doc.: IEEE 802.11-13/0214r1
Report
March 2013
Adrian Stephe
ns, Intel
Corporation
Slide 1
802.11 March 2013 Closing Reports
Date: 2013-03-22
Name Company Address Phone email Adrian Stephens Intel
Corporation +44 792 008
4900 (mobile)
Authors:
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Adrian Stephe
ns, Intel
Corporation
Slide 2
Abstract
• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the March 2013 closing plenary meeting.
doc.: IEEE 802.11-13/0214r1
Report
Attendance SummaryMarch 2013
Adrian Stephe
ns, Intel
Corporation
Slide 3
Breakout Meetings Avg Attendance
Sum Attendance
Max Attendance
Min Attendance
802.11 Newcomer Training 1 22ARC 1 29Editors Meeting 1 15JTC1 3 10 30 11 9PAR Comments 2 7 14 7 7REG SC 4 35 142 38 32Social 1 21
TGac 2 46 93 48 45TGaf 5 37 187 49 21TGah 4 100 402 141 78TGai 8 110 881 145 60TGai / TGaq 1 112TGaj 2 38 77 61 16TGak 2 24 48 24 24TGak - Joint Meeting with 802.1 1 35TGaq 2 64 128 64 64TGmc 7 21 152 32 13Tutorials 1 172WG CAC 3 9 27 12 6WG Closing Plenary 1 3
WG Mid-Session Plenary 1 214
WG Opening Plenary 1 220
WNG 1 178
WNG SC 1 206
doc.: IEEE 802.11-13/0214r1
Report
Attendance Histogram (Thu)March 2013
Adrian Stephe
ns, Intel
Corporation
Slide 4
doc.: IEEE 802.11-13/0214r1
Report
Type of Groups
March 2013
Adrian Stephe
ns, Intel
Corporation
Slide 5
Type of Group DescriptionWG Working GroupTG Task GroupSG Study GroupSC Standing
Committee
doc.: IEEE 802.11-13/0214r1
Report
GroupsMarch 2013
Adrian Stephe
ns, Intel
Corporation
Slide 6
Type Group Description Chair
WG WG11 The IEEE 802.11 Working Group Bruce Kraemer
TG MC Maintenance (Revision C) Dorothy StanleyTG AC Very High Throughput (<6 GHz bands) Osama Aboul-MagdTG AF Operation in TV Whitespace bands Richard KennedyTG AH Operation in 900 MHz bands Dave Halasz TG AI Fast Initial Link Setup Hiroshi ManoTG AJ China Millimeter Wave (CMMW) Xiaoming PengTG AK General Link Setup Donald Eastlake 3rd TG AQ Pre-association Discovery Stephen McCannSC WNG Wireless Next Generation Clint ChaplinSC ARC Architecture Dave BagbySC JTC1 ISO/IEC/JTC1/SC6 shadow committee Andrew MylesSC REG Regulatory Richard Kennedy
doc.: IEEE 802.11-13/0214r1
Report Slide 7
802.11 WG Editor’s Meeting (Mar ‘13)
Date: 2013-03-10
Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,
MS SJ-14-4, San Jose, CA 95134-1706
+1-408-527-0815 [email protected]
Authors:
Adrian Stephe
ns, Intel
Corporation
from slide 1/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Slide 8
Volunteer Editor Contacts• TGmc – Adrian Stephens – [email protected]• TGac – Robert Stacey – [email protected] • TGaf – Peter Ecclesine – [email protected] • TGah – Minyoung Park – [email protected]• TGai – Lee Armstrong– [email protected], Ping FANG [email protected]• TGaq – Dan Gal – [email protected]
• Editors Emeritus:– TGaa – Alex Ashley – [email protected]– TGad – Carlos Cordeiro – [email protected] – TGae – Henry Ptasinski – [email protected]
Adrian Stephe
ns, Intel
Corporation
March 2013
from slide 2/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
802.11 Style Guide• See 11-09-1034-07-0000-wg11-style-guide.doc
– We updated 802.11 WG Style Guide based on 2012 IEEE Standards Style Manual and consistency changes in final publication of the 802.11 standard
• Editor’s responsibility includes checking the 2012 IEEE Standards Style Manual when creating or updating drafts. https://development.standards.ieee.org/myproject/Public/mytools/draft/styleman.pdf
• Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual
• Note that the Style Guide evolves with our practice
Slide 9 Adrian Stephe
ns, Intel
Corporation
from slide 3/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Slide 10
Editor Amendment Ordering
Amendment Number Task Group REVCOM Date802.11-2011 Amendment 1 TGae Mar 2012
802.11-2011 Amendment 2 TGaa Jun 2012
802.11-2011 Amendment 3 TGad Oct 2012
802.11-2011 Amendment 4 TGac Feb 2014
802.11-2011 Amendment 5 TGaf Jun 2014
802.11-2011 Amendment 6 TGah Jan 2016
802.11-2011 Amendment 7 TGai Feb 2015
• Data as of Mar 2013• See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm
Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!
Adrian Stephe
ns, Intel
Corporation
from slide 4/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Most current
doc shaded green.
TG Published or Draft Baseline DocumentsSource MEC
Style Guide Editor
Snapshot Date
Publishe
d
ac af ah ai mc aj aq
ac Y 5.0 Frame 10.0
Yes 2012 Robert Stacey 19-Mar
af Y 5.0 3.0 Frame 10.0
No 2012 Peter Ecclesine 21-Mar
ah Y 3.0 2.0 0.0 Frame10.0
No 2012 Minyoung Park 13-Nov
ai Y 4.0 2.2 0.0 0.4 Frame 9.0
No 2012 Lee ArmstrongPing FANG
19-Mar
mc Y 1.2 Frame 10.0
No 2012 Adrian Stephens 19-Mar
aj Y
aq Y
Changes from last report shown in red.
