LOBBY
WAITING LOBBY
FEMALE TOILET
MALE TOILET
OFFICE ROOM
RECEPTION
GROUND FLOOR PLAN
3950 3900 3900
GL1 GL2
UPPER FLOOR PLAN
RESTURANT
BUFFET
HAND WASHING
D4
D5
D6
D1
D1
D1
D1
D3
D2 D2
D2D2
FG FG FG FG FG
FGFG FG FG FG
FG
FG
W1 W1 W1 W1
W1 W1 W1 W1 W1
2080 2110 2110 2090 2170 2100 2130 2120 2080
2180 2100 2110 2130 2100 2140 2110 2120 2090 2100
2090
19852130
2160
1000 1282.5
3900 4650
2810
4710
1800
9609840
23550
1200 2482.5
1800
1050
Down
Up
Down
Up
Laminated Tempered GlassPartition Up To Slab/Beam Level
Floor Carpet
High Pressure laminatedcompact board Toilet Partition
Decorative Timber Panel Wall
G.I.Hand Rail
High Pressure laminatedcompact board Toilet Partition
High Pressure laminatedcompact board Toilet Partition
W2
SCHEDULE OF DOORS & WINDOWSTYPE SIZE DESCRIPTION CILL HT.
D3-
900x2100
-
D1
-
D4 1200x2100
FG
750x2100D2
Powder coated Al. framed single sash Al. composite panel (both sides) door
W1
W2
12mm Thick laminated tempered glass twin sash door with 12mm thick fixed laminated tempered glass up to slab beam level
-
High Pressure Laminated compact board toilet door
1200x2100 Powder coated Al. framed twin sash Al. composite panel (both sides) door
10mm Thick Laminated Tempered glass window
10mm Thick Laminated Tempered fixed glass
Powder coated Al. framed window
GL1
GL2
G.I. Box section grill
G.I. Box section grill
3950
3940
Laminated Tempered GlassPartition Up To Slab/Beam Level
4500
4665
900
Full Mirror
L1 x H1
L2 x H2
L3 x H3
L4 x H4
Approx. 900 mm
Approx. 900 mm
h3
h4
Note:- Sizes of the W1, W2 ,FG , GL1 & GL2 depend on the site condition.
1270x1330
Existing Walls to be demolished
Existing Walls to be demolished
Link t
o New
Buil
ding
Hand Rail
Hand Rail
2130
2045P1
FG
P2
12mm Thick fixed laminated tempered glass with 12mm thick fixed laminated tempered glass up to slab beam level
D5 1200x2100 12mm Thick laminated tempered glass twin sash door with 12mm thick fixed laminated tempered glass up to slab beam level960x2100 12mm Thick fixed laminated tempered glass with 12mm thick fixed laminated tempered glass up to slab beam level
D6 1200x2100 12mm Thick laminated tempered glass twin sash door with 12mm thick fixed laminated tempered glass up to slab beam level845x2100 12mm Thick fixed laminated tempered glass with 12mm thick fixed laminated tempered glass up to slab beam level
-
-
2/ 465x2100
(Existing window)
Proposed Wall
Proposed H.P.L. Partitions
Existing Wall
Proposed Tempered glass partitions
A
1800
1200 2482.5
1800
2100mm High Pressure laminatedcompact board Toilet Partition
D1
D2 D2GL1
W.C W.C
Stainlesssteel soap tray(900mm above from F.F.L.)
1000 1282.5
W.B.
1800
S.S.Bidet spray600mm above from F.F.L
S.S.Toilet paper holderfixed to wall 600mm above from F.F.L.
25 D
rop
25 D
rop
25 D
rop
500
1800mmx750mm Plate glassmirror fixed to wall1750mmabove from F.F.L.
2100mm High Pressure laminatedcompact board Toilet Partition
300mm x 600mm vitreousporcelain homogenousmatt tile(Non slippery)on earlier laid to slope.
600mm x 300mm vitreousporcelain semi glazed full body tilelining up to a height of2100mm from finished floor level
18mm Thick Granite finished vanity top
500 450
D1
D2 D2
GL2
W.B.
W.B.
W.C W.C
S.S.Bidet spray600mm above from F.F.L
1145
Stainlesssteel soap tray(825mm above from F.F.L.)
600mmx750mm Plate glassmirror fixed to wall1750mmabove from F.F.L.
25 D
rop
25 D
rop
25 Drop
S.S.Toilet paper holderfixed to wall 600mm above from F.F.L.
