Transcript
Page 1: EAF Mobile Facilities  (Ie Shima Island)

EAF Mobile Facilities (Ie Shima Island)

Page 2: EAF Mobile Facilities  (Ie Shima Island)

QHR205(please note: This is a MALS-36 MF CSC failure, beyond Repair

capability.)

ISO corners delaminating and coliflowering.

ISO corners delaminating and coliflowering.

Page 3: EAF Mobile Facilities  (Ie Shima Island)

QHR205

Cracked ISO corner due to corrosion damage.

Bottom side rail damage/deteriorated by corrosion.

Page 4: EAF Mobile Facilities  (Ie Shima Island)

QHR205

Forklift pockets deteriorated beyond

repair capability. Brittle to the touch.

(All forklift pockets are in the same condition.

Page 5: EAF Mobile Facilities  (Ie Shima Island)

QHR171 (please note: This is a NADEP MF CSC failure, beyond Repair capability.)

ISO Corner Coliflowering.

Page 6: EAF Mobile Facilities  (Ie Shima Island)

QHR171

ISO Corner Coliflowering.

Corrosion damage on side rail

(structural member).

Page 7: EAF Mobile Facilities  (Ie Shima Island)

QHR171

ISO Corner Coliflowering.

Page 8: EAF Mobile Facilities  (Ie Shima Island)

QHR171/QHR205Please note: More pictures are available if needed.


Top Related