Office of Design Page 1 of 2
2016 002 January 1, 2016
REFUSE CHUTES / COMPACTOR STACKS This Standard Notice addresses the Procedure and Criteria to be considered regarding the rehabilitation the Refuse Chutes/Incinerator Stacks.
INTRODUCTION
The following Code references apply to Refuse Chutes/Incinerator Stacks:
• 2014 NYC Building Code Chapters 14, 16, 17, and 21 • 2014 NYCBC RCNY §16-01 (Inspection of Existing Structures During Construction
Operations) • 2014 NYCBC RCNY §24-01 (Refuse Chutes & Refuse Rooms) Section (c), …’any
existing refuse chute that is built of 8” minimum thick brick masonry and extends from the compactor room to at least 6’-0” above the roof may continue to be used as such…’.
• 2014 NYC Mechanical Code, Chapter 8 §801
In the early 1980s when New York City banned the use of incinerators for the burning of waste the New York City Housing Authority started converting all existing incinerator flues in its developments to refuse chutes (aka compactor stacks). These compactor stacks typically extend from the basement to approximately 10 feet or more above the main roof surface. The walls of the compactor stacks are typically made of 8 inch fire brick masonry. A spark arrestor is installed at the top of the stack on concrete coping stones. NYCHA has also abandoned the Ash Settling Chambers (aka Smoke Rooms) located on the roof of the buildings; the stacks are connected to these chambers via two openings. As the name suggests, the purpose of these chambers was to allow larger ash particles left over from the combustion process to settle before the gases were exhausted. At the roof level, the compactor stacks are either freestanding, installed adjacent to bulkheads, inside of bulk heads and protruding through bulkhead roofs, or inside of water tank towers. Historically, these brick compactor stacks have required frequent repairs due to leaks. Typical repairs consist of repointing, the replacement of the top 4 feet of brickwork, as well as the coping stones, and the spark arrestors. Ongoing brick masonry maintenance on its buildings comes at a substantial cost to NYCHA. The elimination of brick masonry from the NYCHA portfolio will reduce future expenses associated with repointing and replacement. This Notice outlines the standard procedures for the repair of roof top structures such as compactor stacks and smoke rooms.
– 2 –
Office of Design Page 2 of 2
DESIGN TO REPAIR APPROACH
OoD has developed a standard approach for all compactor stacks in building envelope repair projects that include a roof replacement. Stacks are to be removed and capped, which will decrease the quantities of future brick repair. This will greatly reduce all LL11 issues as well as long-term water leaking associated with these stacks. Where feasible, all obsolete smoke rooms are to be removed in order to avoid future expenses associated with brick and roofing maintenance and repair. It is proposed to remove the reinforced concrete smoke shelf inside the stack where it is practical as well. Table 1 – NYC BC Requirements for Chimney Repairs & Alterations
Abandoned Incinerator Stack /
Chimney
Incinerator Stack converted to Refuse Chute
Chimney w/ Active Flue
Special Inspection Required
No No Yes
Height Above nearest Roof
May be shortened to 0'-0" above highest roof and capped.
6'-0" per NYCBC RCNY §24-01
Dependent on exhaust temp.
Spark Arrestor N/A Yes No
Sprinkler N/A No if brick thickness
complies with minimum required.
No
Cap N/A Yes No, unless part of flue design
Attached are standard details addressing typical stack configurations throughout the NYCHA portfolio. In general, stacks should be cut above the roofs and capped off; stationary metal louvers backed with a wire mesh (acting as a spark arrestor) are to be provided on multiple sides (as required for ventilation, typically with the net area equal to the existing stack opening). Attachments: Drawing A.011 – Typical Refuse Chute Roofing / Flashing Details Drawing S.011 – Typical Compactor Stack Modification Details - I Drawing S.012 – Typical Compactor Stack Modification Details - II
***End of Standard Notice CPDDESIGN2016002***
A-011
PROVIDE CONTINUOUS STAINLESS STL TERMINATION BAR & SEALANT
TO SEAL OFF THE TOP
WALL IN SEALANT MASTIC
SET NEW THROUGH THE
FASTENERW/WASHER 6" OC.
CORROSIVE RESISTANT
NAIL BASE FLASH w/NEW
X
X
X
X
X
X
X
X
X
1/2" ROXOL OVERLAY BOARD
POLY-ISO INSULATION
6" 8"
EXIST. ROOFING TO REMAIN
A-I
C-III
D-IV
B-I
B-II
C-I
C-II
D-I
D-III
D-II
B-III
B-IV
OVERLAPS OF NEW ROOFING OVER EXIST
SLABCONCRETE EXISTING
FLASHING WITH LEAD WEDGE AND MORTARNEW REGLETED STAINLESS STEEL CAP JOINT TO ALLOW INSTALLATION OF SAW CUT 2 1/4" DEEP INTO THE BRICK
6"
WOOD BLOKING.NEW TREATED
NEW GRAVEL
EXISTING CONCRETE ROOF SLAB
EXISTING BRICK WALL
ROOF SLAB.EXISTING BULKHEAD
24" T
YP
SUMPPREMANUFACTURED
7" 10"7"
LEADER
SPLASH BLOCKNEW CONCRETE
12"
1'-6"
4"
12"
1
ROOFING & FASCIAREMOVE AND REPLACE
6" MIN
PERMANENT VAPOR BARRIERAFTER ABATEMENT AND RETAIN ASTORCH DOWN SBS WATERPROOFING
PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN ASSET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION
ROOFING ADHESIVEPOLYISO COMPATIBLE TO INSULATION w/DENSE DECK ADHERED 1/2" ROXOL OR PRIMED
LOW HEIGHT FLASHINGPLY LIQUID APPLIED PROVIDE NEW SINGLE
FLASHING CEMENT IN COLD APPLIED 2 PARTS RESET SCRAPED BACK GRAVELAFTER ROOFING IS INSTALLED
ROOF SLAB.BULKHEAD EXISTING
PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN AS
SET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION
ROOFING ADHESIVEPOLYISO COMPATIBLE
TO INSULATION w/DENSE DECK ADHERED 1/2" ROXOL OR PRIMED
ROOFING ADHESIVEPOLYISO COMPATIBLE
TO INSULATION w/DENSE DECK ADHERED 1/2" ROXOL OR PRIMED
CEMENTROOFING
LOW HEIGHT FLASHINGPLY LIQUID APPLIED PROVIDE NEW SINGLE
PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN ASSET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION
PERMANENT VAPOR BARRIERAFTER ABATEMENT AND RETAIN ASTORCH DOWN SBS WATERPROOFING
8"
4" (MIN.)
