Agenda
• Introduction• CPR and Standards update• Lunch• Residential Cabling Solutions: A Modern Approach• Data Centre Solutions – Scalable Holistic Design Philosophy• Factory Tour• Q&A
![Page 3: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/3.jpg)
Connectix Cabling Systems – About Us
• Sold in over 70 Countries
• UK Factory and offices in Braintree, Essex• UAE office in Dubai• Design/Technical Office in Taiwan• Rack Build Facility in Braintree• Manufacturing plant in Mildenhall, Suffolk• Custom Rack/Product Design team• CCS Product line covers Commercial, Residential, Broadcast industries
![Page 4: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/4.jpg)
• Compliance to Expert Panel TCT/7/-/2 "Telecommunications - Installation requirements –Cabling infrastructure, design, planning and commissioning“
• Compliance to Expert Panel TCT/7/-/3“Telecommunications - Installation requirements - Cabling infrastructure, design, planning and commissioning (Data Centres)“
• Compliance with IST/046“Sustainability for, and by IT”
• Reports into
– International (ISO) Committees
– European (CENELEC) Committees
Connectix Commitment to Standards
![Page 5: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/5.jpg)
• 25 Year Warranty• CCS Partner Programme (ESP, ECP & EDP)
• Independently tested to ISO 11801 standards• Delta verification for both channel and component • Delta inspected manufacturing capabilities
• Comprehensive CCS system product range• In excess of 1,600 products• Copper / Fibre (standard, MTP, Blown, Broadcast) / voice / cabinets / PDU’s
(standard & intelligent) / tool less keystone jacks / low profile modules / Custom Enclosures / Environmental Management Solutions
Positioning Connectix Cabling Systems in the Industry
![Page 6: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/6.jpg)
Current Standards Update
![Page 7: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/7.jpg)
Current Standards
EN
![Page 8: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/8.jpg)
ISO• ISO/IEC 11801 Ed.2: 2002
• Information technology –Generic cabling for customer premises
• Amendment 1 – ISO/IEC 11801: Ed. 2.1: 2008• Class EA and Class FA channels• New channel parameters• Amendments to channel Classes D, E and F
• Amendment 2 – ISO/IEC 11801 Ed 2.2: 2010• Published April 2010• Contains
• Class EA and Class FA links• OM4• 40 & 100 Gigabit Ethernet• Fibre Channel
![Page 9: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/9.jpg)
EN – CENELEC
• Automatically adopted by the member state as a standard – in the UK case British Standards
• BS EN 50173 Information technology – Generic cabling systems• BS EN 50174 Information technology – Cabling installation
![Page 10: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/10.jpg)
EN – CENELEC
• Automatically adopted by the member state as a standard – in the UK case British Standards
• BS EN 50173 Information technology – Generic cabling systems• BS EN 50173-1:2011 Part 1: General requirements
• The combination of the standard and the amendments + A1:2009 + A2:2011• BS EN 50173-2:2007 Part 2: Office premises• BS EN 50173-3:2007 Part 3: Industrial premises• BS EN 50173-4:2007 Part 4: Homes• BS EN 50173-5:2007 Part 5: Data centres• BS EN 50173-6:2013 Part 6: Distributed Building Services
• BS EN 50174 Information technology – Cabling installation
![Page 11: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/11.jpg)
EN – CENELEC
• Automatically adopted by the member state as a standard – in the UK case British Standards
• BS EN 50173 Information technology – Generic cabling systems• BS EN 50174 Information technology – Cabling installation
• BS EN 50174-1:2009 Part 1: Installation specification and• quality assurance• BS EN 50174-2:2009 + A1:2011 Part 2: Installation planning and practices inside buildings• BS EN 50174-3:2013 Part 3: Installation planning and practices outside buildings
![Page 12: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/12.jpg)
• BS 6701:2010• Telecommunications equipment and telecommunications cabling.
Specification for installation, operation and maintenance• Published 31st March 2010
• BS 7671: Amendment 3: 2015• Requirements for electrical installations. IET Wiring Regulations.
Seventeenth edition, 3rd Revision
British Standards
![Page 13: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/13.jpg)
TIA
• ANSI/TIA-568-D Published 2015• ANSI/TIA-568.0-D Generic Telecommunications Cabling for Customer
Premises Ed. D:2015• ANSI/TIA-568.1-D Commercial Building Telecommunications Cabling
Standard Ed. D:2015• ANSI/TIA-568-C.2 Balanced Twisted-Pair Telecommunications Cabling
and Components Standard Ed. C:2014• ANSI/TIA-568.3-D Optical Fibre Cabling Components Standard Ed.
