Download - E-Title survey module (ETSM)
![Page 1: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/1.jpg)
DEVELOPMENT OF NATIONAL DIGITAL CADASTRAL DATABASE (NDCDB) IN JUPEM PERAK
SR JOHN ELVIS KOH, S.I.S., P.P.T., F.R.I.S.M.
PENGARAH JABATAN UKUR & PEMETAAN NEGERI PERAK
![Page 2: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/2.jpg)
VISION MAKING JUPEM’S AN EMINENT ORGANISATION IN PROVIDING OUTSTANDING SURVEY AND MAPPING SERVICES
AS WELL AS GEOSPATIAL DATA MANAGEMENT TOWARDS FULFILLING THE NATION’S VISION.
MISSION PROVIDING A QUALITY SURVEY AND MAPPING AND SERVICES AND GEOSPATIAL DATA MANAGEMENT VIA FIRST-
RATE SYSTEM, COMPETENT HUMAN RESOURCE AND CONDUCIVE WORKING ENVIRONMENT.
MOTTO THE CATALYST FOR NATIONAL DEVELOPMENT AND CITIZEN’S PROSPERITY
OBJECTIVES • TO ENSURE THE PRODUCTS AND LAND SURVEY AND MAPPING SERVICES MEETS THE QUALITY ACCEPTANCE
AND CUSTOMER’S NEEDS.
• TO ENSURE A WELL MAINTAIN,UP-TO-DATE CADASTRAL AND MAPPING DATABASE TO MEET NEEDS OF THE
NATIONAL GEOSPATIAL INSFRASTRUCTURE.
• TO MAKE JUPEM AS AN EXCELLENT REFERENCE CENTRE IN THE FIELD CADASTRAL SURVEY AND MAPPING.
• TO SURVEY DETERMINE,DEMARCATE STATE AND INTERNATIONAL BOUNDARIES.
JUPEM
![Page 3: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/3.jpg)
CARTA ORGANISASI JABATAN UKUR DAN PEMETAAN NEGERI
CAWANGAN PU
SEKSYEN HAKMILIK
TANAH
PEJABAT UKUR DAERAH SEKSYEN KHIDMAT SISTEM SEKSYEN PENTADBIRAN
DAN KEWANGAN
SEKSYEN STRATA /
STRATUM /MARIN
CAWANGAN SSM
CAWANGAN CRM CAWANGAN
INSPEKTORAT
SEKSYEN NDCDB SEKSYEN PDUSSM
CAWANGAN
STANDARD NDCDB CAWANGAN
STANDARD PDUSSM
CAWANGAN
PEWARTAAN
CAWANGAN
MULTIPURPOSE
KADASTER
CAWANGAN KHIDMAT
PELANGGAN
CAWANGAN PELAN
BERDIGIT
PENGARAH UKUR DAN PEMETAAN NEGERI
TIMBALAN PENGARAH UKUR DAN
PEMETAAN (Pangkalan Data)
TIMBALAN PENGARAH UKUR DAN
PEMETAAN (Penawanan Data)
![Page 4: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/4.jpg)
What we produce now?
• (photo of modern CP in digital form)
• Ultimate cadastre product : B1.tiff for Title
• (photo of Title wt B1)
• Pg.269
B1 plan
![Page 5: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/5.jpg)
Then
• Cadastral survey
activities carried
out to produce
Certified Plan
(Pelan Akui)
• Certified Plan was
painstakingly
hand-drawn and
produced in
hardcopy.
![Page 6: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/6.jpg)
What we produce then?
• (photo of historic CP)
• hardcopy
![Page 7: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/7.jpg)
Now • Survey activities
carried out in a digital environment
• Survey ASCII is imported and processed in a GIS environment and stored in database.
• Certified Plans are extracted from database.
• This database is called NDCDB
Total Station:
measure distances
and angles of lines
Toughbook:
equipped with eTSM
for data recording
![Page 8: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/8.jpg)
eKadaster
•RMK-9 Project
•Three main components: • Virtual Survey System (SUM)
• Cadastral Data Integrity System (SKDK)
• Coordinated Cadastre System (CCS)
![Page 9: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/9.jpg)
SKDK
CCS
SUM
Concepts of eKadaster
![Page 10: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/10.jpg)
eKadaster Objectives • The objective of eKadaster project is to drastically
improve the time frame of delivery system of land title survey.
• To develop National Digital Cadastral Database (NDCDB) for Peninsular Malaysia and W.P. Labuan.
