2
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Meeting Outline
• Fairfax County Stormwater Management• Countywide Watershed Plan Implementation• Project Scope, Status, and Next Steps• Concept Plan Overview
– Basis for design– Tree save options– Floodplain analysis and review of more frequent storm impacts– Buffer restoration measures– Examples
• Q&A• Walk to site
![Page 3: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/3.jpg)
3
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
DPWES Organization
Department of Public Works and Environmental Services
Land Development
Services
CapitalFacilities
Solid Waste Stormwater
Stormwater Planning Division
Maintenance and Stormwater
Management Division
Wastewater
![Page 4: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/4.jpg)
4
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Stormwater Infrastructure
• Conveyance System– 1,600 miles pipe and
paved channel– 43,000 structures– 6,800 outfalls
• Management Facilities– 1,540 County Maintained – 3,720 Privately Maintained
• State Regulated Dams
![Page 5: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/5.jpg)
5
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Service Drivers
In response to The Clean Water Act of 1972…
• National Pollutant Discharge Elimination System (NPDES)• Virginia Stormwater Management Program (VSMP) Regulations• Municipal Separate Storm Sewer Permit (MS4)• Total Maximum Daily Loads (TMDLs)
– Chesapeake Bay– Local Streams
![Page 6: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/6.jpg)
6
Dead Run– Stream Conditions
![Page 7: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/7.jpg)
7
Dead Run Segment 1 Stream Restoration Project
Countywide Watershed Planning
“Healthy Watersheds, Healthy Communities”
• 30 Designated Watersheds• All 15 watershed plans have
been adopted by Fairfax County
http://www.fairfaxcounty.gov/dpwes/watersheds/
![Page 8: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/8.jpg)
8
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Middle Potomac Watershed Plan
• Watershed Characterization– Water Quality Monitoring– Land Use Change– Pollutant Loading
• Structural Project– 25 year plan
• Non-Structural Practices– Policy and Regulations
http://www.fairfaxcounty.gov/dpwes/watersheds/
![Page 9: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/9.jpg)
9
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Dead Run Watershed Plan
• Dead Run has a drainage area just over 3 mi2
• 24 priority projects identified in the watershed management plan
• Pond retrofits• LID Stormwater Enhancements• Stream Restoration• Neighborhood Stormwater
Improvementshttp://www.fairfaxcounty.gov/dpwes/stormwater/projects/project_list.htm
![Page 10: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/10.jpg)
10
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Partnership LID Stormwater Enhancements - Dolley Madison Library
Approximately 1/3 of the roof is covered in vegetation. The benefits of a “living roof” include:
• Reduces the amount of stormwater runoff• Absorbs air pollution and carbon dioxide• Reduces the energy needed to cool the building in summer
Vegetated Roof- Delosperma and Allium plants in bloom
![Page 11: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/11.jpg)
11
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Partnership LID Stormwater Enhancements - Dolley Madison Library
Sustainable Site Design
![Page 12: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/12.jpg)
12
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Stream Monitoring Program
Study Objectives
1. Generate long-term monitoring data.
2. Evaluate relations between observed conditions/trends and BMP implementation.
3. Transfer the understanding gained to other less-intensively monitored watersheds.
http://va.water.usgs.gov/projects/ffx_co_monitoring.htm
![Page 13: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/13.jpg)
13Stormwater Planning Division
Dead Run Segment 1 Stream Restoration Project
Stream Restoration Pictures
Government Center Stream Restoration - Before & After
![Page 14: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/14.jpg)
14
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Stream Restoration
Dead Run In Mclean Central Park – Before & After
Drainage Area(acres)
Phosphorous Removal(lbs/yr)
Nitrogen Removal(lbs/yr)
Sediment Removal(tons/yr)
415 15 283 3
![Page 15: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/15.jpg)
15
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Dead Run – Stream Restoration
![Page 16: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/16.jpg)
Dead Run Segment 1 Stream Restoration Project
Stormwater Planning Division
Dead Run –Stream Restoration
16
August 2014January 2010
![Page 17: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/17.jpg)
17Stormwater Planning Division
Dead Run Segment 1 Stream Restoration Project
Project Limits
Segment 1– Dominican Retreat• 2,000 Linear Feet
• Extends to Old Dominion Drive
• Residential lots along Merrimac Drive and Van Ness Court
![Page 18: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/18.jpg)
18Stormwater Planning Divison
Dead Run Segment 1 Stream Restoration Project
Project timeline• Project initiated: Fall, 2013.