3:2016• ANSI/TIA-568-C.4 Coaxial and Broadband Components (Released
August 2011)
![Page 14: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/14.jpg)
Are there legal requirements?
• Standards are not necessarily law• Contracts are law
• Be careful what you sign up to!• It is impossible to comply with ISO EN & TIA standards at the same
time• What would reasonably be expected
• Start with National Standards• i.e. BS EN
![Page 15: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/15.jpg)
Which should I use?
• Always refer to the UK & EN series (BS EN)• Design – EN 50173 series• Installation O&M – BS6701• Admin, Spaces, Pathways, Pathway systems – EN 50174
series• Installation – EN 50174 series• Functional Bonding – EN 50174 series & EN 50310• Testing – EN 50173 series
*Always Specify Component Compliant Solutions to ISO 11801*Always ask for 3rd Party Certification
![Page 16: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/16.jpg)
New European Standard – Data Centres
• EN 50600 Series• Holistic approach
• Bringing in all disciplines• No one discipline can do it all
![Page 17: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/17.jpg)
EN 50600
• Data centre facilities an infrastructure• Part 1 – General concepts• Part 2.1 – Building construction• Part 2.2 – Power supply and distribution• Part 2.3 – Environmental control• Part 2.4 – Telecommunications cabling• Part 2.5 – Security systems• Part 2.6 – Management and operational information
![Page 18: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/18.jpg)
Classes, Categories and Constructions
![Page 19: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/19.jpg)
Application Classes
• The ISO and EN Standards use Application Classes for the definition of Channels & Links:
• Class C 16 MHz• Class D 100 MHz• Class E 250 MHz• Class EA 500 MHz• Class F 600 MHz• Class FA 1 GHz
![Page 20: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/20.jpg)
EIA/TIA Categories of Cabling
• Category 3 10 MHz• Category 4 20 MHz• Category 5 100 MHz• Category 5e 100 MHz • Category 6 250 MHz• Category 6a 500 MHz• Category 7 N/A• Category 7a N/A
![Page 21: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/21.jpg)
Cable Types
![Page 22: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/22.jpg)
The Impact of Construction Product Regulations (CPR)
![Page 23: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/23.jpg)
Construction Product Regulations 2017
• Implemented in 2013 under the EU Construction Products Directive• Based around Fire Performance• Certified to EuroClass Standards• Results in the use of CE Mark on Data Cables• Governed within EN50575• EN50575 Harmonised in July 2016 – mandatory in July 2017• Independent Tests Required within the EU by a “Notified Body”
approved by the country of issue and adopted by the country standards body
• Standard now BS EN 50575: 2014 + A1: 2016
![Page 24: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/24.jpg)
What is a Construction Product?“Any product or kit which is produced and placed on the market for incorporation in a permanent manner in construction works or parts thereof and the performance of which has an effect on the performance of the construction works with respect to the basic requirements for construction works”
For example:
![Page 25: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/25.jpg)
Cable Fire testing Methodologies
Two methodologies in terms of flame spread over time:
IEC 60332-1-2:A calibrated “Bunsen burner” type flame is applied (1kW) to a single cable sample for a duration dependent on the cable diameter (1-4 minutes). Once the burner is removed, the sample should self extinguish. If the char length is less than 425mm, the sample meets the requirements
IEC 60332-3:A calibrated flame is applied (20kW) to a cable array on a ladder representative of a building riser. Volumes of combustible material from 7l/m to 0.5l/m are attached to the ladder, and the flame is applied for either 20 or 40 minutes (dependent on category of performance).
Flame spread of less than 2.5m are deemed to meet the requirements.
![Page 26: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/26.jpg)
Cable Fire testing Methodologies
Additional requirements to assess the performance of cable in the event of fire for evacuation purposes:
IEC 60754:Material samples are incinerated in a tube furnace, and the effluent gases are analysed for HCl or pH and conductivity. This determines the level of acidic effluent evolved from a prescribed amount of material. There are limits that the materials need to meet to be considered Halogen free.
IEC 61034:A cable specimen is burnt in a closed 3m3 chamber using an alcohol flame. The reduction in light transmittance due to the the resulting smoke is measured optically. There are certain limits defined in cable design specifications that are required to be met for the cables to be considered low smoke.
![Page 27: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/27.jpg)
Cable Fire testing MethodologiesEuroclass Classification
Performance is based on a test SIMILAR to BS EN 60332-3 BUT:
Different Array (Based on diameter of cable)
Calorimetry/smoke detection equipment in Analysis section of extraction hood/ductAdditional measurements:
Total Heat Release (MJ)
Rate of Heat Release (kW)FIGRA (Fire Growth Rate Index W/s
Euroclass is derived from this along with char height for Classes B1-D, with BS EN 60332-1 (Bunsen Burner) for class E. Class F is a Failure to meet class E requirements.