Slide 11
Mar 2013 Draft Development Snapshot
Slide 11 Adrian Stephe
ns, Intel
Corporation
March 2013
from slide 5/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
MIB style, Visio and Frame practices
• I’m going to suggest going forward we use a single style with appropriately set tabs, and use leading Tabs to distinguish the syntax and description parts. (Adrian Stephens Feb 9, 2010)
• Keep embedded figures using visio as long as possible– Near the end of sponsor ballot, turn these all into .wmf (windows
meta file) format files (you can do this from visio using “save as”). Keep separate files for the .vsd source and the .wmf file that is linked to from frame.
• Frame templates for 11aa, 11ac, 11af • Text version of MIB is available (2012, ae2012, aa2012,
ad2012)Adrian Stephe
ns, Intel
Corporation
Slide 12from slide 6/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 13
March 2013 PublicityDate: 2013-03-21
Name Company Address Phone email
Stephen McCann Research in Motion (RIM) UK Ltd
200 Bath Road, Slough, Berkshire, SL1 3XE, UK
+44 1753 667099 [email protected]
Authors:
from slide 1/2 of 11-13/0386r0 by Stephen McCann, RIM
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 14
• HEW Press Release– Draft press release regarding the creation of a new
High Efficiency WLAN (HEW) study group, based on the WNG SC presentations from Tuesday evening.
• Mentor Copy– https://
mentor.ieee.org/802.11/dcn/13/11-13-0385-00-0000-high-efficiency-wlan-press-release.doc
from slide 2/2 of 11-13/0386r0 by Stephen McCann, RIM
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 15
Closing ReportDate: 2013-03-22
Authors:
Name Company Address Phone email
Jim Lansford CSR Technology 100 Stirrup Cir, Florissant, Colorado 80816
+1-719-286-9277 [email protected]
from slide 1/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 16
Abstract
Closing report for WNG SC for March 2013, Orlando, Florida, USA
from slide 2/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 17
• Presentations at March 2013 meeting– Agenda:
https://mentor.ieee.org/802.11/dcn/13/11-13-0340-02-0wng-agenda-for-march-2013.ppt
• Tuesday AM1 session– https://mentor.ieee.org/802.11/dcn/13/11-13-0323-02-00ai-tgai-experimental-test-report-o
f-fils.pptx – Hiroshi MANO
– https://mentor.ieee.org/802.11/dcn/13/11-13-0314-00-0wng-on-future-enhancements-to-802-11-technology.pptx - Juho PIRSKANEN
• Tuesday PM3 (evening) session– https://mentor.ieee.org/802.11/dcn/13/11-13-0313-00-0wng-usage-models-for-next-genera
tion-wi-fi.pptx - Osama ABOUL-MAGD
– https://mentor.ieee.org/802.11/dcn/13/11-13-0343-00-0wng-operator-oriented-wi-fi.pptx – LIU Dapeng
– https://mentor.ieee.org/802.11/dcn/13/11-13-0309-00-0wng-next-gen-wlan.pptx – Ron PORAT
– https://mentor.ieee.org/802.11/dcn/13/11-13-0287-03-0wng-beyond-802-11ac-a-very-high-capacity-wlan.pptx - Yasuhiko INOUE
– https://mentor.ieee.org/802.11/dcn/13/11-13-0331-05-0wng-high-efficiency-wifi.ppt – Laurent CARIOU
– https://mentor.ieee.org/802.11/dcn/13/11-13-0339-10-0wng-high-efficiency-wlan-straw-poll.ppt - Laurent CARIOU from slide 3/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
• Straw poll during PM3 to indicate support for creation of a “High Efficiency WLAN” study group– Vote was (Y/N/A): 128/1/27
• Attendance– AM1: ~126– PM3: ~165
• Minutes– https://mentor.ieee.org/802.11/dcn/13/11-13-0352-00-0wng-wng-meeting
-minutes-orlando-mar2013.doc
• Plans for May 2013– One 2-hour session
Adrian Stephens, Intel CorporationSlide 18from slide 4/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 19
ARC Closing Report Date: 2013-03-20
Name Affiliations Address Phone email Mark Hamilton Spectralink 1765 W 121st Ave,
Westminster, CO, 80234
720-872-7445 [email protected]
Authors:
from slide 1/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Abstract
This document is the closing report for ARC SC,
March 2013, Orlando meeting
Adrian Stephens, Intel CorporationSlide 20from slide 2/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 21
Work Completed• IETF/802 coordination
– Reviewed RFC 4441 update. Trying to balance between redundant with CBPs versus enough information here.
– Still open for comments – please get comments to Dorothy Stanley– Also, Operations Area working group has gotten submissions on
CAPWAP, and will be considering.• Brief update on General Links (GLK SC) and 802.1
bridging discussions– Most presentations will be in Thursday AM1 joint session– Looks like changes are needed in 802.1AC, which will need a PAR
• 802 Overview and Architecture Draft 1.6 sponsor ballot– Ballot deadline extended to Mar 22. Some comments addressed this
week, more on telecons. – Reviewed 802.11 section (Annex B.2) and comments submitted.
Noted that PLCP/PMD split is being removed from 802.11, so need to describe potential changes in our architecture pictures
from slide 3/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 22
Work Completed (cont)• Architecture of APs/DS/Portals, and 802.1 concepts
– Reviewed submission: https://mentor.ieee.org/802.11/dcn/13/11-13-0115-03-0arc-considerations-on-ap-architectural-models.doc
– Agreed 802.11 Figure 5-1 (MAC data plane architecture) has issues and confusing parts. Started work toward a proposed replacement.
– Need to get clarification on all (architectural) interface points within 802.11 specification – all MAC-SAPs (are there more than one?), etc.
