DEVELOPING THERMAL INSULATION CURRICULUM
ACCORDING TO THE CLIMATE CONDITIONS AND
PILOT PROVINCIAL APPLICATIONS
Responsibilities in the First Six Months of Sakarya University
Sakarya University - RESPONSIBILITIES STATUS
Drawing of Building Projects OK.
The Investigation and provide the Insulation Materials OK.
Building Construction OK.
Practice and Sharing of Insulation Materials OK.
Perform the Measurement Instruments (Thermal Camera, Plaster Machine and Tablet PC) Purchases
OK.
Preparing the Table of Measurement OK.
First Six Months reports OK.
Working Meetings in the First 6 Months
8 Meetings and
Results
Meeting with Representatives of the insulation companies
Drawing of Building Project
AB
Reinforced Concrete Slab (10 cm)
reinforced concrete foundation (30 cm)
+2.1 m
±0 m
+1.80
+2.1
0.00
General Layout of Insulation Structure
AB
LEFT SIDE
Reinforced Concrete Slab (10 cm)
+2.1 m
±0 m
+1.80
+2.1
0.00
- R.Concrete- No Insulation
- R. Concrete- XPS (4 cm)
- R. Concrete- EPS (4 cm)
- R. Concrete- Taş Y. (4 cm)
- Brick- No Insulation
- Brick- XPS (4 cm)
- Brick- EPS (4 cm)
- Brick- Taş Y. (4 cm)
- Gas Concrete- No Insulation
- Gas Concrete- XPS (4 cm)
- Gas Concrete- EPS (4 cm)
- Gas Concrete- Taş Y. (4 cm)
- Pumice- No Insulation
- Pumice- XPS (4 cm)
- Pumice- EPS (4 cm)
- Pumice- Taş Y. (4 cm)i. plaster i. plaster i. plaster i. plaster
Project Materials and Application List
Concrete C 20 Ready Mıxed Concrete
Insulation Plaster
2,5 cm
Stell ST420 XPS 4 CM 26-30 DNS
BIMS 19 * 29 * 33 EPS 4 CM 16 DNS WHITE
BRICK 29 * 19 * 23.5 LABOR CONCRETE LABOR
AAC 20 * 60 * 50 GLUE ADHESIVE SHEETSAND 0-3 cm PAINT 10 KG / BUCKETCEMENT 50 KG / BAG PÇ32.5 PLASTER BOARD RESISTANCE
WATER INSULATIONMATERIALS
BASED HYBRID UV and frost-resistant (BOSTİK Aoua BLOCKER) waterproofing material
Building Construction for Thermal Insulation
The Structure For Thermal Insulation
The Structure For Thermal Insulation
ENTRANCE
The Structure For Thermal Insulation
The Structure For Thermal Insulation
Thermal Camera
Contracts and service agreements with companies
Measurement with Thermal Camera
a one-year measurement
Climate Condition of Gumushane
Climate data for GümüşhaneMonth Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rec. high °C (°F)
13.0(55.4)
18.0(64.4)
24.0(75.2)
28.8(83.8)
32.0(89.6)
35.7(96.3)
41.0(105.8)
40.0(104.0)
37.0(98.6)
32.0(89.6)
22.0(71.6)
19.2(66.6)
Av high °C (°F) 2.5(36.5)
4.7(40.5)
9.6(49.3)
16.0(60.8)
20.8(69.4)
24.6(76.3)
28.1(82.6)
28.6(83.5)
25.2(77.4)
18.8(65.8)
10.2(50.4)
4.4(39.9)
Av low °C (°F) −6(21.2)
−5.3(22.5)
−1.4(29.5)
3.7(38.7)
7.3(45.1)
10.5(50.9)
13.7(56.7)
13.5(56.3)
9.9(49.8)
5.8(42.4)
0.6(33.1)
−3.4(25.9)
Rec. low °C (°F) −22.8(−9.0)
−25.7(−14.3)
−22.6(−8.7)
−11(12.2)
−2.8(27.0)
1.8(35.2)
4.5(40.1)
4.9(40.8)
−1(30.2)
−4.8(23.4)
−15(5.0)
−21(−5.8)
Avg. rainy days 11.4 11.2 13.0 13.9 15.8 10.5 4.4 3.9 5.5 9.6 10.3 11.6
Mean mon. Sun. hours 43.4 103.6 158.1 183 235.6 276 313.1 306.9 243 173.6 66 24.8
Climate Condition of Hakkari
[hide]Climate data for HâkkariMonth Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Average high °C (°F) −0.7(30.7)
0.9(33.6)
6.2(43.2)
12.7(54.9)
19.1(66.4)
25.6(78.1)
30.6(87.1)
30.8(87.4)
26.4(79.5)
18.6(65.5)
9.7(49.5)
2.3(36.1)
Daily mean °C (°F) −4.8(23.4)
−3.2(26.2)
2.0(35.6)
8.2(46.8)
14.2(57.6)
20.3(68.5)
24.9(76.8)
24.7(76.5)
20.3(68.5)
13.1(55.6)
5.1(41.2)
−1.7(28.9)
Average low °C (°F) −8.3(17.1)
−7(19.4)
−2(28.4)
3.9(39.0)
9.0(48.2)
14.1(57.4)
18.2(64.8)
18.0(64.4)
13.9(57.0)
7.9(46.2)
0.8(33.4)
−5.1(22.8)
Avg. rainy days 10.9 10.5 12.4 13.3 12.1 4.4 1.4 1 1.6 8.7 9.5 10.1
Mean mont.sun.h. 130.2 145.6 189.1 201 282.1 360 381.3 359.6 306 229.4 162 124
Climate Condition of Sakarya
The Aim Of The Thermal Insulation
The framework of this purpose, the following aims are desired to be reached;
• The effect of precipitation• The effect of heat factor• The effects of mountainous (altitude)• The effect of the wind• The seasonal effect• The effect of climate on the heat insulation materials• The inspection of the building sections (groundwork, column, joist, tiling, wall, roof)• The detection of thermal conductivity• A comparison between the cities in which implementations were done• The comparison of the effects of climate on heat insulation.
The Aim Of The Structure For Thermal Insulation
• Sakarya University will collect the data in the implementation area daily. The collected data will be entered into a computer program. The thermal camera views will be recorded.
• Collecting and archiving of these data are on the responsibility of the institution in the pilot city.
Valorisation Up To Date
Valorisation Up To Date
Valorisation Up To Date
Valorisation Up To Date
Valorisation Up To Date