6" (MIN.)
6" (MIN.)
8"
GRANULATED SBS TORCH DOWN.8" UP WALL & OVERLAP TOP LAYER
VAPOR BARRIERBOTTOM SBS TORCH DOWN2" UP WALL & 6" OVERLAP
WALL TO REMAINEXISTING BULKHEAD
FLASHING CEMENT IN COLD APPLIED 2 PARTS
RESET SCRAPED BACK GRAVELAFTER ROOFING IS INSTALLED
ROOFING ADHESIVEPOLYISO COMPATIBLE TO INSULATION w/DENSE DECK ADHERED 1/2" ROXOL OR PRIMED
SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW FINAL TOP LAYER OF GRANULATED WHITE TORCH DN
PERMANENT ROOFING INSTALLATIONTO BE RETORCHED TO ACT AS BASE SHEET DURING NEW TOP LAYER OF TORCH DOWN SBS WATERPROOFING
CEMENTWITH 2 PARTS FLASHING NEW CONTINUOUS BEAD
INSTALL NEW ROOFINGTO BE SCRAPED BACK TO EXTENT OF ROOFING GRAVEL
PERMANENT VAPOR BARRIEREXIST ROOFING AND RETAIN ASAFTER ABATEMENT LAPPED 6" ONTO TORCH DOWN SBS WATERPROOFING
PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN ASSET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION
ROOFING REMOVAL DOWN TO SLAB2"-0" MIN ABATEMENT AND/OR
SMOKE ROOMDOWN TO SLAB AROUND AND/OR ROOFING REMOVAL 2"-0" MIN ABATEMENT
EXTENT OF NEW ROOFING
-
2-
3-
6-
4-
4a-
5-
& ROOFENCLOSUREWATER TANK
MAIN ROOF
E.J.
BULKHEAD
BULKHEAD
TYPACM
E.J.
-
6
-
-
2
-
1
- -
(TYP.)
(SIM.)
6
45 ANGLE
NEW ROXOL CANT BUILD UP TO OBTAIN
NEW ROXOL CANT
EXISTING EXPANSION JOINT
ROOFING ADHESIVETO INSULATION w/ POLYISO COMPATIBLE 1/2" ROXOL OR PRIMED DENSE DECK ADHERED
-
-
-2
-2
-5
5
4
CAP FLASHING
ROOFING MEMBRANETORCH DOWN NEW GRANULATED
4a
4a
5
4
4a
ROOF DRAIN, BUT NOT CLOSE TO EXISTING BULKHEAD DOORS.NEARESTTO WATER DIRECT TO ASSEMBLY NEW LOCATE
EXISTS, SUMP/LEADER NO WHERE EXISTING. AS LOCATION SAME IN GO TO ASSEMBLY LEADER WITH SUMP REPLACEMENT
NOTES:
F
OR O
PE
NIN
G R
EQ
UIR
ED
VA
RIE
S - S
EE N
OTES O
N S-0
11
REFER TO STRUCTURAL DRAWINGNET OPENING OF LOUVER3/4" MAXIMUM CLEAR OPENINGGAGE: 14, REFER TO CODEMTL. SCREEN;INTEGRAL GALVANIZEDALUMINUM LOUVER WITH
AT C-III CONDITIONNO ROOFING WORKC-III SIMILAR TO A-I
ROOF SLABAPPROX. 4'-7" ABOVE
SMOKE SHELF TO REMAIN STACK AND CONCRETE EXISTING COMPACTOR
ASBESTOS ABATEMENT NOTES:
NEW SLOT WEEP HOLE(S) @ 24" O.C.
IF RAGGLE BLOCK EXISTS,REPLACE WITH TWO
COURSE OF BRICK
COMPACTOR STACK LOCATIONS
SCHEMATIC ROOF PLAN WITH DIFFERENT
A-
B-
8"8"
8"
ROOM ENTIRELYREMOVE SMOKEIN SOME LOCATIONS& SMOKE SHELFSMOKE ROOM
AT DET. 3 TYP.REFER TO NOTES FLASHING,FOR EXTENT OF NEW
8"
CO
MP
AC
TO
R S
TA
CK
SEE DET. 4 FOR MORE INFORMATIONNEW THROUGH THE WALL FLASHING WITH WEEP HOLEREMOVE 4 COURSES OF BRICK AND PROVIDE
PROVIDE CONTINUOUS STAINLESS STL TERMINATION BAR & SEALANT TO SEAL OFF THE TOP
SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW TOP LAYER OF GRANULATED WHITE TORCH DN
CO
NC. E
DG
E(T
YP.)
EN
TIR
E F
RO
NT O
F
HEIG
HT T
O C
OV
ER
AS DIRECTED BY SAFETY ENGINEERREMOVE AND REPLACE BRICK COURSES IN SMALL SECTIONS HILTI EPOXY ANCHORED PINS WITHIN VERTICAL MORTAR JOINTS@ 16" O.C.PIN THIS COURSE 4" INTO BACK UP MASONRY W/ STAINLESS STEEL PRIOR TO REMOVAL OF 3 BRICK COURSES BELOW,
RECEIVER (EMBEDED) LEG TO CAP 12" O.C.FOR ALL 2 PIECE CAP FLASHING POP RIVET NOTE:
CO
NC. E
DG
E(T
YP.)