Minutes are in 11-13/0367r0
Teleconferences:– None expected, if needed, will schedule with 10 days notice
from slide 4/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 23
March 2013 Goals
• One meeting slot planned:– Continue discussion on architectural model for AP
(and DS and Portal) and where MAC-SAP interface(s) appear, and how this relates to the 802.1 concepts
– 802 O&A sponsor ballot, as appropriate– IETF/802 RFC 4441, as appropriate
from slide 5/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 24
IEEE 802 JTC1 SC closing report (Mar13)Date: 2013-3-22
Name Company email
Andrew Myles Cisco [email protected]
Authors:
from slide 1/15 of 11-13/0383r0 by Andrew Myles, Cisco
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 25
Abstract
Closing report for IEEE 802 JTC1 SCfor March13 in Orlando
from slide 2/15 of 11-13/0383r0 by Andrew Myles, Cisco
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel Corporation
JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting
• Reviewed latest liaisons to SC6– 802.11ac D5.0 liaised– Responses to comments on 802.11-2012 liaised
• Reviewed status of PSDO activity– Pre-ballots in SC6 on 802.1X & 802.1AE passed
• 5 month ballot delayed until comments resolved• 11-13-336r5 on 802.1X, 11-13- 337r4 on 802.1AE will be considered
by EC– Pre-ballots in SC6 on 802.11aa/ad/ae are still open
• Close on 7 April– 802.3 WG will submit 802.3-2012 under PSDO– 802.1 WG will submit 802.1AS, 802.1AB, 802.1AR under PSDO
Slide 26from slide 3/15 of 11-13/0383r0 by Andrew Myles, Cisco
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel Corporation
JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting
• Reviewed status of various China NB proposals in SC6– No known changes to status for :
• WAPI• TEPA-AC • TLSec• TAAA
– IETF are now tracking TISec and may send representative to next SC6 meeting
– Nufront will present on EUHT and coexistence with 802.11 in March in Hawaii; possibly in SC?
Slide 27from slide 4/15 of 11-13/0383r0 by Andrew Myles, Cisco
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel Corporation
JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting
• Prepared for next SC6 meeting in June in Korea– Reviewed agenda– Empowered Bruce Kraemer as HoD– Completed contribution process for SC6 NBs to “participate” in
development & maintenance of 802 standards• 11-13-1454r8 will be will be considered by EC • Also discussed in 802.1 WG & 802.3 WG
– Discussed a Swiss NB “explanatory report” on the SC6 resolutions from Graz• Further discussion and any action will occur in Hawaii
– Discussed a response to Swiss NB comparison of 802.1X and TEPA-AC• Will be completed in Hawaii
Slide 28from slide 5/15 of 11-13/0383r0 by Andrew Myles, Cisco
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel Corporation
JTC1 SC have plans for May 13 in Hawaii focused on prep for SC6 meeting
• Review status of liaisons to SC6• Review status of pre-ballots/ballots in SC6
– 802.11aa/ad/ae, 802.1X/AE/AS/AB/AR, 802.3
• Prepare for SC6 meeting in June– Review final agenda– Consider response to Swiss NB “explanatory report”– Complete response comparison of 802.1X &TEPA-AC– Update table of status of IEEE 802 contributed ISO/IEC
documents– Develop status information about 802.1/3/11 for SC6– Liaise with IETF on TISec
• Possibly host Nufront presentation on EUHTSlide 29
from slide 6/15 of 11-13/0383r0 by Andrew Myles, Cisco
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Motions for EC
Adrian Stephe
ns, Intel
Corporation
Slide 30from slide 7/15 of 11-13/0383r0 by Andrew Myles, Cisco
March 2013
doc.: IEEE 802.11-13/0214r1
Report
The SC recommends empowerment of the IEEE 802 HoD to the next SC6 meeting
• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that Bruce Kraemer be
appointed as HoD of the IEEE 802 delegation to the SC6 meeting in June 2013 and be authorised to:• Appoint the IEEE 802 delegation• Approve any necessary submissions• Call any necessary preparation teleconferences
– Result: 8/0/1• Abstain was Bruce Kraemer
Adrian Stephens, Intel
Corporation
Slide 31from slide 8/15 of 11-13/0383r0 by Mar 2013
March 2013
doc.: IEEE 802.11-13/0214r1
Report
The SC recommends empowerment of the IEEE 802 HoD to the next SC6 meeting
• Motion for consideration by IEEE 802 EC– The IEEE 802 SC appoints Bruce Kraemer as HoD of the IEEE
802 delegation to the SC6 meeting in June 2013 and authorises Mr Kraemer to:• Appoint the IEEE 802 delegation• Approve any necessary submissions• Call any necessary preparation teleconferences
– Moved:– Seconded:– Result:
Adrian Stephens, Intel
Corporation
Slide 32from slide 9/15 of 11-13/0383r0 by Mar 2013
March 2013
doc.: IEEE 802.11-13/0214r1
Report
The SC recommends a response to SC6’s requests for collaboration
• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that 11-13-1454r8 be
approved as a response to the ISO/IEC JTC1/SC6 requests that IEEE 802:• Establish a mechanism that allows SC6 NBs to contribute to the
revision process in IEEE 802.1/3/11• Exchange information with SC6 about new work items that are within
the scope of SC6 and the respective IEEE 802 WG for information and potential coordination
– Result: 9/0/0
Adrian Stephens, Intel
Corporation
Slide 33from slide 10/15 of 11-13/0383r0 by Mar 2013
March 2013
doc.: IEEE 802.11-13/0214r1
Report
The SC recommends a response to SC6’s requests for collaboration
• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves 11-13-1454r8 as a response to the
ISO/IEC JTC1/SC6 requests that IEEE 802:• Establish a mechanism that allows SC6 NBs to contribute to the
revision process in IEEE 802.1/3/11• Exchange information with SC6 about new work items that are within
the scope of SC6 and the respective IEEE 802 WG for information and potential coordination
– Moved:– Seconded:– Result:
Adrian Stephens, Intel
Corporation
Slide 34from slide 11/15 of 11-13/0383r0 by Mar 2013
March 2013
doc.: IEEE 802.11-13/0214r1
Report
The SC recommends approving the responses related to the 802.1X pre-ballot
• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that the responses in
11-13-336r5 to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1X under the PSDO process be approved and liaised to ISO/IEC JTC1/SC6