• Surveys and assessment completed: Winter, 2013
• Pre-concepts submitted: April, 2014
• First public meeting – April 23, 2014
• Acquired floodplain and storm drainage easement on the Dominican Retreat property – Ongoing
• Public meeting with residents of surrounding properties – June 10, 2015
![Page 19: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/19.jpg)
19Stormwater Planning Division
Dead Run Segment 1 Stream Restoration Project
Next steps with target dates
• Receive concept design comments from residents
• Inform residents of locations where project abuts their property and where work will take place within existing easements on their property
• Develop 95% design plans by September, 2015
• Final design phase public meeting, late September, 2015
• Final plan authorization and bidding phase – TBD based on funding and approved budget
• Target is early, 2016
• Pardon Our Dust meeting with residents and contractor before issuing construction notice to proceed.
![Page 20: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/20.jpg)
Agenda
1 Basis for Design
2 Trees
3 Design Plan
4 Critical Erosion Areas
5 Pedestrian Bridge Replacement
![Page 21: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/21.jpg)
1 Basis for Design
• Stable Channel• Understanding of
Floodplain• Address Erosion
![Page 22: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/22.jpg)
1 Basis for Design • Natural Channel Design (NCD) Approach – Reference Reach, Analytical,
Regional Relationships and hydraulic analysis
• Stream Pattern, Profile and Section
• Range of Values for Stable Stream Pattern
• Tree Loss is Unavoidable but Provides Opportunity to Improve Riparian Diversity
![Page 23: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/23.jpg)
1 Basis for Design • Establish Goals:
• 1. Improve Flow Conditions in the Channel through Adjustments to Plan/Profile/Section
• 2. Create a Stable Channel by Reducing Bed/Bank Erosion that has Benefit of Reducing Contributions of Nitrogen and Phosphorus (i.e. Water Quality Improvement)
• 3. Improve Channel Geomorphology and Opportunities for Species Diversity (i.e. Use Structures to Stabilize Channel and Create Pool Habitats)
• 4. No-Rise / No-Impact of the Floodplain
![Page 24: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/24.jpg)
![Page 25: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/25.jpg)
![Page 26: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/26.jpg)
2 Trees
12” and Larger Trees:• ~190 trees 12” and larger assessed within the project area• ~19 trees 12” and larger are “at risk”
• ~11 of the “at risk” trees may be removed
• Low Diversity of Species: ~45% tuliptree, ~24% red maple• ~39 Trees proposed to be removed
• A few additional trees maybe removed for new storm pipe to address drainage issues.
![Page 27: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/27.jpg)
3 Design Plan - Overall
Map of the entire project limits with property lines and easements shown
![Page 28: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/28.jpg)
3 Design Plan - Overall
Map of the entire project limits with property lines and easements shown
![Page 29: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/29.jpg)
3 Design Plan - Overall
![Page 30: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/30.jpg)
3 Design Plan - Overall
![Page 31: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/31.jpg)
3 Design PlanExhibits where the limits of disturbance enters individual property owners’ lots
![Page 32: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/32.jpg)
3 Design PlanExhibits where the limits of disturbance enters individual property owners’ lots
![Page 33: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/33.jpg)
3 Design PlanExhibits where the limits of disturbance enters individual property owners’ lots
![Page 34: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/34.jpg)
3 Design PlanExhibits where the limits of disturbance enters individual property owners’ lots
![Page 35: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/35.jpg)
3 Design PlanExhibits where the limits of disturbance enters individual property owners’ lots
![Page 36: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/36.jpg)
3 Design PlanExhibits where the limits of disturbance enters individual property owners’ lots
![Page 37: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/37.jpg)
4 Critical Erosion Areas
![Page 38: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/38.jpg)
4 Critical Erosion Areas
Left Bank
Left Bank
Right Bank
Driveway
![Page 39: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/39.jpg)
5 Pedestrian Bridge – Wood Bridge
Two new bridges and one fair weather crossing.
![Page 40: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/40.jpg)
5 Pedestrian Bridge – Wood Bridge
Two new bridges locations
Bridge #1Bridge #2
![Page 41: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/41.jpg)
5 Pedestrian Bridge – Fair Weather Crossing
Two new bridges and one fair weather crossing.
![Page 42: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/42.jpg)
5 Pedestrian Bridge – Wood Bridge
Fairweather Crossing
![Page 43: Dead Run Segment One Stream Restoration Project](https://reader036.vdocuments.site/reader036/viewer/2022062420/55cd4f3fbb61ebfa4b8b45e6/html5/thumbnails/43.jpg)
43
Joe Riley-Ryan, [email protected]
Dipmani Kumar, [email protected]
Matt Meyers, [email protected]
Stormwater Planning DivisionDepartment of Public Works and Environmental ServicesFairfax County12000 Government Center Parkway, Suite 449Fairfax, Virginia 22035
www.fairfaxcounty.gov/dpwes/stormwater
• Contact Information
A Fairfax County Publication, April 2014ADA Statement: To request this information in an alternate format call 703-324-5500, TTY 711