Download - F-Liquid Penetran Exam Report Ke2 - Copy
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
1/24
Client :
Project Title :
Name of Equipment : 10" REG -24-1P1
and Identification No. : 10" (BRANCH)
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Penetrant
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
2/24
Client :
Project Title : Zr.5800 HYL III
Name of Equipment : 8"- ECW/PCW
and Identification No. : 8" (BRANCH) :
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
3/24
Client :
Project Title :
Name of Equipment 8" ECW
and Identification No. : 8" ( BRANCH )
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
Removal
24" REG-24"-1P1
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
4/24
Client :
Project Title :
Name of Equipment : 24" NG 8010 NEW PIPEand Identification No. : 24" BRANCH
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
Removal
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
5/24
Client :
Project Title :
Name of Equipment 24" MPS
and Identification No. : 24" JOINT TAPON
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Removal
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying Penetrants
Dry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
6/24
Client :
Project Title :
Name of Equipment : 24" MPS
and Identification No. : 24" JOINT TAPON
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Penetrant
Penetrant Time Minutes
Removal
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
7/24
Client :
Project Title : Zerro Rofermer 5800
Name of Equipment : 24" MPS
and Identification No. : 24" JOINT TAPON
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
Removal
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
8/24
Client :
Project Title :
Name of Equipment 16" PCW 8009 W02
and Identification No. : 16" (branch)
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
Porosity
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
9/24
Client :
Project Title :
Name of Equipment 16" PCW 8009 W02
and Identification No. : 16" (branch)
Applicable code Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
Acc
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
Removal
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
10/24
Client :
Project Title :
Name of Equipment 6" NG-8010-1P4 LINE NEW PIPE
and Identification No. : 6" (branch) 4joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
11/24
Client :
Project Title :
Name of Equipment 6" NG-8010/ COW 041-1P4 LINE NEW PIPE
and Identification No. : 6" (branch) : 14 JOINT
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
POROSITY
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
12/24
Client :
Project Title :
Name of Equipment 2" NG 8037-1P2
and Identification No. : 6" & 2" (branch) 1 joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
13/24
Client :
Project Title :
Name of Equipment 6" Netrogen
and Identification No. : 6" & 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
POROSITY
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
14/24
Client :
Project Title :
Name of Equipment 3" IG -SA -SA- ECW
and Identification No. : 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
15/24
Client :
Project Title :
Name of Equipment 8" PCW/ECW
and Identification No. : 8" & 3" (branch) 4 joint
Applicable code Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
16/24
Client :
Project Title :
Name of Equipment 8" COW-041 1S1
and Identification No. : 8" (branch) 6 joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
17/24
Client :
Project Title :
Name of Equipment 8" ECW
and Identification No. : 8"(branch) 6 joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
18/24
Client :
Project Title :
Name of Equipment 6" PCW
and Identification No. : 6" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
19/24
Client :
Project Title :
Name of Equipment 6" Netrogen launch Transferline
and Identification No. : 6" & 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
Temperature
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
20/24
Client :
Project Title :
Name of Equipment 16" PCW- 8009 and 8010 -W02
and Identification No. : 16" (branch) 4 joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
21/24
Client :
Project Title :
Name of Equipment 24"- MPS,24" 1P1
and Identification No. : 24" (BLIND ) 14 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
22/24
Client :
Project Title :
Name of Equipment 16" PCW-8009-W02
and Identification No. : 16" (branch) 2joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
Penetrant
Penetrant Time Minutes
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
23/24
Client :
Project Title :
Name of Equipment 6" Netrogen launch Transferline
and Identification No. : 6" & 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, CHECKED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy
24/24
Project Title Project No.:
Client Report No.:
Name of Equipment Date :
1 60" REG-24-IPI ACC 60 8 480
2 36" REG-02-1P1 36 15 540
3 24" MPS-24" REG-69-1P1 24 25 600
4 20" REG- 11-1P1 28" OG 20 20 400
5 6" NG8010-1P4 NEW LINE PIPE 6 14 84
6 16" PCW-8009 W02 16 15 240
7 12" ECW-8031 12 15 180
8 10" ECW-8032-W01 10" -PCW 10 25 250
9 6" COW-041-1S1 6" SW99-W01 6 25 150
10 2" IG 8037-IP2 2 35 70
11 3" IG,3-SA ECW 3 15 45
12 2" MPS-41-1S1-2"DM8007-W01 2 20 40
13 11/2"-1A 6" SW-99 W01 1.5 25 37.5
14 72" JOINT BRANCH DUMMY 72 2 144
15 8" JOINT BRANCH TRANSFERLINE 8 12 96
16 3" NETROGEN LAND 3 20 60
17 8" PCW/ECW 8 15 120
306 3536.5
note :
1 WAKTU time price Total
a Waktu normal 24 hour
b Over time 36 hour
60 hour
2 MAN FOWER
a Level 2 4 60 25,000.0Rp 6,000,000.0Rp
b Level 1 4 60 20,000.0Rp 4,800,000.0Rp
c Helper 5 60 10,000.0Rp 3,000,000.0Rp
3 MATERIAL
a Liquit Penetrant 20 Cans 150,000.0Rp 3,000,000.0Rp
b Liquit Depelover 25 Cans 150,000.0Rp 3,750,000.0Rp
c Liquit Cleaner 60 Cans 150,000.0Rp 9,000,000.0Rp
d Wire brush 15 ls 50,000.0Rp 750,000.0Rp
e Majun 10 kg 10,000.0Rp 100,000.0Rp
30,400,000.0Rp
PREPARED BY, INSTRUCTED BY,
PT. KRAKATAU ENGINEERING
LIQUID PENETRANT EXAMINATION REPORT
ACCEPTEDDEFECTNO LINE NOMERQTY
JOINT
DIA
INCH
WELDED
BRANCH
QTY DIA
INCH