– Result: 9/0/0
Adrian Stephens, Intel
Corporation
Slide 35from slide 12/15 of 11-13/0383r0 by Mar 2013
March 2013
doc.: IEEE 802.11-13/0214r1
Report
The SC recommends approving the responses related to the 802.1X pre-ballot
• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves the responses in 11-13-336r5 to the
comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1X approves their liaising to ISO/IEC JTC1/SC6
– Moved:– Seconded:– Result:
Adrian Stephens, Intel
Corporation
Slide 36from slide 13/15 of 11-13/0383r0 by Mar 2013
March 2013
doc.: IEEE 802.11-13/0214r1
Report
The SC recommends approving the responses related to the 802.1AE pre-ballot
• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that the responses in
11-13-337r4 to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1AE under the PSDO process be approved and liaised to ISO/IEC JTC1/SC6
– Result: 9/0/0
Adrian Stephens, Intel
Corporation
Slide 37from slide 14/15 of 11-13/0383r0 by Mar 2013
March 2013
doc.: IEEE 802.11-13/0214r1
Report
The SC recommends approving the responses related to the 802.1AE pre-ballot
• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves the responses in 11-13-337r4 to the
comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1AE approves their liaising to ISO/IEC JTC1/SC6
– Moved:– Seconded:– Result:
Adrian Stephens, Intel
Corporation
Slide 38from slide 15/15 of 11-13/0383r0 by Mar 2013
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 39
IEEE 802.11 Regulatory SCOrlando Closing Report
Date: 2013-03-22
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Authors:
from slide 1/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 40
Abstract
This presentation is the closing report for the March 2013 IEEE 802.11 Regulatory Standing Committee meeting in Orlando.
from slide 2/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Agenda
• The regulatory summaries• Action items and issues• WP5A liaison from IEEE 802 on 5 GHz • The NPRM FCC 13-22• Transmit beamforming antenna gain presentations• Adjourn
Adrian Stephe
ns, Intel
Corporation
Slide 41from slide 3/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Accomplishments
• Approved Vancouver meeting and teleconference minutes• Heard regulatory update summaries for North America, the EU
and Asia• Approved a liaison to ITU-R WP5A on expansion of the 5 GHz
spectrum• Heard two presentations on transmit beamforming antenna gain
(relating to a TCB test document for multiple antennas)• Developed and approved a framework document for the
development of Comments for NPRM FCC 13-22 (proceeding 13-49)
• Planned for teleconferences– Thursdays, at 12:30ET for 90 minutes (starting April 4th)
Adrian Stephe
ns, Intel
Corporation
Slide 42from slide 4/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Teleconferences
• Weekly on Thursdays, 12:30 to 14:00 ET– Starting April 4th
Adrian Stephe
ns, Intel
Corporation
Slide 43from slide 5/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
References
• NPRM FCC 12-118• NPRM FCC 12-148• NPRM FCC 13-22• FCC request for comment on WRC-15• FCC authorization of TVWS databases nationwide• Early draft of EN301 598 (v0.0.16)• Technical feasibility of IMT in the bands above 6 GHz• RECOMMENDATION ITU-R F.1763• RECOMMENDATION ITU-R M.1651• WP5A liaison re M.1651• IEEE 802.11 liaison to ITU-R WP5A on expansion of the 5 GHz band• Industry outline for NPRM FCC 13-22 response• NPRM FCC 13-22 Dissected• FCC 13-22 Comment Framework• Transmit Beamforming Antenna Gain• Beamfoming Array Gain to Intended and Unintended Users
Slide 44 Adrian Stephe
ns, Intel
Corporation
from slide 6/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 45
IEEE 802.11mc Closing Report forMarch 2013Date: 2013-03-21
Name Affiliations Address Phone email Dorothy Stanley
Aruba Networks 1322 Crossman Ave Sunnyvale, CA 94089
+1 630-363-1389
Authors:
from slide 1/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 46
Abstract
This document contains the TGmc closing report for March 2013.
from slide 2/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Status: comment resolution
• Continued processing comments received in the recent Initial Letter Ballot– 801 comments (713 LB, 88 remaining 2012 Call for comments)– Approved resolutions to approximately 350 comments
Adrian Stephe
ns, Intel
Corporation
Slide 47from slide 3/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 48Slide 48
TGmc Plan of Record• 20 July 2012 – 12 Sept 2012 – Call for Comment/Input• 29-30 Aug 2012 – NesCom, SASB PAR Approval• Sept 2012 – Begin to process input • Sept 2012 – 11aa, 11ae integration• Jan – First WG Letter ballot - without 11ad• Dec 2012 – March/May 2013 – 11ad integration – May/July ballot
on D2.0• Dec 2013 – March 2014 – 11ac integration• Feb 2014 – Mandatory Draft Review• Feb-March 2014 – Form Sponsor Pool (45 days) • April/May 2014 – Initial Sponsor Ballot • TBD – integration of additional completed amendments (e.g. 11af)• Nov 2014 – WG/EC Final Approval• March 2015 – RevCom/SASB Approval
from slide 4/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Teleconferences
• Conference Calls 10am Eastern (2 hours) – April 5, 12, 19, 26 (Friday)
Adrian Stephe
ns, Intel
Corporation
Slide 49from slide 5/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Next Steps
• Continued Comment Resolution• Recirculation Letter ballot (expect July)
Adrian Stephe
ns, Intel
Corporation
Slide 50from slide 6/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 51
TGac March 2013 Closing ReportDate: 2013-03-20
Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive,
Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw
ei.com
Authors:
from slide 1/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 52
Abstract
This document is the closing report for the TGac for the March 2013 session.
from slide 2/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Work Completed • Approved resolutions to comments received on draft
D5.0 (LB 191).– Comment spreadsheet is available at:
https://mentor.ieee.org/802.11/dcn/13/11-13-0199-03-00ac-lb191-comments-tgac-d5-0.xls
• A motion passed to start a 15-day recirculation ballot on draft D5.0.