HEIG
HT T
O C
OVE
R E
NTIR
E
SEALANT MASTIC
THE WALL IN
SET NEW THROUGH
DET.5 AT SOLID WALL AT CAVITY WALL AND
V.I.F. REFER TO DET. 4EXISTING FLASHING
NEW FLASHING 6" BEYONDDOES NOT EXIST. OVERLAP
WHERE EXISTING FLASHINGPROVIDE NEW FLASHING
8"
VAPOR BARRIERAND RETAIN AS PERMANENT
TORCH DOWN SBS WATERPROOFING
SIMOPP.
TO INSTALL NEW 2 PIECE THROUGH WALL FLASHING w/ WEEP HOLES,
SET NEW THROUGH WALL FLASHING IN TROWELED SILICONE SEALANT(MASTIC)
W/ CONTINUOUS STAINLESS STEEL TERMINATION BAR.
FASTEN TERMINATION BAR MAKING SURE THAT SEALANT IS
FORCED TO THE TOP TO FORM A CONTINUOUS BEAD OF SEALANT
ALONG TOP EDGE OF TERMINATION BAR & CAPTURED FLASHING
BEHIND . ADD ADDITIONAL SEALANT ALONG TOP TO MAKE SURE CONTINUOUS
WATERPROOF BARRIER IS FORMED. PUT BACK THE 3 COURSES OF REMOVED
BRICK & INSTALL SLOT WEEP HOLES 24" OC.
SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW TOP LAYER OF GRANULATED WHITE TORCH DN
AS PART OF PERMANENT ROOFING INSTALLATIONNEW LAYER OF TORCH DN SBS SHEET
PERFORMED AS PER ASBESTOS ABATEMENTFLASHING AND MASTIC PROCEDURES MUST BE THEREFORE REMOVAL OF BRICK AND EXISTING AND MASTIC IS ASBESTOS CONTAMINATED AND ASSUME THAT ALL EXIST THROUGHWALL FLASHING
ROOFING INSTALLATIONSBS SHEET AS PART OF PERMANENT NEW LAYER OF TORCH DN
12" (
TYP.)
8"(T
YP.)
METAL COUNTER FLASHINGHOLES TO PROTECT TOP OF WALL FLASHING WITH WEEP
PROVIDE NEW THROUGH CONC. SMOKE SHELF AND
BRICK ABOVE EXISTING REMOVE 4 COURSES OF
FOR CAVITY WALL,
SEE DET. ABLOCKDOWN SPOUT CONNECTED TO SPLASH STOP, LEADER AND STAINLESS STEELFASCIA SUMP SCUPPER WITH GRAVELNEW STAINLESS STEEL INTERRATED
FOR REMAINING FASCIASUMP-CLEAT IS SIMILAR INTEGRAL FASCIA CLEAT PROFILE OF
WATER TO FLOW EDGE TO PERMIT BREAK IN FASCIA
FASTENER EVERY 2'-0" O.C. (VERTICALLY)WITH STAINLESS STEEL NEW STAINLESS STEEL BRACKETS
SEE DET. BNEW SPLASH BLOCK
NEW SBS WALK-PAD
NEW S.S. GRAVEL STOP. BEYOND SUMP
STAINLESS STEEL FASTENER 12" O.C.
ANCHOR CLEAT
POST REMOVAL / ABATEMENT ROOFING SPLICE DETAIL (CONCRETE DECK)
ISOMETRIC VIEW OF STAIR BULKHEAD & COMPACTOR STACK
FLASHING DETAIL @ COMPACTOR STACK WALL
ROOF FASCIA DETAIL
N.T.S.
SECTION DETAIL @ COMPACTOR STACK, LOUVER & ROOFING MEMBRANE
N.T.S.
FASCIA SUMP DETAIL
PRE-MANUFACTURERED
ISOMETRIC ONE PIECE
N.T.S.
BLOCK DETAIL (TYP.)
ISOMETRIC CONC. SPLASH
N.T.S.
DOWNSPOUT DETAIL @ BULKHEAD ROOF (TYP.)
N.T.S.
N.T.S.
N.T.S.
N.T.S. N.T.S. N.T.S.
FLASHING DETAIL @ BULKHEAD WALLS
NEW SBS WALK-PAD
8" 8"
6"
NEW DOWN SPOUT
NEW EXPANSION JOINT
TWO PART ROOFING CEMENT
NEW STAINLESS STEEL FASCIA COVER
STAINLESS STEEL ANCHOR CLEAT
STAINLESS STEEL FASTENER 12" O.C.