2100mm High Pressure laminatedcompact board Toilet Partition
2100mm High Pressure laminatedcompact board Toilet Partition
300mm x 600mm vitreousporcelain homogenousmatt tile(Non slippery)on earlier laid to slope.
500 500
Staircase line above
TOILET PLAN -FEMALE
TOILET PLAN -MALE
A
B
B
1800mmx750mm Plate glassmirror fixed to wall1750mmabove from F.F.L.
Stainlesssteel soap tray(900mm above from F.F.L.)
175025mm
DropW.C
Bidet spray600mm above F.F.L
StainlessBottle Trap
D1D2
2100mm High Pressure laminatedcompact board Toilet Door
825
2100
25mmDrop
75 mm Massconcrete
Dry Earth Filling
SECTION A-A
75mm Thk. R.C.C.slab with18mm Thick Granite finished vanity top
18mm Thick Granite facia.
2100
W.B.
Foundation(See Structural details)
GL2
600mm x 300mm vitreousporcelain semi glazed full body tilelining up to a height of2100mm from finished floor level 600mmx750mm Plate glass
mirror fixed to wall1750mmabove from F.F.L.
Stainlesssteel soap tray(825mm above from F.F.L.)
175025mm
DropW.C
Bidet spray600mm above F.F.L
D2
2100mm High Pressure laminatedcompact board Toilet Door
825 25mm
Drop
75 mm Massconcrete
Dry Earth Filling
SECTION B-B
2100
W.B.
Foundation(See Structural details)
W.B.
825
Existing Walls to be demolished
Existing Walls to be demolished
DB/CON-ARCH/FM-C/01
NOTES
S.A.T.Sooriyaarachchi
NOTES
Refer Structural Drawings for exact sizes of
R.C.C.Columns,Beams,Steel structures etc.
1.0
All dimensions to be checked at site prior to any construction
is commenced.
2.0
Any discrepancy in Architectural,Structural,Water supply and
Electrical Drawings and other items should be brought to
notice of the consultant for clarification and finalization.
3.0
C.K.Jayasooriya
Ceiling Height may verified according to the beam height .
(It is necessary to maintain 2700mm of clear height)
4.0
Any changes made after obtaining council -
approval regarding Architectural design,
site location & orientation without Architect's written
consent & responsibility of their adverse effects
on final product shall not be borne by the Architect.
5.0
Copyright of Architectural design shown,
are retained by the Architect & authority is
required for any reproduction.
6.0
BUILDINGS DEPARTMENT
CONSULTANCY SERVICES DIVISION
ARCHITECTURAL SERVICES
"SETHSIRIPAYA"
BATTARAMULLA
A
MARK DATE MADE BY:
(CONCEPT & DESIGN BY)
PROJECT ARCHITECT
SENIOR ARCHITECT
DIRECTOR
(ARCHITECTURAL SERVICES)
DRAWING NO :
SHEET NO :
PROJECT:
ADDITIONAL DIRECTOR GENERAL
(CONSULTANCY SERVICES)
REVISION
SKETCH DESIGN NO:
PROPOSED RENOVATION
NATIONAL HOLIDAY RESORT
AT ANURADHAPURA
DRAWN :
SCALE :
CHKD :
FILE NO :
DATE :
T.A.O. :
PID:
S.A.T.Sooriyaarachchi
03-01-15-AR150
2019-SD-03-004
Connected Architectural Drawings :
2019-03-004AR01 - Ground floor plan ,upper floor plan ,
schedule of openings
& details of toilets
2019-03-004AR02 - Details doors & windows
2019-03-004AR03 - Details of partitions & miscellaneous
1:100 , 1:50
09.07.2019
2019-03-004AR01
01/03
GROUND FLOOR PLAN ,UPPER FLOOR PLAN ,
SCHEDULE OF OPENINGS & DETAILS OF TOILETS
DRAFT
F.F.L.
Stainless Steeldoor handle
2100
Up to
Slab
/ bea
m lev
el
1100
600
12mm Thick Fixed Laminated Tempered glass
12mm Thick LaminatedTempered glassTwin sash door
700
100
150
300
150
100Sandblast stickers
1200
D4ELEVATION
Up to
Slab
/ bea
m lev
el
Equal 2(465)
2130
F.F.L.
Stainless Steeldoor handle
2100
Up to
Slab
/ bea
m lev
el
1100
600
12mm Thick Fixed Laminated Tempered glass
12mm Thick LaminatedTempered glassTwin sash door
700
100
150
300
150
100Sandblast stickers
1200
D6ELEVATION
Up to
Slab
/ bea
m lev
el
2045
F.F.L.