• Reviewed and approved the report to the IEEE 802 EC requesting conditional approval for Sponsor ballot.– https://mentor.ieee.org/802.11/dcn/13/11-13-0320-01-00ac-p8
02-11ac-report-to-ec-on-conditional-approval-to-go-to-sponsor-ballot.pptx Adrian
Stephens,
Intel Corpor
ation
Slide 53from slide 3/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Next Ad Hoc Meeting
• None scheduled for May 2013.• A motion passed to authorize an ad hoc meeting in July
2013, somewhere in Europe.
Adrian Stephe
ns, Intel
Corporation
Slide 54from slide 4/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 55
May 2013 Goals
• Start working on Sponsor Ballot comment resolution
from slide 5/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 56
Conference Call Times
• Previously Approved– March 28 - 20:00 - 22:00 ET– April 4 - 10:00 - 12:00 ET
– Not needed since the dates coincide with ballots
• May 09 – 20:00 – 22:00 ET• May 23 - 10:00 – 12:00 ET• May 30 - 20:00 – 22:00 ET
from slide 6/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 57
TGaf Orlando Closing Report
Date: 2013-03-22
Name Affiliations Address Phone email Rich Kennedy BlackBerry 7305 Napier Trail
Austin, TX 78729 +1-972-207-3554 rikennedy@blackberr
y.com
Peter Ecclesine Cisco 170 W. Tasman Dr., San Jose, CA, 95134
+1-408-527-0815 [email protected]
Authors:
from slide 1/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 58
AbstractThis presentation is the closing report for the 19th face-to-
face meeting of IEEE 802.11 TGaf, taking place the week of January 14th, 2013 at the IEEE 802 Wireless Interim in Vancouver.
from slide 2/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Plan for the Week
• Approve meeting and teleconference minutes• Regulatory update• Review the results of LB192• Review of the progress since January• Editorial review; spreadsheet 11-12/1017r35• Review and Approve all comment resolution submissions• Update the draft and comment resolution spreadsheet with
approved changes, and request a recirculation letter ballot• Plan for May meeting and teleconferences
Adrian Stephe
ns, Intel
Corporation
Slide 59from slide 3/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
TGaf Accomplishments • Reviewed the comment spreadsheet and resolved all of
the remaining comments from LB192• Requested the Editor to prepare D4.0 and the asked
WG to start a recirculation letter ballot• Planned for May meeting, and weekly teleconferences
– Tuesdays at 21:00 ET for 2 hours
Adrian Stephe
ns, Intel
Corporation
Slide 60from slide 4/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Plan for May
• Approve Orlando and Teleconference minutes• Review and resolve comments from the recirculation
letter ballot on Draft 4.0• Ask the WG for a recirculation letter ballot• Prepare PAR extension request• Plan for July and Teleconferences, and begin the
process of starting the first TGaf Sponsor ballot
Adrian Stephe
ns, Intel
Corporation
Slide 61from slide 5/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 62
TGaf Timeline – Affirmed March 2013
• Initial Working Group Letter Ballot: January 2011• Second Working Group Letter Ballot: July 2012• Recirculation Letter Ballot: January 2013• Form Sponsor Ballot Pool: June 2013• Initial Sponsor Ballot: July 2013• Recirculate Sponsor Ballot: November 2013• Final WG/EC Approval: March 2014• RevCom/Standards Board Approval: June 2014
from slide 6/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Teleconferences
• Weekly on Tuesdays through May 28th
– Until recirc is complete, calls will be used for regulatory updates as required
• Time: 21:00 ET for up to 2 hours
Adrian Stephe
ns, Intel
Corporation
Slide 63from slide 7/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Motion
• Having approved comment resolutions for all of the comments received from LB192 on TGaf D3.0 as contained in document 11-12/1017r37
• Instruct the editor to prepare Draft 4.0 incorporating these resolutions and,
• Approve a 15 day Working Group Recirculation Ballot, asking the question “Should P802.11af D3.0 be forwarded to Sponsor Ballot?”
• Moved by Rich Kennedy on behalf of TGaf• Second:• Discussion?• Results:
• TGaf vote: • Moved: Al Petrick Seconded: Tevfik Yucek Result: 14-0-0
Adrian Stephe
ns, Intel
Corporation
Slide 64from slide 8/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 65
IEEE 802.11ah Closing Report forMarch 2013
Date: 2013-3-20
Name Affiliations Address Phone email David Halasz Self 330-283-2715 [email protected]
Authors:
from slide 1/5 of 11-13/0359r0 by David Halasz
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Activity in TGah
• Work continued on specification framework– Update to the spec framework adopted– 11-11-1137-14-00ah-specification-framework-for-tgah.docx
• Timeline move out two months– Draft text not available beyond 12/1257. Hence internal task group
letter ballot move out to May of 2013.
Adrian Stephe
ns, Intel
Corporation
Slide 66from slide 2/5 of 11-13/0359r0 by David Halasz
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Going forward
• Wrap up on specification framework• Move forward with draft text.• Start internal task group letter ballot
Adrian Stephe
ns, Intel
Corporation
Slide 67from slide 3/5 of 11-13/0359r0 by David Halasz
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Teleconference
• May 8 at 10 AM ET 1 hour– Prepare for May face-to-face meeting
Adrian Stephe
ns, Intel
Corporation
Slide 68from slide 4/5 of 11-13/0359r0 by David Halasz
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Timeline – Move out two months
• Current– Internal Task Group Ballot : May 2013– Initial Letter Ballot : September 2013– Initial Sponsor Ballot : March 2015– EC Approval : January 2016– Revcom Approval : March 2016
Adrian Stephe
ns, Intel
Corporation
Slide 69from slide 5/5 of 11-13/0359r0 by David Halasz
March 2013
doc.: IEEE 802.11-13/0214r1
Report
IEEE 802.11TGaiClosing Report
Date: 2013-3-21
Authors:
Name Company Address Phone email
Hiroshi MANO AlliedtelesisR&D center,K.K.