BLOCKING. (AS REQUIRED)NEW TREATED WOOD
EXISTING BRICK WALL
PERMANENT ROOFING INSTALLATIONTO BE RETORCHED TO ACT AS BASE SHEET DURING
NEW LAYER OF TORCH DOWN SBS WATERPROOFING
PERMANENT ROOFING INSTALLATIONTO BE RETORCHED TO ACT AS BASE SHEET DURING
NEW LAYER OF TORCH DOWN SBS WATERPROOFING
SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW TOP LAYER OF GRANULATED WHITE TORCH DN
SBS SHEET AS PART OF PERMANENT ROOFING INSTALLATIONNEW TOP LAYER OF GRANULATED WHITE TORCH DN
PERMANENT ROOFING INSTALLATION WATERPROOFING TO REMAIN AS
SET IN ADHESIVE DURING TEMP NEW TAPERED POLY ISO INSULATION
VAPOR BARRIERAND RETAIN AS PERMANENT
TORCH DOWN SBS WATERPROOFING
LEGEND
*REFER TO DWG. S-011.00 FOR ABBREVIATIONS
ROOFING/FLASHING DETAILSREFUSE CHUTE
PROPOSED TYPICAL
DRAWING) STRUCTURAL CAP (REFER TO PC. CONCRETE NEW CIP OR
BACKER ROD AND SEALANT
09/23/20150
N E V Y O R K C I T YV
HOUSINGAUTHORITY
BROOKLYN / STATEN ISLAND
PROGRAM UNIT:
Designated Space For D
OB Em
ployee Sta
mps & Signatures
DIVISIONCAPITAL PROJECTS
O F F I C E of D E S I G NTEL. 212.306.3000 FAX 212.306.5160
Block No.:
E.D.P. No.:
Development No.:
Zone No.:
Lot No.:
Zoning Map No.:
Drawing Title:
Contract No.:
Drawing No.:
Scale:
Date:
Checked By:
Drawn By:
Seal & Signature:
Contract Title:
VARIOUS
VARIOUS
VARIOUS
00x
BW1432622
Development:
Building Address:
Building No.(s):
Borough of: ORACLE No.:
VARIOUS
VARIOUS
VARIOUS 7681
VARIOUS
Key/Location Plan
New York, New York 1000790 Church Street
Date
BYRev. No. Submissions
Sheet of
.00
VARIOUS
VARIOUS
O. OSTERWIND
JANUARY 15, 2015
3/8" = 1'-0"
S-011
TOP OF BULKHEAD
ROOF
TOP OF BULKHEAD
ROOF
SIM.
SCALE: 3/4" = 1'-0"
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"
ROOF SLABOF BULKHEAD UNDERSIDE
A-I
C-III
D-IV
B-I
B-II
C-I
C-II
D-I
D-III
SCHEMATIC ROOF PLAN WITH DIFFERENT
D-II
I
I
II
1
FLASHING/WATERPROOFINGBRICK WORK REF. DET.
I
II
III WALLSDETACHED FROM OUTSIDE
- PENETRATING MAIN ROOFA
- OUTSIDE OF BULKHEADB
I
II
III
IV
- INSIDE OF BULKHEADC
2
3
4
4
SIM.
1 SIM.
2
1 SIM.
SIM.
2 SIM.
- CUT TO 2'-0" ABOVE MAIN ROOF SLAB
- REBUILD WALLS WITH LOUVERS
BULKHEAD ROOF FORM DECK, SLOPED TO MATCH (E)- CAP WITH (N) CIP CONCRETE CAP, USING
SLAB- CUT TO UNDERSIDE OF BULKHEAD ROOF
BULKHEAD ROOF FORM DECK, SLOPED TO MATCH (E)- CAP WITH (N) CIP CONCRETE CAP, USING
TO MATCH BULKHEAD ROOF- EXTEND ROOFING OVER (N) CAP, SLOPE
- CUT (E) BULKHEAD WALL AS REQUIRED
SIDES4 (FOUR)- INSTALL LOUVERS ON
BRICKWORK STEPSA-I- FOLLOW
SIDES3 (THREE)- INSTALL LOUVERS ON
SIDES(THREE) 3 - REBUILD WALLS WITH LOUVERS ON
LOUVER AT EXTERIOR WALL1 (ONE) - INSTALL
BRICKWORK STEPSC-I- FOLLOW
) SIDES2 (TWO- PROVIDE LOUVERS ON
BRICKWORK STEPSA-I- FOLLOW
BRICKWORK STEPSA-I- FOLLOW
WALLSLOUVERS AT EXTERIOR 2 (TWO) - INSTALL
BRICKWORK STEPSA-I- FOLLOW
BRICKWORK STEPSB-I- FOLLOW
2 SIM.
BRICKWORK STEPSB-I- FOLLOW
B-III
TOP OF BULKHEAD
ROOF
UNDERSIDE OF
SMOKE ROOM ROOF
(N) BRICKWORK
(E) E.J. (E) E.J.
ENCLOSUREWATER TANK
CONCRETE CAP(N) PRECAST OR CIP
CONCRETE CAP(N) PRECAST OR CIP
(N) CIP CONCRETE CAP
BULKHEAD ROOFSLOPE TO MATCH (E)
6" MIN
E.J
SMOKE ROOM
(E) E.J.
III
WITH SMOKE ROOM
5
6
TO REMAINWALLBULKHEAD
INNER WYTHE OF
SMOKE ROOM TOBE DEMOLISHED
B-IV
IV
SIM.
ROOF SLABOF BULKHEAD
UNDERSIDE
CH
UTE IN
CLU
DIN
G S
PA
RK A
RR
EST
OR
RE
MO
VE P
OR
TIO
N O
F (E) R
EF
USE
CH
UTE T
O R
EM
AIN
PO
RTIO
N O
F (E) R
EF
USE
(N) CIP CONCRETE CAP
(TYP)ROOFING S.A.DEXTENT OF (E)
TO BE REBUILTNEW BULKHEAD WALL
(N) BRICKWORKTO BE INSTALLED INTO(4) - (N) LOUVERS BEYOND
(3) - (N) LOUVERS BEYONDTO BE INSTALLED INTO (N) BRICKWORK
-DEMOLISH SMOKE ROOM.
