Transcript
Page 1: Datacenter event - pitch - hitec ups - salvatore fiorenza - 15-09-14
Page 2: Datacenter event - pitch - hitec ups - salvatore fiorenza - 15-09-14

Power solutions Best Practice Experience

Page 3: Datacenter event - pitch - hitec ups - salvatore fiorenza - 15-09-14

Fast tracks tips on the Fieldto take in considerations

• Choice a engineering company that has experience in the datacenter and not limited only to static Technologie but has also experience in Dynamic solutions

• Don’t limit your ups requirements to static solutions, take in considerations also Dynamic.

• The critical power availability should be limited to number of suppliers because improves the availability.

• Calculate good financial TCO but practical TCO• Take all expects in considerations, eg: space, life time and other costs• Choose long existing proven technologies, witch also improve power quality and is

always online.• My experience is that Dynamic solution is for long term cheaper , easer to maintain.• Calculate long term PEU • Battery FREE solutions will reduce less of outage• Take in considurations to choice a solutions that improce the POWER QUALITY

Page 4: Datacenter event - pitch - hitec ups - salvatore fiorenza - 15-09-14

Hitec Global

Page 5: Datacenter event - pitch - hitec ups - salvatore fiorenza - 15-09-14

Existing Customers that use Dynamic solutions

Data centre

Semiconductor

Telecom

Finance

Aviation

Process industry

Healthcare

Pharmaceutical

Textile

24/7 manufacturing

Government

Defense


Top Related