8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN
+81-3-5719-7630 [email protected]
March 2013
Slide 70 Adrian Stephe
ns, Intel
Corporation
from slide 1/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
AbstractThis presentation is the closing report for the Orlando
meeting of the IEEE 802.11 TGai.
March 2013
Slide 71 Adrian Stephe
ns, Intel
Corporation
from slide 2/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
IEEE 802.11 FILS TGai – Orland March 2013
• Goals for the Meeting:– Approve minutes of past meeting and teleconference– Comment resolution to volunteer review comments– Approve final technical contribution – Move to forward TGai call for comment – Joint meeting with TGaq– Approve Timeline– Approve Teleconference schedule– Approve Plan for May
March 2013
Slide 72 Adrian Stephe
ns, Intel
Corporation
from slide 3/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Accomplishments TGai 1/2
• Review and approve January 2013 Vancouver Session Minutes– https://mentor.ieee.org/802.11/dcn/13/11-13-0182-01-00ai-
january-2013-vancouver-session-minutes.doc
• Review and approve January-March Teleconference Minutes – https://mentor.ieee.org/802.11/dcn/13/11-13-0191-04-00ai-
january-march-teleconference-minutes.doc
March 2013
Slide 73 Adrian Stephe
ns, Intel
Corporation
from slide 4/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Accomplishments TGai 2/2
• 8 regular slots and 1 Joint adhoc with TGaq were held.• Experimental-test-report-of-FILS was reported on
adhoc.• 63 unsolved open technical before this session.• All comments were resolved.• 21 Technical motions ( 20 passed/ 1 failed)• Instructed editor to prepare draft 0.5 and
incorporating these resolutions and, approve 20 day peer review starting on/or after April 8th , 2013 to assist with producing an improved draft for working LB.
March 2013
Slide 74 Adrian Stephe
ns, Intel
Corporation
from slide 5/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Plan for May
• Goals for the Meeting:
– Approve minutes of past meeting and teleconference– Comment resolution of Task Group review of TGai
draft.– Approve Timeline– Approve Teleconference schedule– Approve Plan for July
March 2013
Slide 75 Adrian Stephe
ns, Intel
Corporation
from slide 6/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Time line of TGai (no change)
PAR Approved, Modified, or Extended 2010-12-08– WG Letter Ballots Initial / Recirc Jul 13/ Nov13– Form Sponsor Ballot Pool / Reform Mar14– MEC Done Mar 14– IEEE-SA Sponsor Ballots Initial / Recirc Jul14/ Sep14
– Final 802.11 WG Approval Nov14– final or Conditional 802 EC Approval Nov14– RevCom & Standards Board Final or
Continuous Process Approval Feb15– ANSI Approved N/A
March 2013
Slide 76 Adrian Stephe
ns, Intel
Corporation
from slide 7/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Teleconference Schedule • Motion:
– Approve the following schedule of weekly teleconferences. – Tuesdays 10:00 ET from 26th March 2013 until 21st May 2013.– Duration 1Hour– Using WEB-EX that will be provided by Task Group Chair
• Approved by unanimous consent
March 2013
Slide 77 Adrian Stephe
ns, Intel
Corporation
from slide 8/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel Corporation
Reference • Agenda /13-0321r2
– https://mentor.ieee.org/802.11/dcn/13/11-13-0321-02-00ai-tgai-agenda-march-2013-orland.pptx
• Submission list / 13-0322r3– https://mentor.ieee.org/802.11/dcn/13/11-13-0322-03-00ai-tgai-submissio
n-list-orlando.xls
• Motions / 13-0341r1– https://mentor.ieee.org/802.11/dcn/13/11-13-0341-00-00ai-tgai-motion-str
aw-poll-march-2013-orlando.pptx
• TGai Draft Review Combined Comments 13-0036r14– https://mentor.ieee.org/802.11/dcn/13/11-13-0036-14-00ai-tgai-draft-revie
w-combined-comments.xls
• Experimental-test-report-of-FILS /13-0323r2– https://mentor.ieee.org/802.11/dcn/13/11-13-0323-02-00ai-tgai-experimen
tal-test-report-of-fils.pptx
March 2013
Slide 78from slide 9/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Thanks to all who participated!
March 2013
Slide 79 Adrian Stephe
ns, Intel
Corporation
from slide 10/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 80
Date: 2013-03-21
Name Company Address Phone email Eldad Perahia Intel
Corporation
2111 NE 25th Ave Hillsboro, OR 97124
503-712-8081 [email protected]
Authors:
TGaj March 2013 Closing Report
March 2013
from slide 1/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Work Completed
• Task Group documents reviewed: – Usage model, 12/1245r2, Jiamin Chen
• Submissions– 13/292r0, Backward compatibility of 11aj with 11ad, Carlos
Cordeiro– 13/0177r1, Proposal of RoF Extension Link Backhaul for
Category 4, Hiroyo Ogawa
Adrian Stephe
ns, Intel
Corporation
Slide 81
March 2013
from slide 2/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Goals for April
• Target to approve TG Usage model, Functional Requirement, Evaluation Methodology, Selection Procedure baseline document
• Continue to develop channel model for 45GHz
Adrian Stephe
ns, Intel
Corporation
Slide 82
March 2013
from slide 3/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation
March 2013
doc.: IEEE 802.11-13/0214r1
Report
Conference call times
• April 18th 19:00-20:00 ET
Adrian Stephe
ns, Intel
Corporation
Slide 83
March 2013
from slide 4/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 84
TGak March Closing Report• Date: 2013-03-21
Authors:
Name Address Affiliations Phone Email
Donald EastlakeHuawei
Technologies
155 Beaver Street, Milford, MA 01757 USA
+1-508-333-2270 [email protected]
from slide 1/5 of 11-13/0374r0 by Donald Eastlake, Huawei
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 85
Abstract
• Closing Report of IEEE 802.11 Task Group AK at the 802.11 Working Group Meeting, March 2013, in Orlando, Florida.
from slide 2/5 of 11-13/0374r0 by Donald Eastlake, Huawei
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 86
TGak Closing Report
• Accomplishments• Received and discussed 4 submissions (see list next
page)• Met jointly with 802.1 Thursday morning.• The minutes of this TGak meeting will be in 11-13/375
and an annotated agenda is in 11-13/0273r5.