BULKHEAD ROOFTOP OF
AND 3 ON A-011SEE ARCHITECTURE DETAILS 2
S-011 A-011
T.MELNIKOV / M.ELZOGHABY
AND SEALANTJOINT W/BACKER RODREBUILD EXPANSION
S.A.D.(N) ROOFING
MAIN ROOF SLAB LEVEL MAIN ROOF SLAB LEVEL
MAIN ROOF SLAB LEVEL
AS REQUIRED AT SMOKE ROOM.-REMOVE/ABATE (E) TOPPING SLAB
FOR ASBESTOSE.J TESTED POSITIVE
ACM REQUIRED WHEN
COMPACTOR STACK ELEVATION WITH (N) LOUVERS IN (E) BRICKWORK
TABLE 1 - COMPACTOR STACK MODIFICATIONS BY CONDITION
COMPACTOR STACK CONDITION
COMPACTOR STACK ELEVATION WITH (N) BRICKWORK COMPACTOR STACK ELEVATION WITH (N) BRICKWORK(E) COMPACTOR STACK ELEVATION
COMPACTOR STACK STANDS ALONE ON MAIN ROOF
(E) COMPACTOR STACK ELEVATION
COMPACTOR STACK ADJACENT TO BULKHEAD (DETACHED, WITH E.J.)
TO R
EM
AIN
PO
RTIO
N O
F (E) C
OM
PA
CT
OR S
TA
CK
(E) COMPACTOR STACK ELEVATION
COMPACTOR STACK INSIDE OF BULKHEADCOMPACTOR STACK ADJACENT TO BULKHEAD (ATTACHED)
COMPACTOR STACK ELEVATION WITH (E) BRICKWORK (E) COMPACTOR STACK ELEVATION COMPACTOR STACK ELEVATION WITH (E) BRICKWORK(E) COMPACTOR STACK ELEVATION
COMPACTOR STACK ADJACENT TO BULKHEAD (DETACHED, WITH E.J.) COMPACTOR STACK ADJACENT TO BULKHEAD (ATTACHED)
COMPACTOR STACK LOCATIONS
MAIN ROOF SLAB LEVEL MAIN ROOF SLAB LEVEL
(N) LOUVER (TYP)
AS REQUIREDAND RESTORE ROOFINGINSTALL (N) GRAVEL STOP
TO MATCH BULKHEAD ROOF- EXTEND ROOFING OVER (N) CAP, SLOPE
TO B
E R
EM
OVE
DC
ON
C. S
MO
KE S
HELF
FOR ASBESTOS E.J. TESTED POSITIVE
REQUIRED WHENACM ABATEMENT
AFTER STACK REMOVALBRICKWORK EXPOSED
RESTORE AND REPOINT
TO B
ELO
W S
MO
KE S
HELF
ST
AC
K IN
CLU
DIN
G SP
AR
K A
RR
EST
OR
RE
MO
VE P
OR
TIO
N O
F (E) C
OM
PA
CT
OR
REQUIREDPROVIDE SHORING AS
OF BULKHEAD WALL REMOVE OUTER WYTHE
TO B
ELO
W S
MO
KE S
HELF
ST
AC
K IN
CLU
DIN
G SP
AR
K A
RR
EST
OR
RE
MO
VE P
OR
TIO
N O
F (E) C
OM
PA
CT
OR
WITHOUT ROOFINGAND 5 ON A-011SEE ARCHITECTURE DETAILS 2
STRUCTURES.NO ADJACENT ROOF
ON A-011SEE ARCHITECTURE DETAILS 1 & 4a, AND 6
SMOKE ROOM.AND ENCLOSED INSIDEWITH EXPANSION JOINTFLUSH WITH OUTSIDE WALL
2 , AND 3, ON A-011SEE ARCHITECTURAL DETAILS
WITH EXPANSION JOINT.FLUSH WITH OUTSIDE WALL
EXPANSION JOINT.STACK WALLWITHOUTINTEGRAL WITH OUTSIDE
THRU WALL FLASHING.2, 3, 4 AND 4a ON A-011 FORSEE ARCHITECTURE DETAILS
WALL OUTSIDE ONEINTEGRAL WITH
SEE ARCHITECTURE 1,4a, AND 6 ON A-011
WALLS OUTSIDE TWOINTEGRAL WITH
WITH EXPANSION JOINT.OR OUTSIDE ENCLOSUREWALL, DETACHED, INSIDE
ENCLOSURE ONE FLUSH W/
WITH EXPANSION JOINT.WALLS, DETACHED, INSIDE
ENCLOSURE TWO FLUSH W/
JOINT.DETACHED WITH EXPANSIONINSIDE ENCLOSURE,
RO
OM E
NTIR
ELY
RE
MO
VE (E) S
MO
KE
MODIFICATION DETAILS-ICOMPACTOR STACK PROPOSED TYPICAL
TESTED POSITIVE FOR ACMWHERE ROOFING COMPONENTSACM ABATEMENT REQUIRED
ST
AC
K IN
CLU
DIN
G S
PA
RK A
RR
EST
OR
RE
MO
VE P
OR
TIO
N O
F (E) C
OM
PA
CT
OR
ROOF SLAB. WALL 1'-6" TO UNDERSIDE OF BULKHEAD SIDES OF COMPACTOR STACK. CUT BULKHEAD BULKHEAD ROOF SLAB ON 3 EXTERIOR - CUT +/- 1'-6" BELOW THE UNDERSIDE OF
ENCLOSURE.INSIDE WATER TOWER
- ADJACENT TO AND D
TESTING RESULTS FNYCHA TO PROVIDE ACMBE DEMOLISHED/ABATED(E) TOPPING SLAB TO
TESTED POSITIVE FOR ACMWHERE ROOFING COMPONENTSACM ABATEMENT REQUIRED
SMOKE ROOM.JOINT AND ENCLOSED WALL WITHOUT EXPANSIONINTEGRAL WITH OUTSIDE
PENETRATING ROOF.INSIDE ENCLOSURE,
SEE ARCHITECTURE 1,4a, AND 6 ON A-011
SCALE: 3/4" = 1'-0"
1 2
3 4
5 6
S-012
1
S-012
2
SCALE: 3/4" = 1'-0" WITH SMOKE ROOM SCALE: 3/4" = 1'-0"
(N) BRICKWORK
FASCIA COVER S.A.D.(N) ROOFING AND
S-012
BS-012
3
SIM.S-012
4
S-012
B
WITH (E) OPENING BELOWSTACK TO REMAIN TOGETHERPORTION OF (E) COMPACTOR
VERIFY IN FIELD TYPE OF BULKHEAD WALL CONSTRUCTION.NOTE: (E) BULKHEAD WALL IS SHOWN AS CAVITY WALL.
