Download - Coltyn and Austin
Transcript
![Page 1: Coltyn and Austin](https://reader036.vdocuments.site/reader036/viewer/2022070301/5461aefdaf795957658b58a5/html5/thumbnails/1.jpg)
C.ABridge building
Any time
Any where
![Page 2: Coltyn and Austin](https://reader036.vdocuments.site/reader036/viewer/2022070301/5461aefdaf795957658b58a5/html5/thumbnails/2.jpg)
Here is the location of our bridge
![Page 3: Coltyn and Austin](https://reader036.vdocuments.site/reader036/viewer/2022070301/5461aefdaf795957658b58a5/html5/thumbnails/3.jpg)
Here is Our Sketch-Up Model
![Page 4: Coltyn and Austin](https://reader036.vdocuments.site/reader036/viewer/2022070301/5461aefdaf795957658b58a5/html5/thumbnails/4.jpg)
Our Bridges Facts
• Our bridge cost $10,000,000
• Is in the Upper Peninsula
• Is 1.1 miles long
![Page 5: Coltyn and Austin](https://reader036.vdocuments.site/reader036/viewer/2022070301/5461aefdaf795957658b58a5/html5/thumbnails/5.jpg)
To Get A Hold of Us
• Call us at 1-800-4606
• Thank You
• And Have a Nice Day