Download - FHS Facility Presentation - Shive-Hattery
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Fairfield Community School District
High School Master Plan& HVAC Upgrade Plans
March 15, 2010
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
High School Master Plan
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Shive-Hattery would like to thank the efforts of the School Board, the recent
Planning and Design Advisory Committee, and preceding committees
of similar missions.
The information and input provided by these Citizens, Educators, Students, and Board Members have
shaped what is being proposed for the High School facility.
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
What determined the proposed work for the Fairfield High School?
Several committees over the years have been charged with looking into the built environment of the high school and what issues and impacts the existing building has upon the school systems mission of providing a valuable educational program to its students and by extension the community as a whole. The most recent of these committees was the FSCD Planning and Design Advisory Group co-chaired by Jennifer Anderson and Troy Seeley.
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
What are some of the issues and concerns relating to the existing high school structure…
Learning spaces – are they effective, flexible, and conducive to the educational programSecurity and Safety for students and employeesVentilation, and interior environmental comfortElectrical and mechanical capacityStudent services, including nurses officeADA, and related accessibility issuesPlumbingEnergy usageGreen initiatives
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Through the Planning and Design Advisory Group several options were explored…
Status Quo – with occasional repair, and remodeling and repurposing of existing facilities
Addition and Remodeling – All at once and retaining the core building
Phased construction – retaining portions of the existing building and new construction over time
New Construction on a new site
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
The results of the Planning and Design Advisory Group and what it recommended to the School Board…
Pros and Cons of Each option as determined by the advisory committee
What the committee decided
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
More specific tailoring of the proposed building was then applied under the direction of the school board to better reflect the educational program resulting in the building presented to you now…
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community SchoolsHigh School Planning Option C (PH I)
Site PlanNo Scale
N
Property Line
Property Line
Pro
per
ty L
ine
Pro
per
ty L
ine
Railroad Right-of-Way
Res
iden
tial
Trojan StadiumConcourse
ExistingGymnasium
StudentParking
Faculty & StaffParking
Visitor Parking
Pro
per
ty L
ine
Briggs
ExistingAuditorium
Residential
Res
iden
tial
Hempstead
MainEntry
GymEntry
StadiumEntry
ServiceEntry
Residential
Visitor ParkingPACEntry
Bus Queue
ExistingCafeteria
Court
Entry
Practice Fields
Broadway
Legend
New Construction PH I
Existing Remodel PH I
Existing to Remain
Circulation
Roof Area
New Service Corridor
New Student & Visitor Parking
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community SchoolsHigh School Planning Option C (PH I)
Basement Floor PlanNo Scale
N
Ensemble
New Unexcavated
New Unexcavated
New
Un
exca
vate
d
New
Un
exca
vate
dN
ew U
nex
cava
ted
New Unexcavated
New Unexcavated
UnexcavatedUnexcavated
Unexcavated
Unexcavated
Unexcavated
Unexcavated
Unexcavated Unexcavated
Unexcavated
Unexcavated
Stor
Boy’s Lockers
Boy’s Lockers
Legend
New Construction PH I
Existing Remodel PH I
Existing to Remain
Circulation
Roof Area
Locker Rooms
Remodel
Improved Access to
Basement and Service Tunnels
Minor Remodel of Vocal Room to
General Purpose Ensemble Space /
Practice
Minor Remodel to Create Additional
Storage Space
Theatrical Storage Removed From Below
Auditorium for Fire Safety – Relocated to
Ground Floor
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community SchoolsHigh School Planning Option C (PH I)
Ground Floor PlanNo Scale
N
Receiving /Storage
Ofc
Elec
Mech
Cost
PropSt
AdministrationStudent Services
Clinic
DistanceLearning
Servery
Cafeteria
Grounds /Keeper
Wrestling
Shop
ElecLab
Girl’s PE
PE Gym Office
Gymnasium
BusinessComputer
Applications
BusinessLab
Acct /Law
FCS Clothing FCS Food /Nutrition
FitnessCenter
FitnessOffice
FitnessSt
SchlStore
WM Coach
Ofc
Health
Vocal
Auditorium
Mt Ft
Vivarium Prep St
Biology
Biology
AutoShop
AutoShop
Ag / HortAg / Hort
Prep
DrySt
PACEntry
GymEntry
StadiumEntry
ServiceEntry
Entry
Ft Mt
MainEntry
MathClrm
MathClrm
MathClrm
MathClrm
SN Clrm1 SN Clrm
2
SN Clrm3 Self-
Contained
SSClrm
SSClrm
SSClrm
Sgr Elec
PE / AthleticsStorage
Sgr Elec
Finish
Legend
New Construction PH I
Existing Remodel PH I
Existing to Remain
Circulation
Roof Area
New Math Suite Improved Receiving &
Storage Kitchen & Servery Updated to Student
Load
New Biological
Science Suite
New Social Studies
Suite
Student Services &
Administration Suite
Improved Visitor Access Control & ADA Compliance
Former Business Area Repurposed for
Fitness Suite
Media Center Repurposed for New Business Suite
Wrestling Room Relocated to Physical
Education Wing
Vocal Relocated Behind Auditorium
Auditorium HVAC Update & ADA Improvements
Locker Room Remodel
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community SchoolsHigh School Planning Option C (PH I)
First Floor PlanNo Scale
N
MediaCenter
ComputerLab
Open to Gymnasium
Band
Auditorium Open to Below
Ft
MtFt
Mt
Art 2DArt 3D
GraphicsLab
ELL /ESLMech
Prac
Prac
Science
Science
Science
Prep St
Faculty Resource
Faculty Lounge
Kitch Driver’sEd
PE / Athletic St.