UNDERSIDE OF
SMOKE ROOM ROOF
TOP OF SMOKE
ROOM ROOF
VERIFY IN FIELD TYPE OF BULKHEAD WALL CONSTRUCTION.NOTE: (E) BULKHEAD WALL IS SHOWN AS CAVITY WALL.
MASONRY TO BE REMOVED
(E) MASONRY TO BE RETAINED
NEW BRICKWORK
CIP
E.J.
- CAST IN PLACE
- EXPANSION JOINT
(E)
(N)
- EXISTING
- NEW
S.A.D - SEE ARCHITECTURE DRAWINGS
S.S - STAINLESS STEEL
LEGEND:
ABBREVIATIONS:
E.J.
E.J.
E.J.
BULKHEAD
BULKHEAD
(TYP.)ACM
09/23/2015
+/- 6'-0" (MIN.)
+/- 6'-0" (MIN.)
TOP OF BULKHEAD
ROOF
SIM.
(E) E.J.
CONCRETE CAP(N) PRECAST OR CIP
(N) BRICKWORKTO BE INSTALLED INTO(3) - (N) LOUVERS BEYOND
AND SEALANTJOINT W/BACKER RODREBUILD EXPANSION
AS REQUIREDAND RESTORE ROOFINGINSTALL (N) GRAVEL STOP
AFTER STACK REMOVALBRICKWORK EXPOSED
RESTORE AND REPOINT
S-012
2
+/- 6'-0" (MIN.)
TO REMAINCOMPACTOR STACK
PORTION OF (E)
V.I.F.
SP
AR
K A
RR
EST
OR
RE
MO
VE P
OR
TIO
N O
F (E) C
OM
PA
CT
OR S
TA
CK IN
CLU
DIN
G
V.I.F.
TO REMAINCOMPACTOR STACKPORTION OF (E)S
PA
RK A
RR
EST
OR
RE
MO
VE P
OR
TIO
N O
F (E) C
OM
PA
CT
OR S
TA
CK IN
CLU
DIN
G
+/- 2'-0" (MIN.)
+/- 2'-0" (MIN.)
(N) BRICKWORK
(N) BRICKWORKTO BE INSTALLED INTO(4) - (N) LOUVERS BEYOND
0
(N) BRICKWORK (N) BRICKWORK
(N) BRICKWORKTO BE INSTALLED INTO(4) - (N) LOUVERS BEYOND
TOP OF BULKHEAD
ROOF
SIM.S-012
2CONCRETE CAP(N) PRECAST OR CIP
AS REQUIREDAND RESTORE ROOFINGINSTALL (N) GRAVEL STOP
+/- 6'-0" (MIN.)
EVERY 4TH COURSETYPE 2 SIDES RODS) ATREINFORCEMENT (TRUSSHORIZONTAL S.S JOINT
WYTHE TO BE REBUILTBULKHEAD WALL OUTER
REPAIR ROOF EDGE S.A.D
STAGGEREDHORIZONTALLY O.C 18"
16" O.C VERTICALLY ABDSPACEDROD PENCIL
W/D.STIES VENEER (N)
AS REQUIREDPROVIDE SHORING
OF BULKHEAD WALL REMOVE OUTER WYTHE
(E) BULKHEAD ROOFSLOPE TO MATCH
(N) LOUVERS BEYONDTO BE INSTALLED
INTO (E) BRICKWORK
TO B
E R
EM
OVE
D(E) C
ON
C. S
MO
KE S
HELF
TEST RESULTSNYCHA TO PROVIDE ACM DEMOLISHED/ABATED. (E) TOPPING SLAB TO BER
OO
M E
NTIR
ELY
RE
MO
VE (E) S
MO
KE
(E) COMPACTOR STACK ELEVATION COMPACTOR STACK ELEVATION WITH (N) BRICKWORK
CIP CONCRETE CAP USING FORM DECK- CAP WITH (N) PRECAST CAP SLOPED, OR
AS NEEDED.-CUT STACK TO UNDERSIDE OF SMOKE SHELF
INSTALL LOUVERS ON 3 SIDES. IN EXISITING BRICKS AS REQUIRED.-MAKE NEW OPENING WV/LOUVER
CIP CONCRETE CAP USING FORM DECK- CAP WITH (N) PRECAST CAP SLOPED, OR
CIP CONCRETE CAP USING FORM DECK- CAP WITH (N) PRECAST CAP SLOPED, OR
-INSTALL CAP AS INDICATED ABOVE.PORTION OF BULKHEAD ROOF SLAB.REBUILD BULKHEAD VENEER AND -THAT IS INTEGRAL WITH STACK.BULKHEAD EXTERIOR BRICK VENEER CONCRETE SHELF INCLUDING DEMOLISH STACK TO TOP SIDE OF (E) -DEMOLISH SMOKE ROOM.-REQUIRED AT SMOKE ROOMREMOVE /ABATE (E) TOPPING SLAB AS -
N E V Y O R K C I T YV
HOUSINGAUTHORITY
BROOKLYN / STATEN ISLAND
PROGRAM UNIT:
Designated Space For D
OB Em
ployee Sta
mps & Signatures
DIVISIONCAPITAL PROJECTS
O F F I C E of D E S I G NTEL. 212.306.3000 FAX 212.306.5160
Block No.:
E.D.P. No.:
Development No.:
Zone No.:
Lot No.:
Zoning Map No.:
Drawing Title:
Contract No.:
Drawing No.:
Scale:
Date:
Checked By:
Drawn By:
Seal & Signature:
Contract Title:
VARIOUS
VARIOUS
VARIOUS
00x
BW1432622
Development:
Building Address:
Building No.(s):
Borough of: ORACLE No.:
VARIOUS
VARIOUS
VARIOUS 7681
VARIOUS
Key/Location Plan
New York, New York 1000790 Church Street
Date
BYRev. No. Submissions
Sheet of
.00
VARIOUS
VARIOUS
O. OSTERWIND
JANUARY 15, 2015
S-012
TYP.
