stokes on top of Stokes Carriers
Apply two orange straps
Basket Control Panel
Ladder Controls
Raise ‐Lower
Left ‐ Right
Extend ‐retract
Electric Master Stream Controls
Command Zone shows gpm, ladder height, angle and rung align. Also show available air in 4500 supply cylinder
A set of irons, a pick head ax, 2 spanner wrenches, and a n electrical outlet are located on the officers side of the basket.
Engineers side box holds 2 masks, 2 regulators with 8’ of hose.
Next to the box is the on ‐ off valve for the cleanup line
Officers side box holds 3 class 1 belts, 2 class 2 harnesses, 10’ clean up line
Engineer Control Box at pedestal
Command Zone shows gpm, ladder height, angle and rung align. Also show available air in 4500 supply cylinder
Electronic Master Stream . 2 ½” Discharge