Stainless Steeldoor handle
2100
Up to
Slab
/ bea
m lev
el
1100
600
12mm Thick Fixed Laminated Tempered glass
12mm Thick LaminatedTempered glassTwin sash door
700
100
150
300
150
100Sandblast stickers
1200
D5ELEVATION
Up to
Slab
/ bea
m lev
el
2160
845960
FGELEVATIONW1ELEVATION
Appr
ox.
900
H2 (U
p to b
eam
level)
Appr
ox.
900
H1 (U
p to b
eam
level)
L2L1
Equal1 Equal1 Equal1 Equal1 Equal3 Equal3
10mm Thick Laminated Tempered glass10mm Thick Laminated Tempered glass
F.F.L. F.F.L.
Existing Upper Floor Column
Existing Upper Floor ColumnFixed Glass Fixed Glass Fixed Glass Fixed Glass
F.F.L.
900
Powder CoatedAl. Frame
2100
900
Al. composite panel(Both sides)
Stainless Steeldoor handle
100
120
80
70 70
D1
1100
450
ELEVATION
Powder CoatedAl. Frame
Stainless Steeldoor handle
70 70 70
900
2100
1200
8010
012
0
1100
D3ELEVATION
F.F.L.
Al. composite panel(Both sides)
750
2100Door handle
1975
125
High pressurelaminated board Door(Besco or equivalent )
Support
D2ELEVATION
F.F.L.
Equal 2(465)
DB/CON-ARCH/FM-C/01
NOTES
S.A.T.Sooriyaarachchi
NOTES
Refer Structural Drawings for exact sizes of R.C.C.Columns,Beams,Steelstructures etc.
1.0
All dimensions to be checked at site prior to any constructionis commenced.
2.0
Any discrepancy in Architectural,Structural,Water supply andElectrical Drawings and other items should be brought tonotice of the consultant for clarification and finalization.
3.0
C.K.Jayasooriya
Ceiling Height may verified according to the beam height .(It is necessary to maintain 2700mm of clear height)
4.0
Any changes made after obtaining council -approval regarding Architectural design,site location & orientation without Architect's writtenconsent & responsibility of their adverse effectson final product shall not be borne by the Architect.
5.0
Copyright of Architectural design shown,are retained by the Architect & authority isrequired for any reproduction.
6.0
BUILDINGS DEPARTMENT
CONSULTANCY SERVICES DIVISION
ARCHITECTURAL SERVICES
"SETHSIRIPAYA"
BATTARAMULLA
A
MARK DATE MADE BY:
(CONCEPT & DESIGN BY)
PROJECT ARCHITECT
SENIOR ARCHITECT
DIRECTOR
(ARCHITECTURAL SERVICES)
DRAWING NO :
SHEET NO :
PROJECT:
ADDITIONAL DIRECTOR GENERAL
(CONSULTANCY SERVICES)
REVISION
03-01-15-AR150
SKETCH DESIGN NO: 2019-SD-03-004
RENOVATION & IMPROVEMENT
OF ENTRANCE BUILDING
AT NATIONAL HOLIDAY RESORT ,
ANURADHAPURA
DRAWN :
SCALE :
CHKD :
FILE NO :
DATE :
T.A.O. :
PID:
S.A.T.Sooriyaarachchi
Connected Architectural Drawings :
2019-03-004AR01 - Ground floor plan ,upper floor plan ,
schedule of openings
& details of toilets
2019-03-004AR02 - Details doors & windows
2019-03-004AR03 - Details of partitions & miscellaneous
DETAILS OF DOORS & WINDOWS
1:50 , 1:25
25.06.2019
02/03
2019-03-004AR02
DRAFT
F.F.L.
4500
12mm Fixed Laminated Tempered glass
12mm Thick FixedLaminated Tempered glass
Sandblast stickers
700
100
150
300
150
100
2100
Equal 3
ELEVATION
F.F.L.
4665
12mm Fixed Laminated Tempered glass
12mm Thick FixedLaminated Tempered glass
Sandblast stickers
700
100
150
300
150
100
2100
Equal 1
P1ELEVATION P2
Up to
Slab
/ bea
m lev
elUp
to S
lab/ b
eam
level
Up to
Slab
/ bea
m lev
elUp
to S
lab/ b
eam
level
Equal 1 Equal 1 Equal 1 Equal 3 Equal 3 Equal 3
450
1800
Wall HangedDigital TV
Decorative Red Colour Wall
ELEVATION(Decorative Timber paneled Wall)
F.F.L.
