Fairfax County, Noman M. Cole, Jr., Pollution Control Plant Water Reuse Project

County of Fairfax, Virginia Department of Public Works and Environmental Services

DESIGN BUILD CONSTRUCTION OF $15.2M

WATER REUSE PROJECT Presented by: Jeff Chapin PE

May 9, 2013 Mid Atlantic Chapter APWA

Annual Conference, Virginia Beach, VA

Page 2: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

LOCATION NCPCP

NCPCP

Page 3: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

NCPCP 67 MGD FACILITY

Page 4: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

DESIGN BUILD TEAM

OWNER: FAIRFAX COUNTY DEPT. OF PUBLIC WORKS AND ENVIRONMENTAL SERVICES

BRIDGING ENGINEER: AECOM/GREELEY & HANSEN

DESIGN BUILDER: M.A. BONGIOVANNI, INC.

DESIGN ENGINEER: DEWBERRY

I&C, SCADA, PROGRAMMING: CH2M HILL

Page 5: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

DESIGN BUILD TEAM

OWNER: FAIRFAX COUNTY DEPT. OF PUBLIC WORKS AND ENVIRONMENTAL SERVICES

BRIDGING ENGINEER: AECOM/GREELEY & HANSEN

DESIGN BUILDER: M.A. BONGIOVANNI, INC.

DESIGN ENGINEER: DEWBERRY

I&C, SCADA, PROGRAMMING: CH2M HILL

RECLAIMED WATER MANAGEMENT PLAN &

O&M MANUAL: CDM SMITH

Page 6: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

WATER REUSE PROJECT

Page 7: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

REUSE WATER PROJECT BENEFITS

• Reduce Nutrients Discharged

to the Chesapeake Bay

• Preserve 1.5 MGD Drinking Water

• Improve Drought Resistance

• Offset Treatment Costs

NCPCP Outfall

Page 8: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

REUSE PROJECT COMPONENTS

• 16,000-feet of 20” and 36” Pipe from NCPCP to the Covanta Energy Resource Recovery Facility

• 7,000 feet of 12” Pipe to Laurel Hill GC

• Two 450-horsepower Pumps at NCPCP

• A 500,000-gallon Elevated Storage Tank

• Lower Potomac Park Ball Field Irrigation System

• Instrumentation and Controls

Page 9: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

REUSE PROJECT COMPONENTS

• 16,000 ft. 20” & 36” Pipe from NCPCP to Covanta Energy Resource Recovery Facility

• 7,000 ft. of 12” Pipe to Laurel Hill GC

• Two 450-horsepower Pumps at NCPCP

• A 500,000-gallon Elevated Storage Tank

• Lower Potomac Park Ball Field Irrigation System

• Instrumentation and Controls

Page 10: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

REQUIRED 52 SEPARATE PERMITS

• Virginia Dept. of Environmental Quality • Virginia Dept. of Transportation • Fairfax County 2232 Approval and Site Plan • VMRC/ACOE Joint Permits • FAA Tank Approval • Building Permits • CSX Railroad Permit • Virginia Stormwater Management Plan

10

I-95

Page 11: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

STIMULUS FUNDING

• $ 6.5-Million Funding from American Recovery and Reinvestment Act (ARRA)

• Funds Dispersed to County Through VA Dept. of Environmental Quality

• Construction Start 2 Months from NTP

• Design Build Only Way to Meet

Construction Start Date

Page 12: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

CONSTRUCTION BEFORE DESIGN DONE

County Provided 30% Design Drawings

1st Submittal was QA/QC Plan

Submit 75% Design Drawings and Specs

Submit 100% Design Drawings and Specs

Shop Drawings Submitted During Design

Page 13: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

DESIGN/BUILD APPROACH

13

Page 14: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

STAKEHOLDERS

Key Stakeholders: • Citizens (Public Meetings)