![Page 28: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/28.jpg)
Cable Fire testing Methodologies – Specific Parameters
Euroclass Classification
Total Heat Release (MJ):The total heat evolved which is attributable to the cable. The energy evolved (MJ) once the burner has been subtracted.
Rate of Heat Release (kW):The rate that the burning cable evolves heat energy.
FIGRA (Fire Growth Rate- Ws-1)The rate at which the cable fire grows.
Additional classifications:Smoke DropletsAcidityEach of the 3 additional classifications has 3 levels of performance
![Page 29: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/29.jpg)
Euroclass Standards – What are they?• Classified as Performance in reaction to fire• Aca to Fca Euroclass Standards• Aca highest performance• Fca defined as performance determined
![Page 30: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/30.jpg)
Construction Product Regulations 2017
• All Manufacturers are now required to publish a Declaration of Performance
![Page 31: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/31.jpg)
Construction Product Regulations 2017
• All Product shipped after July 1st 2017 has to show CE Certofocation on the Packaging
![Page 32: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/32.jpg)
CCS System OfferingCopperCategory 3 UTPCategory 5e U/UTP and F/UTPCategory 6 U/UTP and F/UTPCategory 6A U/UTP, U/FTP and F/FTPCategory 7A S/FTP
FibreInternal/External Grade CablePatch Cords and Pigtails – ST, SC, LCConnectors and AdaptorsPatch PanelsMTPBlown Fibre
VoiceInternal Grade CablingExternal Grade Cabling
CabinetsFloor Standing Cabling CabinetsFloor Standing Equipment and Server Cabinets2 Post FramesWall Mount EnclosuresAccessoriesPDUs – Standard, Modular and Intelligent
![Page 33: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/33.jpg)
Power over Ethernet (PoE)
![Page 34: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/34.jpg)
POE - Power over Ethernet
• 802.3af Standard POE – 15.4/12.95W• Published in 2003• 15.4 Watts Powering – 12.95 Watts Powered• What is sent and what is received, the rest is lost in transmission
• 802.3at Enhanced POE or POE+• Published in 2009• 34.2 Watts Powering – 25.5 Watts Powered
• 802.3bt POE++• Work group started 2013 – no end date for publication• Minimum 49W could be in excess of 100W, 4 pair powering• Cisco’s UPoE could still play a part
![Page 35: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/35.jpg)
Equipment Vendor Claims
Market Application Power
WLAN Dual-band Aps802.11n ApsOutdoor Aps
~20W~20W20-30W
Security PTZ network cameras 15-20W
IP Telephony Video phones 15-25W
New Markets RFID readers/access controlWiMAX base stationsWorkgroup switchesResidential gatewaysIndustrial sensorsLaptopsPOS + information kiosks
Up to 25W15-60WUp to 50W~20W1-30WUp to 70W13-60W
![Page 36: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/36.jpg)
POE - Power over Ethernet
• Design Considerations & Misconceptions• Heat and lots of it!• TR29125• WD TR EN 50174-99-1
• Testing Methodology Complete• Work under way at various locations• CCS have conducted testing in conjunction with De Montfort
University• Results have been shared with ISO/Cenelec
![Page 37: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/37.jpg)
POE – Power over Ethernet
![Page 38: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/38.jpg)
POE – Power over Ethernet
![Page 39: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/39.jpg)
The Impact of CAT6A on Containment
• Impact on Bend Radii• Do the maths!
• 8 times OD during installation, 4 times OD when installed(under tension and relaxed)
• Over to 64mm when pulling in and 32mm when installed• Double check the claims of the containment manufacturers – they need to
fit!
![Page 40: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/40.jpg)
Containment
• If in doubt, use the containment calculator.
www.CCS-networking.com/containmentcalculator
![Page 41: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/41.jpg)
The Impact of CAT6A
Part 1 of BS/EN 50174 states The Design of the termination points SHALL:• Allow safe access• Ensure link performance (Keep MBR)• Have adequate clearance to install components in accordance with
cable manufacturer’s instructions.
![Page 42: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/42.jpg)
How to get it Wrong
![Page 43: Connectix Cabling Systems · • Data centre facilities an infrastructure • Part 1 – General concepts • Part 2.1 – Building construction • Part 2.2 – Power supply and](https://reader035.vdocuments.site/reader035/viewer/2022070911/5fb2445f20804a0fe85eed2f/html5/thumbnails/43.jpg)
And Remember - Third Party Verification
• Category 6 and Category 6A systems carry both Channel and Component certification