Page 1: Demonstration School Renovation -   · PDF fileDOCUMENTS (Approval Set) 9'-6" ACT1 9'-6" ACT1 9'-6" ACT1 9'-6" ACT1 9'-0" ACT1 ... OFFICIAL BID DOCUMENTS SEPTEMBER 5,

These drawings and their associated specifications, ideas, concepts, arrangements, designs and layouts are, and shall remain the property of the architect and consultant and no part thereof shall be copied, disclosed or distributed to any other party, or used in connection with any work or project other than the specific work as noted on these drawings without the express written permission of the consultant. Visual contact with these drawings or specifications or any other intellectual propery associated with the project shall constitute acceptance of this policy. © Roland, Woolworth & Associates.

Roland, Woolworth & AssociatesConsultants in Acoustics & Audio Visual Technology

356 CR 102 Oxford MS 38655662.513.0665

www.rwaconsultants.net

These drawings and their associated specifications, ideas, concepts, arrangements, designs and layouts are, and shall remain the property of the architect and consultant and no part thereof shall be copied, disclosed or distributed to any other party, or used in connection with any work or project other than the specific work as noted on these drawings without the express written permission of the consultant. Visual contact with these drawings or specifications or any other intellectual propery associated with the project shall constitute acceptance of this policy. © Roland, Woolworth & Associates.

Roland, Woolworth & AssociatesConsultants in Acoustics & Audio Visual Technology

356 CR 102 Oxford MS 38655662.513.0665

www.rwaconsultants.net

As indicated

Col

umbu

s, M

issi

ssip

pi

2016111

RWA

Checker

2nd Floor AV Raceway RCP

E-AV1.5

Dem

onst

ratio

n Sc

hool

Ren

ovat

ion

G.S

.#10

4-18

7

Bure

au o

f Bui

ldin

g, G

roun

ds a

nd R

eal P

rope

rty M

anag

emen

t

MA

RK

DATE

DES

CR

IPTI

ON

SDJu

ne 1

7, 2

016

SCH

EMAT

IC D

ESIG

N

DD

Nov

embe

r 30,

201

6D

ESIG

N D

EVEL

OPM

ENT

CD

May

31,

201

7C

ON

STR

UC

TIO

N D

OC

UM

ENTS

(75%

)

PROJECT NO.

CHECKED BY:

DRAWN BY:

PryorMorrow PC

C 2017Copyright

SCALE:

PryorMorrow

CD

July

14,

201

7C

ON

STR

UC

TIO

N D

OC

UM

ENTS

(App

rova

l Set

)

ACT19'-6" ACT19'-6"

ACT19'-6"

ACT19'-6"

ACT19'-0"

ACT19'-6" ACT19'-6" ACT19'-6"

ACT19'-0"

ACT19'-6"

ACT19'-6"

GB9'-0"GB9'-0"

ACT19'-6"

ACT19'-6"

ES

12'-1" GB

EX

EX

10'-0" ACT3

ESES

ES

EX

10'-0" ACT3

ACT19'-0"

ACT19'-0"

GB12'-1"GB12'-1"

GB12'-1" GB12'-1"

GB12'-1"

8' - 10"8' - 10"

8' - 10"

8' - 10"

8' - 10"

9' - 3"

ACT19'-0"

ACT19'-6"

ACT19'-6"

IDF-2

PJ

SC

PJ

SC

To IDF-2

Down to AVK

SJ RF

Down to AVK Down to AVK

PJ

SC

Down to AVK

SJ RF

Down to AVK Down to AVK

SJ

RF

To IDF-2

To IDF-2

2nd Floor AV Raceway Reflected Ceiling PlanScale: 3/16" = 1'-0"1