Middle Potomac Watershed Plan Implementation
Dead Run Stream Restoration Project
Public MeetingMcLean Community Center
April 23, 2014
Stormwater Planning DivisionDepartment of Public Works and Environmental Services
![Page 2: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/2.jpg)
Meeting Outline
• Fairfax County Stormwater Management• Countywide Watershed Plan Implementation• Project Introduction and Objectives• Existing Conditions• Proposed Improvements - Options• Example Projects• Questions?
![Page 3: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/3.jpg)
Fairfax County Department of Public Works and Environmental Services (DPWES)Department of Public Works and
Environmental Services
Land Development
Services
CapitalFacilities Solid Waste Stormwater
Stormwater Planning Division
Maintenance and Stormwater
Management Division
Wastewater
![Page 4: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/4.jpg)
Stormwater Infrastructure
• Conveyance System– 1,600 miles pipe and
paved channel– 43,000 structures– 6,800 outfalls
• Management Facilities– 1,540 County Maintained – 3,720 Privately Maintained
• State Regulated Dams
![Page 5: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/5.jpg)
Service Drivers
In response to The Clean Water Act of 1972…
National Pollutant Discharge Elimination System (NPDES)Virginia Stormwater Management Program (VSMP)
RegulationsMunicipal Separate Storm Sewer Permit (MS4)Total Maximum Daily Loads (TMDLs)
Chesapeake BayLocal Streams
![Page 6: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/6.jpg)
Countywide Watershed Planning
“Healthy Watersheds, Healthy Communities”
• 30 Designated Watersheds
• All 15 watershed plans have been adopted by Fairfax County
http://www.fairfaxcounty.gov/dpwes/watersheds/
![Page 7: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/7.jpg)
Middle Potomac Watershed Plan
• Watershed Characterization– Water Quality Monitoring– Land Use Change– Pollutant Loading
• Structural Project– 25 year plan
• Non-Structural Practices– Policy and Regulations
http://www.fairfaxcounty.gov/dpwes/watersheds/
![Page 8: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/8.jpg)
Dead Run Watershed Plan
• Dead Run has a drainage area just over 3 mi2
• 24 priority projects identified in the watershed management plan
• Pond retrofits• LID Stormwater Enhancements• Stream Restoration• Neighborhood Stormwater
Improvementshttp://www.fairfaxcounty.gov/dpwes/stormwater/projects/project_list.htm
![Page 9: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/9.jpg)
Approximately 1/3 of the roof is covered in vegetation. The benefits of a “living roof” include:• Reduces the amount of stormwater runoff• Absorbs air pollution and carbon dioxide• Reduces the energy needed to cool the building in summer
Partnership: LID Stormwater EnhancementsDolley Madison Library
Vegetated Roof- Delosperma and Allium plants in bloom
![Page 10: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/10.jpg)
Partnership: LID Stormwater EnhancementsDolley Madison Library
Sustainable Site Design
![Page 11: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/11.jpg)
Dead Run – Before & After
Drainage Area(acres)
Phosphorous Removal(lbs/yr)
Nitrogen Removal(lbs/yr)
Sediment Removal(tons/yr)
415 15 283 3
Stream Restoration
![Page 12: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/12.jpg)
Dead Run – Stream Restoration
![Page 13: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/13.jpg)
Stream Monitoring Program
Study Objectives
1. Generate long-term monitoring data.
2. Evaluate relations between observed conditions/trends and BMP implementation.
3. Transfer the understanding gained to other less-intensively monitored watersheds.
http://va.water.usgs.gov/projects/ffx_co_monitoring.htm
![Page 14: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/14.jpg)
Dead Run Stream Restoration
![Page 15: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/15.jpg)
Dead Run Stream Restoration
Segment 1 – Dominican Retreat
• 2,000 Linear Feet
• Extends to Old Dominion Drive
• Residential lots along Merrimac Drive and Van Ness Court
![Page 16: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/16.jpg)
Dead Run Stream Restoration
Segment 2 – McLean Central Park
• 800 Linear Feet
• Completely in Park
• Starts below previously restored section near library
![Page 17: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/17.jpg)
Dead Run Stream Restoration
Segment 3 – McLean Central Park
• 1,500 Linear Feet
• Extends to Churchill Road
• Residential lots along Elizabeth Drive and Carol Rayes Street
![Page 18: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/18.jpg)
Next Steps
• Conceptual Design• Land Acquisition/Coordination• Preliminary Design• Public Meeting• Final Design• Project Construction
• Funding FY2016 and FY2017• Community Coordination: Pardon our Dust
• Maintenance and Operation
![Page 19: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/19.jpg)
Natural Channel Design
Background and Design Approach
![Page 20: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/20.jpg)
![Page 21: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/21.jpg)
![Page 22: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/22.jpg)
Stream Design Approaches Natural Channel Design
3 design approaches 1)Analog 2)Empirical 3)Analytical
![Page 23: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/23.jpg)
![Page 24: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/24.jpg)
![Page 25: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/25.jpg)
![Page 26: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/26.jpg)
Segment 1
Dominican Retreat
![Page 27: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/27.jpg)
![Page 28: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/28.jpg)
![Page 29: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/29.jpg)
![Page 30: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/30.jpg)
![Page 31: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/31.jpg)
![Page 32: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/32.jpg)
![Page 33: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/33.jpg)
![Page 34: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/34.jpg)
![Page 35: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/35.jpg)
![Page 36: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/36.jpg)
Segment 2 & 3
Mclean Central ParkDead Run Stream Valley Park
![Page 37: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/37.jpg)
![Page 38: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/38.jpg)
![Page 39: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/39.jpg)
![Page 40: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/40.jpg)
![Page 41: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/41.jpg)
![Page 42: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/42.jpg)
![Page 43: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/43.jpg)
![Page 44: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/44.jpg)
![Page 45: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/45.jpg)
![Page 46: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/46.jpg)
![Page 47: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/47.jpg)
![Page 48: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/48.jpg)
![Page 49: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/49.jpg)
Alternative Access
![Page 50: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/50.jpg)
Alternative Access
![Page 51: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/51.jpg)
Instream Structures
![Page 52: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/52.jpg)
Looking upstream at boulder rock toe and constructed riffle
Looking upstream at boulder rock toe – 2 and 3 courses
![Page 53: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/53.jpg)
Modified Cross Vane
![Page 54: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/54.jpg)
Modified Cross Vane
![Page 55: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/55.jpg)
Click icon to add picture
Cross Vane Cross Vane
Cross Vane
![Page 56: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/56.jpg)
Step Pool
![Page 57: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/57.jpg)
Infill mix comprised of cobbles, gravels, sand, silt, topsoil
Larger material, usually cobble
Constructed Riffle(aka Reinforced Streambed)
![Page 58: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/58.jpg)
Riffle
![Page 59: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/59.jpg)
Access
![Page 60: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/60.jpg)
During May 2010
BeforeFeb. 2010
AfterSept. 2010
![Page 61: Dead Run Stream Restoration Public Meeting April 23, 2014](https://reader035.vdocuments.site/reader035/viewer/2022062522/589d2d051a28abeb478b6e4f/html5/thumbnails/61.jpg)
John Palmer, [email protected]
Dipmani Kumar, [email protected]
Matt Meyers, [email protected]
Stormwater Planning DivisionDepartment of Public Works and Environmental ServicesFairfax County12000 Government Center Parkway, Suite 449Fairfax, Virginia 22035
www.fairfaxcounty.gov/dpwes/stormwater
Questions ?
• Contact Information
A Fairfax County Publication, April 2014ADA Statement: To request this information in an alternate format call 703-324-5500, TTY 711