• To develop Strata/Stratum/Marin Database (PDUSSM)
• To integrate eKadaster with e-Tanah in spatial information sharing
• To provide GIS ready infrastructure and information
• To apply GNSS technology in cadastral survey
![Page 11: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/11.jpg)
•eLodgement
•eKadasOnLine
JUPEM2U
CSRS
Notification
Web
GIS
•eCadasonline
•eKiosk
•eReporting
•eMonitoring
•eNotification
eCRM
eTSM
eSSM
Field
Strata • Strata
•Strata Data Entry
LS
Strata
GIS
SUM
eQC
eSPEK
SPEK
• SUM LSA
Database
•Watchguard
•Fortigate
•SPAK HQ
•SPAK LS
•SPAK
•eSigning
•eVerifier
•2D Barcode
•eAnotation
eReporting
eSupport
ePKI eMedmAS
• eReporting
•eReporting HQ
Non GIS
SPAK
Security SPPK •SPPK
•SPPK HQ
ePU DRP
eGLMS
Desktop
GIS •ePU
•eJalan
•eTownKg
•eAdminBdy
•eHidrografi
•eBangunan
•eWarta
•eGrid
•ePA, ePA(B)
•ePA(S),
•ePA(W), eB1
•eB4, ePA(M)
•ePetakadas eFEE
• eFee
GLMS
PDUSSM
NDCDB
eSPID
APPLICATION MODULES
• eSPID
![Page 12: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/12.jpg)
CSRS/JUPEM2U
![Page 13: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/13.jpg)
CSRS/ JUPEM2U USERS
JURUUKUR
BERLESEN
CSRS/
JUPEM2U JURUUKUR
DAERAH
INSPEKTORAT
eSSM
PENGARAH
UKUR
PENGUKUR
eCRM
PENGUKUR
eTSM
PTG / PTD
JUPEM
HQ
eCadasOnline
Download B1 Tiff
eCadasOnline
eMonitoring
eCadasOnline
eMonitoring
Upload Strata XML
Download Strata
XML eCadasOnline
eMonitoring
Download CRM Job
Upload Survey CRM
Job
eCadasOnline
Download Job
Download NDCDB &
CRM
Upload for SUM
processing
View SUM Report
Append
Minute/Attachment
eCadasOnline
eMonitoring
Assign Job
Assign CRM
Define
CRM Point
Checking
Minute
Job Mobilization
View Job status
eCadasOnline
Upload Precomp
Download
lot numbers & Precomp
Upload Strata
Upload for SUM
Processing (Checking)
Upload for SUM
Processing
(Lodgement)
View SUM Report
Digital Signing
Fieldbook
eCadasOnline
eMonitoring
Approval PreNDCDB
Approval Strata
![Page 14: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/14.jpg)
eSPEK
![Page 15: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/15.jpg)
LAYER LOT C3
LAYER WARTA
LAYER JALAN
LAYER TOWN KG
LAYER ADMINBOUNDARY
EGLMS
![Page 16: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/16.jpg)
Milestone to NDCDB
![Page 17: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/17.jpg)
CREATION OF NDCDB
• Since 2010.
• GIS-ready homogeneous database with geocentric datum.
• To adapt the use of GNSS technologies.
• NDCDB is the gist of eKadaster
• NDCDB developed under eKadaster Project (RMK9) to
replace DCDB (PDUK) which is not homogenous and
isolated.
![Page 18: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/18.jpg)
GIS Interface in NDCDB: Lot layer
![Page 19: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/19.jpg)
Stone Layer (stn)
![Page 20: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/20.jpg)
Boundary (bdy) Layer
![Page 21: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/21.jpg)
WHY NDCDB?
RIGID
COORDINATE Homogenous and Systematically Adjusted
PLOTTING
COORDINATE For cadastral map plotting purposes
SYSTEM
COORDINATE System/Software generated coordinate
based on features location
Rigid Coordinate Plotting Coordinate System Coordinate
![Page 22: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/22.jpg)
CLEANING
CP BY CP
CCI-LAYER R&R
BLOCK ADJ
Re
Coordination
Re
Population
Adjust Block
Using 4 control point
And re-coordination
based on GDM 2000
Repopulation of
Pre-NDCDB and
Field Validation NDCDB
Append Traverse
and Point
Add Connection line
Cleaning
- Direction
- Bearing
- Distance
Adjust CP by CP
using LSA
Validation
By PPSME
Reconnaissance
Monumentation
Tie-UP
GPS-Obs
QC
How is NDCDB established?
![Page 23: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/23.jpg)
Perak NDCDB Statistics New_NDCDB
Parameters
30th April 2012 19 July 2016
Adjustment Blocks 644 Blocks 644 Blocks
Cadastral Control Marks 2,591 Points 6431 Points
NDCDB Lots 961,468 Lots 1,012,064 Lots
NDCDB Lots (3rd Class) 40,217 Lots 36,744 Lots
Boundary Marks 2,548,208 Points 2,598,279 Points
![Page 24: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/24.jpg)
Establishment of Cadastral Control Infrastructure (CCI)
![Page 25: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/25.jpg)
CRM Distribution for Perak (until 15 July 2016
644 Blocks
6431 points
CRM
![Page 26: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/26.jpg)
2.GNSS Observation
Stone ID :7281747956
U64797.675
T-37278.467
1.Adjustment
Stone ID :7281747956
U 64797.675
T -37278.512
3.Difference:
Jarak :0.045
Bearing :270.0000
Concept of GP Ground Proofing
![Page 27: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/27.jpg)
Workflow of Title Survey
![Page 28: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/28.jpg)
The way forward • Upgrading of eKadaster
• Strengthening Infrastructure of eKadaster
• SmartKadaster phase II
• Study on Development of 3D Cadastral Database and Land
Administration Domain Model ( LADM ) In Open Source
• Outsource the upgrading of substandard lots (Demarcation
and 3rd class)
![Page 29: E-Title survey module (ETSM)](https://reader034.vdocuments.site/reader034/viewer/2022052123/5885e1381a28abaa198c8363/html5/thumbnails/29.jpg)
Conclusion
• GIS technology increases cost-effectiveness and
result in significant improvement in productivity.
• GIS technology significantly changes and improves
JUPEM delivery system.
• Important role of Cadastral layer in SDI