• Teleconferences• TGak voted to hold 1 hour teleconferences on
Mondays, April 8th, April 22nd, and May 6th, at 5pm Eastern US time joint with 802.1Qbz.
from slide 3/5 of 11-13/0374r0 by Donald Eastlake, Huawei
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 87
TGak Closing Report
• Presentations• 11-13/0183r0, “Proposal of Preliminary Functional Requirements
for 802.1Qbz-802.11ak”, Mitsuru Iwaoka (Yokogawa Electric Co.)• 11-13/185r1, “Problems to be solved by 802.11ak/802.1Qbz”,
Donald Eastlake (Huawei Technologies)• 11-13/221r2, “802.11 QoS Queue Architecture and Possible
802.1bz Bridge Model”, Philippe Klein (Broadcom)• 11-13/0253r0, “Changes to 802.1Q required by 802.1Qbz”, Norm
Finn (Cisco)
from slide 4/5 of 11-13/0374r0 by Donald Eastlake, Huawei
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephens, Intel CorporationSlide 88
TGak Closing Report
• May Plans• Develop a firm list of Problems to be solved by this effort.• Develop an architectural model for 802.11ak.• Receive and discuss technical presentations• Develop process and timeline for TGak
from slide 5/5 of 11-13/0374r0 by Donald Eastlake, Huawei
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 89
TGaq Closing ReportDate: 2013-03-22
Name Company Address Phone email
Stephen McCann Research in Motion (RIM) UK Ltd
200 Bath Road, Slough, Berkshire, SL1 3XE, UK
+44 1753 667099 [email protected]
Authors:
from slide 1/3 of 11-13/0370r1 by Stephen McCann, RIM
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 90
Abstract
Closing report for TGaq (Pre-Association Discovery) for March 2013, Orlando, FL,
USA
from slide 2/3 of 11-13/0370r1 by Stephen McCann, RIM
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 91
• Summary– Use case
• 11-13-0125-04-00aq-use-case-analysis.docx• Use case collection now closed
– Requirements and terminology documents• 11-13-0299-00-00aq-draft-tgaq-terminology.docx
– Initial protocol design discussion• 11-13-0057-02-00aq-design-options.ppt
– Detailed scoping discussion– Teleconference : Monday 22nd April 10:00 ET
• Plans for May 2013– Initial technical presentations
from slide 3/3 of 11-13/0370r1 by Stephen McCann, RIM
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Adrian Stephens, Intel CorporationSlide 92
802.15 Liaison ReportDate: 2013-03-22
Name Affiliations Address Phone email Al Petrick Jones-Petrick
and Associates 12201 Treetop Ct. Orlando, Florida
+1-321-235-3269 [email protected]
Authors:
from slide 1/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 93
Abstract
Liaison report on 802.15 as presented to 802.11
Adrian Stephens, Intel Corporationfrom slide 2/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 94Slide 94
802.15.4kLow Energy Critical Infrastructure Monitoring
(LECIM)• Resolved Sponsor Ballot letter ballot comments• Issue recirculation Sponsor Ballot• Seek conditional approval by EC to forward RevCom
Adrian Stephens, Intel Corporationfrom slide 3/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 95Slide 95
802.15.4mTV White Space
• LB #87 passed with 88% of Approval in March 2013– Voting Results (Yes 83, No 11, Abstain 3)
• Resolved 551 Comments (Editorial 302, Technical & General 249)– Resolved all Technical, Editorial and General comments
• FSK, OFDM, NB-OFDM, Ranging, General PHY, and Coexistence Assurance
• 2 re-circulation letter ballots planned between March 2013 and May 2013
• Appointed BRC to resolved comments from re-circulation letter ballots
Adrian Stephens, Intel Corporationfrom slide 4/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 96Slide 96
802.15.4nChinese Medical Band
• Heard updated Proposals Presentations– O-QPSK– FSK– Ranging
• Reviewed and updated the TG4n web page• Will continue call for proposals
Adrian Stephens, Intel Corporationfrom slide 5/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 97Slide 97
802.15.4pPositive Train Control
• Continued to flush out combined contribution to reflect the technical proposals presented
• Completed Coexistence Document (15-13-0212-01)• Completed draft d1P802-15-4p_Draft_Standard.pdf• Issue WG letter ballot after close of March 2013
session
Adrian Stephens, Intel Corporationfrom slide 6/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 98Slide 98
802.15.4qUltra Low Power
• Second meeting as a Task Group• Began work on technical guidance and channel
modeling framework • Worked on applications • Released call for contributions to application, TGD
and channel modeling efforts• Heard FSK and PPM PHY related technical
presentations
Adrian Stephens, Intel Corporationfrom slide 7/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 99Slide 99
802.15.8 Peer Aware Communications
Adrian Stephens, Intel Corporationfrom slide 8/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 100Slide 100
802.15.9 Key Management Protocol
Adrian Stephens, Intel Corporationfrom slide 9/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 101Slide 101
Layer 2/Mesh Under Routing (L2R) SG• Completed Preliminary Draft PAR and 5c
• Preliminary Draft PAR - doc.#15-13-0231-00• Preliminary Draft 5c - doc. #15-13-0232-00
• Finalize PAR and 5c in May 2013
Adrian Stephens, Intel Corporationfrom slide 10/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 102Slide 102
Better Use of Spectrum Resources in WPANs (SRU) IG
• Heard and discussed two presentations– IG SRU will focus on Radio resource measurement and management
(RRMM) for drafting PAR and 5C in May 2013.