75
7575
7512
.512
.5
Up to
Ceil
ing Le
vel
3700
18.75x18.75mm G.I. Box Section
37.5x37.5mm G.I. Box Section50x50mm G.I. Box Section
100100
100
GL1ELEVATION
L3
h3H3
(Up t
o Slab
/Bea
m Le
vel)
Decorative Timber Panels fixed to wall
50x50mm G.I. Box Section
Existing Ground Floor Column
Equal Equal Equal
100
Equa
lEq
ual
18.75x18.75mm G.I. Box Section
37.5x37.5mm G.I. Box Section50x50mm G.I. Box Section
GL2ELEVATION
L4
h4H4
(Up t
o Slab
/Bea
m Le
vel)
50x50mm G.I. Box Section
Existing Ground Floor Column
Equal Equal Equal
100
Equa
lEq
ual
100100
100
1050
DB/CON-ARCH/FM-C/01
NOTES
S.A.T.Sooriyaarachchi
NOTES
Refer Structural Drawings for exact sizes of R.C.C.Columns,Beams,Steelstructures etc.
1.0
All dimensions to be checked at site prior to any constructionis commenced.
2.0
Any discrepancy in Architectural,Structural,Water supply andElectrical Drawings and other items should be brought tonotice of the consultant for clarification and finalization.
3.0
C.K.Jayasooriya
Ceiling Height may verified according to the beam height .(It is necessary to maintain 2700mm of clear height)
4.0
Any changes made after obtaining council -approval regarding Architectural design,site location & orientation without Architect's writtenconsent & responsibility of their adverse effectson final product shall not be borne by the Architect.
5.0
Copyright of Architectural design shown,are retained by the Architect & authority isrequired for any reproduction.
6.0
BUILDINGS DEPARTMENT
CONSULTANCY SERVICES DIVISION
ARCHITECTURAL SERVICES
"SETHSIRIPAYA"
BATTARAMULLA
A
MARK DATE MADE BY:
(CONCEPT & DESIGN BY)
PROJECT ARCHITECT
SENIOR ARCHITECT
DIRECTOR
(ARCHITECTURAL SERVICES)
DRAWING NO :
SHEET NO :
PROJECT:
ADDITIONAL DIRECTOR GENERAL
(CONSULTANCY SERVICES)
REVISION
03-01-15-AR150
SKETCH DESIGN NO: 2019-SD-03-004
RENOVATION & IMPROVEMENT
OF ENTRANCE BUILDING
AT NATIONAL HOLIDAY RESORT ,
ANURADHAPURA
DRAWN :
SCALE :
CHKD :
FILE NO :
DATE :
T.A.O. :
PID:
S.A.T.Sooriyaarachchi
Connected Architectural Drawings :
2019-03-004AR01 - Ground floor plan ,upper floor plan ,
schedule of openings
& details of toilets
2019-03-004AR02 - Details doors & windows
2019-03-004AR03 - Details of partitions & miscellaneous
DETAILS OF PARTITIONS & MISCELLANEOUS
1:25
25.06.2019
03/03
2019-03-004AR03
DRAFT
ST
OR
E-3
ST
OR
E-2
LAUNDRY
VERANDAH
ST
AF
F-G
R-1
ST
AF
F-G
R-2
Living Area
ST
AF
F-G
R-2
ST
AF
F-G
R-3
STAFF-COMMON
TOILET
Bathroom -3
GAS
STORE
LINEN
STORE
ST
OR
E - 1
STORE-4
Bathroom
STAFF-GR-1
Dometry
DRAFT
9420
1360
DOWN
13
67
0
Pa
ntry
Ch
ef R
oo
m
2800
2220
K
S
24
35
In
du
stria
l K
S
Ga
s b
urn
ers
Kitch
en
H
oo
d
Fre
eze
rR
efrig
era
to
r
Ta
ble
s
kitch
en
ca
bin
et w
ith
co
un
te
rto
pDRAFT
DRAFT
Detail – Renovation Main building NHR
Decorative Pendent type lobby light Fitting
Decorative Pendent type spot light Fitting
Decorative Ceiling mounted light Fitting
DRAFT
Decorative Bell type pendent light fitting
Decorative Down light
Decorative Ceiling Fan DRAFT
Chair 01
Floor Carpet
Chair 02
DRAFT
Flower Trough
DRAFT