• County Park Authority

• County Dept. Public Works and Env. Services

• Covanta Energy Resource Recovery Facility

• County Department of Transportation

• County Solid Waste Program

• Virginia Dept. of Transportation and DEQ

Page 15: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

1,000 GPM TO COVANTA FACILITY 15

Covanta Cooling Towers

Page 16: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

AVERAGE DAILY DESIGN FLOWS

REUSE AVERAGE DAILY DESIGN FLOWS

COVANTA = 1,080 GPM

LAUREL HILL GOLF COURSE = 833 GPM

LOWER POTOMAC BALL FIELDS = 231 GPM

TOTAL = 2144 GPM

MAXIMUM DESIGN FLOW= 3816 GPM

Page 17: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

VA DEQ PERMIT MONITORING

Page 18: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

NCPCP REUSE PUMP STATION

Page 19: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

REUSE PUMPS IN HH1

• PURPOSE: MAINTAIN WATER LEVEL IN COVANTA ELEVATED TANK

• TWO NEW 450 HP VERTICAL TURBINE PUMPS

• EACH PUMP RATED AT 4,600 GPM @ 297 FT

• ONE PUMP IS A STANDBY UNIT

Page 20: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

VFDS, FLOW METER, ANALYZERS

Page 21: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

REUSE WATER DOUBLE CHLORINATION

Chlorine Tanks Metering Pumps

Page 22: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

36 INCH CHLORINE CONTACT PIPE

Page 23: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

TOTAL CHLORINE RESIDUAL (TRC)

CONTACT TIME FLOW

20 MINUTES, MIN @ 4,600 GPM MAXIMUM

30 MINUTES, AVG @ 3,000 GPM NORMAL

PERMIT LIMIT ON TRC= 0.5 MG/L

MAX. TRC FOR IRRIGATION = 5 MG/L

SHUT OFF PUMPING IF TRC LESS THAN 1 MG/L

OR MORE THAN 4.2 MG/L

Page 24: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

REUSE WATER BULKFILL STATION

Page 25: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

POHICK CREEK 20” PIPE CROSSING

• Pohick Creek Crossing

• VMRC/ACOE permitting

25

Page 26: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

I-95 CROSSING

Page 27: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

LORTON ROAD CSX BRIDGE 27

Page 28: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

CSX RAILROAD BRIDGE

Page 29: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

GILES RUN 20” PIPE CROSSING 29

Page 30: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

COVANTA FACILITY

• Maintain:

– Continuous Water Flow to Cooling Towers

– Wastewater Pumping at All Times

– Truck Access to the Site

– Safe Working Conditions

– Communication with Facility Management

30

Wastewater Pump Station Covanta

Page 31: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

DISCHARGE TO COOLING TOWER BASIN

Page 32: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

COVANTA 0.5 MG ELEVATED WATER TANK

32

Page 33: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

COVANTA WASTEWATER PUMP STATION

Page 34: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

LAUREL HILL GOLF COURSE

Page 35: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

LAUREL HILL BOOSTER PUMP STATION

60 HP Booster Pump Existing Pond Irrigation Pump Station

Page 36: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

BALL FIELD IRRIGATION SYSTEM

Booster Pump Pump Station

Page 37: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

OPERATION AND MAINTENANCE

SYSTEM O&M BY

• NCPCP Operations Staff

• Fairfax County Wastewater Collection Division

• Covanta Energy Resource Recovery Facility

• Fairfax County Park Authority

• Local Little League Lower Potomac Ball fields

Page 38: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

WATER REUSE PROJECT COSTS

• Design Build Bid Price $15,200,000

• Change Orders Total $303,853 (2.0%)

• Total Design Build Cost $15,503,853

Page 39: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

CHLORINE RESIDUAL STARTUP PROBLEMS

• ANALYZER CALIBRATION

• LOW & HIGH PLANT EFFLUENT RESIDUAL

• CHLORINE SPIKES AND DECAY

• CHLORINE DECAY WHEN PUMP OF

• METERING PUMPS & CHLORINE STRENGTH

Page 40: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

CHLORINE RESIDUAL STARTUP PROBLEMS

• ANALYZER CALIBRATION

• LOW & HIGH PLANT EFFLUENT RESIDUAL

• CL SPIKES AND DECAY

• METERING PUMPS & CHLORINE STRENGTH

• CL PIPING LEAKS

Page 41: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

INSTRUMENTATION SCREEN

Page 42: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

FUTURE POSSIBLE REUSE CUSTOMERS

• FORT BELVOIR

• POHICK BAY GOLF COURSE

• NEWINGTON CONCRETE

• CARDINAL CONCRETE

Page 43: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

Fairfax County, Noman M. Cole, Jr., Pollution Control Plant Water Reuse Project

Equalization Facilities Expansion / Water Reuse Project

QUESTIONS

County of Fairfax, Virginia Department of Public Works and Environmental Services

Page 44: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

EX. LAUREL HILL IRRIGATION PUMPS

Page 45: Fairfax County, Noman M. Cole, Jr., Pollution Control ...midatlantic.apwa.net/Content/Chapters/midatlantic... · DESIGN/BUILD APPROACH 13 . STAKEHOLDERS Key Stakeholders: •Citizens

COVANTA BLOWDOWN