LAClrm
LAClrm
LAClrm
LAClrm
LAClrm
SN 6Clrm
SN 5Clrm
WLClrm
WLClrm
WLClrm
SN 4Clrm
WrkRm
Ofc
MP
St
Av
ComputerLabConf
BalconyCADD
Legend
New Construction PH I
Existing Remodel PH I
Existing to Remain
Circulation
Roof Area
New Language Arts Suite
New Sciences Suite
New Language Arts Suite
New Media Center & Technology Suite
Auditorium HVAC, ADA Updates &
Expansion
Faculty Resource Center
Graphical Arts Suite Minimal Remodel
Remodeled Band Suite
Conf
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community SchoolsHigh School Planning Option C (PH I)
Second Floor PlanNo Scale
N
Designated Alternative Use or Unoccupied
Open to Below
Legend
New Construction PH I
Existing Remodel PH I
Existing to Remain
Circulation
Roof Area
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Mass Model ViewsExisting Building
View from Southwest Corner
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Mass Model ViewsExisting Building
View from Northwest Corner
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Mass Model ViewsNew Construction
View from Southwest Corner
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Mass Model ViewsNew Construction
View from Northwest Corner
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Mass Model ViewsNew Construction
View from North
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Mass Model ViewsSite Plan New Construction
Birdseye View from South
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Fairfield Community School District HVAC Upgrade Plans
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
A Report of theElementary & Middle Schools
HVAC Retrofit Analysis
HVAC Systems Analysis
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Purpose – To analyze the mechanical systems for the following:
• Fairfield Middle School
• Libertyville Elementary
• Pence Elementary
• Washington Elementary
Goal: Heat and Cool the buildings while improving energy efficiency
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Overview of existing systems:
• Unit ventilators (classroom)
• Convectors
• Boilers
• Fire protection (sprinklers) are basically non-existent
• Electrical system is 1/3 capacity for cooling
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Other Considerations:
• Comfort
• Indoor air quality (IAQ)
• Equipment life
• Maintenance
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Typical age of systems:
• Fans – 25 years
• Boilers – 30 years
• Temperature controls – 25 years
• Unit ventilators – 20 years
• Electrical panels – 30 years
• Air conditioning systems – 10 to 25 years
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
• Geothermal systems (closed loop heat pump system)
• Energy efficiency
• Least invasive
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
System Costs:
• Heat Pump $12,009,200 (typical for office systems)
• VAV $12,379,100 (typical for schools, offices & hospitals)
• Geothermal $12,455,400 (schools)
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Energy Analysis (Washington Elementary):
First Cost Incremental Cost Energy Savings Simple Payback
Heat Pump $1,832,900 N/A N/A N/A
VAV $1,891,000 $58,100 ($1,086/year) N/A
Geothermal $1,905,100 $72,200 $4,605/year 13.3 years
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
INHERENT BENEFITS
•Air Conditioning•Geothermal Fits•Reduces Carbon Footprint•Reduces Energy Costs•Improved Indoor Environment•Lighting Upgrade•Fire Protection System•Life Safety Upgrade•Security System Upgrade•Improved Data / Communication Capacity
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
STUDENT BENEFITS
•Improved Attendance•Improved Test Scores•Reliable and Safe Environment
ringing Education and Architecture Together - Shive-Hattery Education Practice Team
C R E A T I N G L E A R N I N G E N V I R O N M E N T S
B
Fairfield Community Schools
Thank You For Your Time.
Please Let Us Answer Your Questions!