A Brief Overview of Open Access and Retail Competition
![Page 2: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/2.jpg)
Current Set-up
Generation Transmission
Distribution
CaptiveCustomer
With OARC
Contestable Customer
Single Billing
DistributionTransmissionGeneration
Single Billing RES/Local
RES
![Page 3: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/3.jpg)
3
Competitive generation
Regulated transmission
and distribution
Competitive retail
providers
End-
users Reformed Power Sector
![Page 4: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/4.jpg)
Section 29. Creation of the electricity supply sector
Section 31. Pre-conditions for open access and retail competition
Legal Basis
![Page 5: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/5.jpg)
5 Conditions Precedent
Unbundling Removal of
Subsidy
WESM NPC AssetsPrivatization
IPP Administrator
![Page 6: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/6.jpg)
What are we looking forward to?
2011
• Declaration• Open Access
Date• 1 MW & up
2013
• 750 kW• Aggregation
2021
• Household demand level
![Page 7: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/7.jpg)
Building the Framework
7
Rules governing open access and retail competition• Rules defining the qualification of suppliers
and customers;• Rules governing the behavior and conduct of
the market participants;• Rules ensuring the provision of continuous
supply of electricity for the protection of the contestable customers;
• Rules governing the commercial transfer of customer from one supplier to another
![Page 8: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/8.jpg)
8
Building the Framework
RES Licensing Guidelines
Business Separation Guidelines
(BSG)
Code of Conduct
Competition Rules
Supplier of Last Resort
(SoLR)
DSOAR
Rules on Customer Switching
(RCS)
Rules for Contestability
![Page 9: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/9.jpg)
Considerations
9
Provisions of the EPIRA and its IRR
Sound economic and regulatory principles
Best practices in other jurisdictions
![Page 10: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/10.jpg)
NEW PLAYERS
Contestable Customers
Retail Electricity Supplier (RES)
BUYERS SELLERS
676 - Luzon 65 - Visayas
14 licensed RES
1 potential SOLR for every DU’s franchise area
1 potential Local RES for every DU’s franchise area
Local RES
Supplier of Last Resort (SOLR)
![Page 11: Current Set-up Generation Transmission Distribution Captive Customer With OARC Contestable Customer…](https://reader031.vdocuments.site/reader031/viewer/2022021915/5a4d1bf77f8b9ab0599e94d7/html5/thumbnails/11.jpg)
Transitory Rules for the Initial Implementation of Open Access and Retail Competition
On-going (PubCon: Sept. 13, 2011 for 2nd Draft)
Clarifies pre-operational issues to ensure the smooth transition to a competitive retail electricity market
Provides procedures regarding the entry of participants into the competitive retail electricity market
Simplified switching process
11