Expro Exce l lence Burner Boom Systemsexprogroup.com

Objectives/background

• Expro have a proven track record ofworking with Saipem and haveestablished a strong working relationship

• Saipem contacted Expro to refurbishexisting burner booms, following acontract extension from Saudi Aramco forthe Perro Negro 7 rig, which crucially hada critical deadline

Expro Excellence

• Expro’s team adapted their usual processfor refurbishing burner booms to meetSaipem’s requirements

• Burner booms in need of refurbishmentare normally shipped, then received byExpro’s fabrication shop in Dubai for thenecessary work to be undertaken

• Expro responded to Saipem’s challengeby offering to refurbish the booms in theArsy Shipyard, Bahrain, which allowedthe process to be completed in a shortertimeframe

• By relocating to Arsy, Expro overcamethe challenge of establishing links withnew supply companies, incorporatingthem into the SAP system and havingthem audited in a very short period oftime; Expro also had to arrangepersonnel to relocate to Arsy Shipyard forthe duration of the refurbishment in orderto supervise the work, ensuring thequality of the work met Expro’s rigorousstandards

Value to client

• Expro’s flexible approach providedSaipem with a solution that would meettight deadlines, saving time and money –avoiding approximately $100,000 per dayof rig time costs if Saipem had not metthe deadline

• Existing relationships with Expro ensuredconsistency of the product for Saipem, aswell as the reassurance of robuststandards of quality from Expro

Expro’s burner booms reflect innovated technology for durability and reliability. We offervertical and horizontal racking capabilities, along with advanced operational criteria.Modular design scalable boom sections are available in 60ft up to 120ft. The SeaEmerald Burner is highly efficient, environmentally friendly; third-party rated at 99.993%efficient. A typical boom package consists of the boom, mast, burner platform, andrigging. We also offer hull integration engineering to meet hull classification authorities.

/ Expro Excellence

Expro’s flexible approach enables Saipemto deliver time-critical project, avoidingcosts of up to $100,000 per day, whilstmaintaining the highest standards ofquality and consistency

Burner Boom Systems

Our competitorscannot refurbishExpro’s burnerbooms, howeverthey are in theposition to sellbrand new ones.Expro’scommitment tocustomer service,quality and flexibleapproach enabledSaipem to meettight deadlineswithoutcompromise. ’’

Contact

For further information, please contact:[email protected]

www.exprogroup.com/burnerboomsystems

Equipment Sales_Saipem Case Study_A4 25/03/2019 09:01 Page 1