V.I.F.
BOTTOM OF LOUVER
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
(N) LOUVERS (TYP)
ALIGN
V.I.F.6"
4"
3"
1'-10" 8"
8"
1'-10"
1'-1" 1'-0"
+/- 1'-6"
1'-10"
1'-10"
1'-10"
1'-10"
3"
"43
2"
"211
"21
GROUT AS NEEDED
(N) LOUVER OPENING
2"
6"6"
BULKHEAD ROOFSLOPE TO MATCH (E)
(E) BULKHEAD ROOF#4 @ 12" DOWELS INTO
(N) CIP CONCRETE CAP
SLAB(E) BULKHEAD ROOF
CONCRETE CAP(N) PRECAST OR CIP
(N) CONCRETE CAP
TO REMAINBULKHEAD WALL
6"
3"
+/- 1'-6"
(N) LOUVER OPENING
BULKHEAD WALL
CONCRETE CAP ABOVE(N) PRECAST OR CIP
1'-10"
WALL (TYP)BULKHEAD BACKUP
E.J
BULKHEAD WALL
(TYP)CONCRETE CAP ABOVE(N) PRECAST OR CIP 0
"
(N) 2 WYTHESOF BRICK (TYP)
ADDITIONAL DOWELSAS REQUIRED SEE NOTESBELOW
BRICK (TYP)(N) TWO WYTHES OF
DETAIL A FOR CONNECTIONCONCRETE CAP SEE(N) PRECAST OR CIP
S.A.D (TYP)FOR SIZE AND NOTES (N) LOUVERS BELOW
DEMOLISH BRICKS INTOOTH PATTERN TO ALLOW FOR INSTALLATIONOF NEW FLASHING
DOWELS (TYP.)#4 (N) RESIN
(N) DOWELSTREAT WITH BONDING AGENTROUGHEN SURFACE TO 1/4" AMPLITUDE
1'-10"
GALVANIZED MESH (TYP)WWF 6X6-D6
T.MELNIKOV / M.ELZOGHABY
B
H
2
(TYP) SEE NOTES BELOW(N) DOWELS @ 4 CORNERS
(TYP) SEE NOTES BELOWDOWELS @ 4 CORNERS (N) # 4 2'-0" LONG S.S THREADED
BE REBUILT (N)1'-6" OF CHUTE TO
BULKHEAD WALL OUTER WYTHE OF
LOUVER INSTALLATION (TYP)AS REQUIRED FOR CREATE NEW OPENING
V.I.F.TYP.
BULKHEAD ROOF
MODIFICATION DETAILS -IICOMPACTOR STACK PROPOSED TYPICAL
DETAILFOR ROOFINGS.A.D. A-011
OF BULKHEAD WALLWYTHEINNER (E)
ROOF SLAB(E) BULKHEAD
SEE DETAIL B(N) DOWEL
ECCNYC 2014VALUEPRESCRIBEDCODE
COMMENTS
BUILDING SYSTEM.OR OVERLOAD EXISTINGCREATE HAZARD ---COMPLIANCE WOULDDEMONSTRATE ---COMPLY IF APPLICANT CANREPAIR WORK NEED NOTALTERATIONS, REPAIRS ---TO ADDITIONS, NYCECC WITH REGARDSSECTION 101.4.3 OFINTERPRETATION OFBB2010-0153.NYCDOB TECH BULLETIN
BEAMS.SPANDREL REPAIR ATMASONRY
ENVELOPE.
DESCRIPTIONITEM
LOCATIONWORK
DESIGN VALUEPROPOSED
T-001.00ON DWG.DOB NOTEREFER TOROOFING.TEMPORARYBEAM.& SPANDRELROOF EDGE N/A N/A
FILED SEPARATELY.ROOFING DRAWINGSREFER TO ARCHITECTURAL TO REPLACE PARAPET.MEANS AND METHODSSYSTEM.TEMPORARY ROOFING
1SCALE: 1 1/2" = 1'-0"
2SCALE: 1 1/2" = 1'-0"
PLAN SECTION BELOW (N) PRECAST/CIP CONCRETE CAP PLAN SECTION BELOW (E) SMOKE SHELF 3SCALE: 1 1/2" = 1'-0"
PLAN SECTION BELOW (N) PRECAST/CIP CONCRETE CAP 4SCALE: 1 1/2" = 1'-0"
PLAN SECTION OF (N) BRICKWORK WITH 2 LOUVERS
5SCALE: 1 1/2" = 1'-0"
(N) BRICKWORK AND PRECAST CAP SECTION 6SCALE: 1 1/2" = 1'-0"
(N) BRICKWORK AND PRECAST CAP SECTION
A (N) PRECAST CAP DETAILSCALE: 3" = 1'-0"
BSCALE: 3" = 1'-0"
(N) PRECAST CAP ANCHORING DETAIL
A
V.I.F.