Adrian Stephens, Intel Corporationfrom slide 11/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 103Slide 103
THz IG• Heard 5 technical presentations
– MAC layer, Optical interconnects, Study Group formation, Propagation Aspects of Terahertz Outdoor Fixed Wireless Links.
• Update of the Technical Expectations Document (11/0745r7)• Discussed spinning-off a Study Group on “Beam switchable
wireless point-to-point 40/100 Gbps links”• Next meeting in July 2013
Adrian Stephens, Intel Corporationfrom slide 12/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 104Slide 104
WNG SC
• Review two (2) technical presentations– Launching a SG on THz by Thomas Kürner (15-
13-0139-01)– Review and Amendment of IEEE802.15.6 BAN
to Focus on Dependable Wireless BAN of Things by Prof Ryuji Kohno (15-12-0192-01)
Adrian Stephens, Intel Corporationfrom slide 13/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 105Slide 105
Maintenance SC
• Reviewed document (doc 15-13-0194-01) “802.15.4 use by external SDOs”
• The IEEE 802.15 Work Group (WG) is in the process of considering a number of significant changes to the 802.15.4 standard, Low-Rate Wireless Personal Area Networks (LR-WPANs), and is soliciting input from all Standard Development Organizations (SDOs), businesses, and individuals that would be impacted by these changes. The changes are described in his presentation and summarized here:
1. Using a Frame Type ID value as an extension to indicate following bits are new Frame types
2. Restructuring Information Element IDs to allow IDs to be assigned to external SDOs
3. Changing the order of the Information Element length and type fields.
Adrian Stephens, Intel Corporationfrom slide 14/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report
March 2013
Slide 106Slide 106
References
• This document• All Documents
– https://mentor.ieee.org/802.15/documents• Current draft is in the members-only area
– http://www.ieee802.org/15 Members_Only_Area
– 802.11 members log in using 802.11 username and password
Adrian Stephens, Intel Corporationfrom slide 15/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 107
RR-TAG (802.18) to 802.11 Liaison Report
Date: 2013-03-22
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Authors:
from slide 1/5 of 11-13/0376r0 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 108
Abstract
This presentation is the liaison report from the RR-TAG for the March 2013 IEEE 802.11 Plenary in Orlando.
from slide 2/5 of 11-13/0376r0 by Rich Kennedy, BlackBerry
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 109
FCC Documents Reviewed and Approved by the RR-TAG
• There were no documents approved for submission to the FCC at this meeting.
• The RR-TAG expects to finalize and approve comments to the FCC 5 GHz U-NII Band Rules Revision NRPM at a teleconference meeting to be held on on Friday April 19th, at 1:00 PM ET.– Link to NPRM: 18-13/016r0
from slide 3/5 of 11-13/0376r0 by John Notor, Notor Research
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 110
ITU-R Documents from 802.16 and 802.11 REG SC
Reviewed and Approved by the RR-TAG
• The RR-TAG approved the following documents from 802.16 for EC review and submission to ITU-R WP 5D:– 18-13/034r1, Proposed LS to ITU-R WP 5D: Update toward Rec. ITU-R
M.1457-12 (Meeting X Notification) Link: 18-13/034r1
– 18-13/035r1, Proposed Cont. to ITU-R WP 5D- Update of WirelessMAN-Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+2) Link: 18-13/035r2
• The RR-TAG approved the following document from the 802.11 Regulatory Standing Committee for EC review and submission as an IEEE 802 document to ITU-R WP 5A:– 18-13/038r3, IEEE 802 Input to WP5A on 5 GHz Link: 18-13/038r3
from slide 4/5 of 11-13/0376r0 by John Notor, Notor Research
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 111
Other Documents Reviewed and Approved by the RR-TAG
• The RR-TAG approved the following document from 802.16 for EC review and submission to IETF, copy to the FCC:– 18-13/036r0, Proposed Statement to IETF LMAP on IEEE P802.16.3 Activity
Link: 18-13/036r0
• The RR-TAG approved the following document from 802.16 for EC review and submission to the Broadband Forum, copy to the FCC:– 18-13/037r1 Proposed statement to BBF: Response to liaison of 8 March on
Performance Measurements Architecture Link: 18-13/037r1
from slide 5/5 of 11-13/0376r0 by John Notor, Notor Research
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 112
Liaison Report for OmniRAN EC SGDate: 2013-03-22
Authors:
from slide 1/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 113
Abstract
This presentation contains the March 2013 IEEE 802.11 liaison report for OmniRAN EC SG.
from slide 2/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 114
Key Activities• Currently focused on defining the problem statement
and scope, leading to the creation of a PAR and 5C.• Review of feedback from presentations to IETF, IEEE
802.1, and EC.• Review OmniRAN use case proposals• Discussion with IEEE 802.21 on the scope of OmniRAN
relative to the scope of IEEE 802.21• Liaison to 3GPP to obtain clarification on some
technical aspects of SAMOG (3GPP TS 23.402)• Request for PAR extension.
from slide 3/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 115
Objectives for May• Teleconferences: April 11th, May 2nd at 9am – details on
OmniRAN SG website• Incorporate proposed use cases into an OmniRAN use
case document• Develop PAR submission documents – Target PAR
submission on Jun 15
from slide 4/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion
March 2013
doc.: IEEE 802.11-13/0214r1
Report Adrian Stephe
ns, Intel
Corporation
Slide 116
References
• OmniRAN website– http://www.ieee802.org/OmniRANsg/
• Document repository for OmniRAN:– https://mentor.ieee.org/omniran/documents
• Link to March 2013 OmniRAN Agenda:– https://mentor.ieee.org/omniran/dcn/13/omniran-13-0014-03-
ecsg-march-2013-orlando-agenda.pptx
from slide 5/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion
March 2013