#neorsdECT
Euclid Creek Tunnel
Community Update
November 13, 2012
#neorsdECT
Meet the Communications Team
• Jim BunseyDeputy Director, Engineering and Construction
• Doug GabrielProgram Manager, Euclid Creek Tunnel
• Bob AuberConstruction Manager
• Ryan SullivanSenior Construction Supervisor
• Jenn EltingPublic Information Specialist
#neorsdECT
Existing Communications
• Contractor Communications– Hard-copy letters
– McNally/Kiewit
• Euclid Creek Newsletter– Quarterly
• Construction Hotline– (216) 432-7157
– Multiple Sewer District projects
• E-mails from Doug Gabriel
#neorsdECT
New Communications
• Euclid Creek Blog (euclidcreek.blogspot.com)– Construction updates (Ryan)
& articles of interest (Jenn)
• E-mail Newsletter– Twice-monthly (Jenn)
• Collinwood Observer– More Sewer District articles &
Euclid Creek Tunnel updates
• Regular Meetings– Third Tuesday of each month
#neorsdECT
Shaft #1Construction Staging Site
• “Mackenzie” launched late July 2012
– 1500 feet tunneled and lined
#neorsdECT
Remote Shaft Sites
• Shaft 2 @ Easterly
– Excavating shaft, presently down 60’
• Shaft 3 @ Beulah Park
– Mobilizing for shaft construction
• Shaft 4 @ Triangle Park
– Forming/pouring concrete in shaft
• Shaft 5 @ E. 185th & St. Clair
– Excavating shaft, presently down 175’
#neorsdECT
Construction Updates
• East 156th Street utility relocation
– Expected completion: mid-December
• Work along Lakeshore Boulevard
– Commence excavation for structure at East 150th Street
– Set-up traffic control for structure east of Collinwood Rec Center
#neorsdECT
Upcoming Construction Impacts
• Continued lane restrictions along Lakeshore Boulevard
#neorsdECT
How to Reach Us
• Social Mediafacebook.com/yoursewerdistrict@neorsd | @wallywaterdrop
• Customer Service (216) 881-8247
• Emergencies: NEORSD ECT Field Office(216) 268-5469
• Ryan Sullivan, [email protected] Elting, [email protected]
#neorsdECT
Next Meeting
• Tuesday, December 18, 20124:00 p.m.Collinwood Recreation Center
• Save the Date!
– January 15
– February 19
– March 19