Traditional Reliability Indexes Measure System Averages
CAIDI Measures Duration
SAIFI Measures Outage Frequency
SAIDI Measures Accumulated Time Off
MAIFI Measures Momentary Interruptions
![Page 3: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/3.jpg)
M L G W’s 2003 Reliability Performance
SAIFI 1.41 events
CAIDI 169 minutes
SAIDI 238 minutes
![Page 4: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/4.jpg)
Customer Average Interruption Duration Index
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003
5 YEAR WEIGHTED MOVING AVERAGES IN REDThrough First Quarter 2003
![Page 5: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/5.jpg)
SYSTEM AVERAGE INTERRUPTION FREQUENCY
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
1985 1987 1989 1991 1993 1995 1997 1999 2001 2003
5 YEAR MOVING AVERAGES (WEIGHTED)
![Page 6: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/6.jpg)
CUSTOMERS
EXPERIENCING
MULTIPLE
INTERRUPTIONS
0.00
20.00
40.00
60.00
80.00
100.00
%
of
C
U
S
T
O
M
E
R
S
1+ 2+ 3+ 4+ 5+ 6+N u m b e r of I n t e r r u p t i o n s
344,529
242,138
153,480
85,674
46,039
25,111
C. E. M. I. 2002
![Page 7: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/7.jpg)
What Reliability Do Customers Demand ??
“Your most unhappy customers are your greatest source of learning.”
-Bill Gates
![Page 8: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/8.jpg)
Analyzed Three Years of Customer Reliability Complaints
• Over 600 Complaints about Outage Frequency
• Over 250 Complaints about
Outage Duration
![Page 9: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/9.jpg)
0
20
40
60
80
100
120# O
F C
OM
PL
AIN
TS
PE
R 1
0,0
00 C
US
TO
ME
RS
Customer Complaint CatalystsOutage Duration
Less than4 hours
4 to 6hours
6 to 10hours
Over 10hours
![Page 10: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/10.jpg)
0
5
10
15
20
25
30
35
40# o
f C
om
pla
ints
per
10,0
00 C
usto
mers
1 Month6 Months Interruptions During 12 Months
222 33
3
4+
6+
4+
4
5
Customer Complaint CatalystsOutage Frequency
![Page 11: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/11.jpg)
Customer Oriented Reliability
Prevent Customers from Experiencing Over 3 Interruptions Per Year
Prevent Outage Events Over 10 Hours in Duration
![Page 12: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/12.jpg)
Strategic
Targeting of
Assets for
Reliability
![Page 13: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/13.jpg)
Reliability Strategies
• Effective line clearance (Hybrid 3-4-5 Cycle)
• Reduction in recurring events
• Strategically address root causes
• Target long-duration outages
![Page 14: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/14.jpg)
Tree Trimming
• Analyzed cycle and emergency trimming
• Hybrid 3-4-5 Plan
![Page 15: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/15.jpg)
Unfused Taps
• Isolate Interruptions to Small Numbers of Customers on Laterals by Installing Line Fuses
![Page 16: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/16.jpg)
Retrofitting Underground Cable
• Continue aggressive cable replacement for PE cable
• Replace PILC get-away cable that has reached end-of-life
![Page 17: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/17.jpg)
Reclosers & Sectionalizers
35 new reclosers
• Reduce number of customers interrupted
• Save wear and tear on station breaker
• Protect cable getaway• Speeds troubleshooting
![Page 18: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/18.jpg)
Under grounding circuits
Reduce exposure to trees, vehicles, & lightning by under grounding high-risk segments of circuits.
![Page 19: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/19.jpg)
Reliability Goals YTD February, 2004
Customers with more than 3 outages: 69
Customers with 10+ hours outages: 22
![Page 20: Customer Oriented Reliability](https://reader033.vdocuments.site/reader033/viewer/2022051316/5681461f550346895db3285f/html5/thumbnails/20.jpg)