BOTTOM OF LOUVER
FREE AIR AREA (IN )COMPACTOR STACK
BXHONE SIDE LOUVER
BXHTWO SIDES LOUVERS
BXHFOUR SIDES LOUVERS
BXHTHREE SIDES LOUVERS
LESS THAN 500
500-1000
1000-1200
2'-0" X 2'-0"
2'-0" X 3'-6"
2'-0" X 4'-6"
2'-0" X 2'-0"
2'-0" X 3'-6"
3'-0" X 3'-0"
2'-0" X 1'-6"
2'-0" X 2'-6"
3'-0" X 2'-0"
1'-6" X 1'-6"
2'-0" X 2'-0"
2'-6" X 2'-0"
NOTES:
BUILDING ENVELOPE.WORK DESCRIBED HERE DOES NOT PERMANENTLY AFFECT ENERGY PERFORMANCE OF 18.
THIS SITUATION ARISE THE REQUIREMENTS OF THE CURRENT NYCECC MUST BE CONSIDERED.SURFACES ARE COINCIDENT WITH THE EXTERIOR ENVELOPE OF THE MAIN BUILDING. SHOULD THESE DETAILS DO NOT COVER COMPACTOR STACKS WHEN ONE OR MORE OF THEIR EXTERIOR 17.
LOUVER, IT MAY BE ROTATED 90° IF REQUIRED.WHERE THE DIMENSIONS OF THE STACK DOES NOT ALLOW PROPOSED ORIENTATION OF 16.
SHALL BE MAINTAINED TO ALLOW FOR LOUVER ANCHORAGE TO BRICK WALL.9" MIN. MEASURED HORIZONTALLY FROM LOUVER FRAME TO EDGE OF COMPACTOR STACK 15.
STACK WIDTH AND LENGTH.TO DETERMINE POSSIBLE DIMENSIONAL VARIATIONS, FIELD VERIFY SPECIFIC COMPACTOR 14.
PROVIDE WIRE MESH AND INSTALL IN FRAME BEHIND LOUVER AS SPARK ARRESTOR.13.
USE STANDARD LOUVER GREENHECK MODEL ESD-635X OR EQUAL.12.
OPPOSING FACES.WHERE POSSIBLE TWO LOUVERS MAX. ARE TO BE USED, THEY ARE TO BE INSTALLED ON 11.
DETAIL 1/S-011.00.TOP OF COMPACTOR STACK VENT CAP TO BE 6'-0" ABOVE FINISHED MAIN ROOF SURFACE, SEE 10.
COMPACTOR ROOM IF CONSTRUCTED OF 8" MIN. BRICK MASONRY.PER RCNY 24-01, EXISTING COMPACTOR STACK DO NOT REQUIRE SPRINKLER IN STACK ABOVE 9.
ALL WORK INDICATED IS SUBJECT TO MASONRY SPECIAL INSPECTION.8.
FLASHING, SNOW DRIFT, LOUVERS CAN BE ACCOMMODATED.HEIGHT OF COMPACTOR STACK VENT ABOVE NEAREST ROOF TO BE SUCH THAT ROOFING 7.
(N) LOUVERS TO BE GALVANIZED STEEL OR ALUMINUM.6.
OF THE COMPACTOR STACK.THE TOTAL NET CROSS SECTION AREA OF THE NEW LOUVERS IS TO MATCH INSIDE OPEN AREA 5.
NEW BRICK WORK.PROVIDE STAINLESS STEEL HORIZONTAL WALL REINFORCEMENT AT EVERY FOUR COURSE OF 4.
BRICKWORK AT 16" O.C. EACH WAY.STAINLESS STEEL DURO-WALL HB-5213 14 GA TIES OR EQUAL TO BE INSTALLED FOR NEW 3.
EQUAL FOR CONCRETE WITH 6" MIN. EMBEDMENT.DOWELS TO BE #4 S.S. BARS SET IN HILTI HY 70 OR EQUAL FOR MASONRY , HILTI HY 200 OR 2.
FEET, INSTALL ADDITIONAL DOWELS AT 18" O.C.PROVIDE DOWELS AT EACH CORNER OF NEW STACK. IF STACK DIMENSION EXCEEDS THREE 1.
TABLE 1 - REQUIRED LOUVER SIZES BASED ON 50% FREE AIR (ADJUST DIMENSIONS AS NEEDED)
TABLE 2 - ENERGY ANALYSIS FOR ALTERATION - CLIMATE ZONE 4A (ENVELOPE ONLY)
5 6
CAP ABOVEAND (N) PRECAST/CIP ABOVE TO BE REMOVEDEXIST. SMOKE SHELF
S.A.D (TYP)FOR SIZE AND NOTES (N) LOUVERS BELOW
009/23/2015
MASONRY TO BE REMOVED
(E) MASONRY TO BE RETAINED
NEW BRICKWORK
LEGEND:
CIP
E.J.
- CAST IN PLACE
- EXPANSION JOINT
(E)
(N)
- EXISTING
- NEW
S.A.D - SEE ARCHITECTURE DRAWINGS
S.S - STAINLESS STEEL
ABBREVIATIONS:
N E V Y O R K C I T YV
HOUSINGAUTHORITY
BROOKLYN / STATEN ISLAND
PROGRAM UNIT:
Designated Space For D
OB Em
ployee Sta
mps & Signatures
DIVISIONCAPITAL PROJECTS
O F F I C E of D E S I G NTEL. 212.306.3000 FAX 212.306.5160
Block No.:
E.D.P. No.:
Development No.:
Zone No.:
Lot No.:
Zoning Map No.:
Drawing Title:
Contract No.:
Drawing No.:
Scale:
Date:
Checked By:
Drawn By:
Seal & Signature:
Contract Title:
VARIOUS
VARIOUS
VARIOUS
00x
BW1432622
Development:
Building Address:
Building No.(s):
Borough of: ORACLE No.:
VARIOUS
VARIOUS
VARIOUS 7681
VARIOUS
Key/Location Plan
New York, New York 1000790 Church Street
Date
BYRev. No. Submissions
Sheet of
.00
VARIOUS
VARIOUS
O. OSTERWIND
JANUARY 15, 2015